2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB 50487-2008
GB 50487-2008   Code for engineering geological invcstigation of water resources and hydropower (English Version)
Standard No.: GB 50487-2008 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 53000 words Translation Price(USD):1060.0 remind me the price change

Email:

Implemented on:2009-8-1 Delivery: via email in 1 business day

→ → →

,,2009-8-1,14113818185963A897FE907A5BE4F
Standard No.: GB 50487-2008
English Name: Code for engineering geological invcstigation of water resources and hydropower
Chinese Name: 水利水电工程地质勘察规范
Chinese Classification: P55    Water conservancy and water power engineering in general
Professional Classification: GB    National Standard
Source Content Issued by: MOHURD
Issued on: 2008-12-15
Implemented on: 2009-8-1
Status: valid
Target Language: English
File Format: PDF
Word Count: 53000 words
Translation Price(USD): 1060.0
Delivery: via email in 1 business day
1 General Provision 1.0.1 This Code is formulated with a view to standardizing engineering geological investigation work of water resources and hydropower, defining investigation work depth and requirements, as well as ensuring investigation work quality. 1.0.2 This Code is applicable to large-scale engineering geological investigation work of water resources and hydropower. 1.0.3 Engineering geological investigation of water resources and hydropower should be classified into such phases as planning, project proposal, feasibility study, preliminary design, bidding design and construction details design. Investigation work at project proposal phase should basically satisfy the depth requirements of feasibility study phase. 1.0.4 Danger release and strengthening engineering investigation for dangerously weak reservoir should be classified into such three phases as safety evaluation, feasibility study and preliminary design. 1.0.5 Engineering geological investigation of water resources and hydropower shall comply with not only this Code but also those stipulated in the current relevant ones of the nation. 2 Terms and Symbols 2.1 Terms 2.1.1 Active fault The fault with activities that has been formed since the Late Pleistocene epoch (100,000 years) 2.1.2 Reservoir leakage The phenomenon that water body leaks from the reservoir through the rock-soil mass in the reservoir basin to outside, thus losing water.
Contents 1 General Provision 2 Terms and Symbols 2.1 Terms 2.2 Symbols 3 Basic Requirements 4 Engineering Geological Investigation during Planning Phase 4.1 General Requirements 4.2 Regional Geology and Earthquake 4.3 Reservoir 4.4 Dam Site 4.5 Water Diversion Engineering 4.6 Flood Prevention and Drainage Engineering 4.7 Irrigation Area Engineering 4.8 River Regulation Engineering 4.9 Natural Building Material 4.10 Investigation Report 5 Engineering Geological Investigation during Feasibility Study Phase 5.1 General Requirements 5.2 Regional Tectonic Stability 5.3 Reservoir 5.4 Dam Site 5.5 Power Generation and Water Diversion Line and Plant Site 5.6 Spillway 5.7 Canal and Canal Structures 5.8 Sluice and Pumping station 5.9 Deep and Long Tunnel 5.10 Embankment and Flood Diversion and Storage Engineering 5.11 Irrigation Area Engineering 5.12 River Regulation Engineering 5.13 Resettlement Sites 5.14 Natural Building Material 5.15 Investigation Report 6 Engineering Geological Investigation during Preliminary Design Phase 6.1 General Requirements 6.2 Reservoir 6.3 Earth-rock Dam 6.4 Concrete Gravity Dam 6.5 Concrete Arch Dam 6.6 Spillway 6.7 Ground Power House 6.8 Underground Power House 6.9 Tunnel 6.10 Open Diversion Channel and Cofferdam Engineering 6.11 Navigation Structure 6.12 Slop Engineering 6.13 Canal and Canal Structure 6.14 Sluice and Pumping Station 6.15 Deep and Long Tunnel 6.16 Embankment Protection Engineering 6.17 Irrigation Area Engineering 6.18 River Regulation Engineering 6.19 New Resettlement Site 6.20 Natural Building Material 6.21 Investigation Report 7 Engineering Geological Investigation during Bidding Design Phase 7.1 General Requirements 7.2 Engineering Geological Reexamination and Investigation 7.3 Investigation Report 8 Engineering Geological Investigation during Construction Detail Design Phase 8.1 General Requirements 8.2 Special Engineering Geological Investigation 8.3 Construction Geology 8.4 Investigation Report 9 Engineering Geological Investigation for Danger Release and Strengthening of Dangerously Weak Reservoir 9.1 General Requirements 9.2 Engineering Geological Investigation during Safety Evaluation Phase 9.3 Engineering Geological Investigation during Feasibility Study Phase 9.4 Engineering Geological Investigation during Preliminary Design Phase 9.5 Investigation Report Appendix A Attachment of Engineering Geological Investigation Report Appendix B Applicability of Geophysical Exploration Method Appendix C Karst Leakage Evaluation Appendix D Immersion Evaluation Appendix E Rock-soil Physical and Mechanical Parameter Value Appendix F Permeability Grading of Rock-soil Mass Appendix G Leakage Deformation Evaluation of Soil Appendix H Division of Weathering Zone of Rock Mass Appendix J Division of Relief Zone of Side Slope Rock Mass Appendix K Technical Stipulation of Slope Stability Analysis Appendix L Corrosion Evaluation of Environmental Water Appendix M Sampling of Deep Sand Oval Gravel Layer of River Bed and Technical Stipulation of Field Test Appendix N Engineering Geological Classification of Surrounding rock Appendix P Judgement of Soil Liquefaction Appendix Q Judgment of Rock Blasting Appendix R Key Points of Investigation of Special Soil Appendix S Judgement of Expansive Soil Appendix T Determinaiton of Collapsibility and Inital Collapse Pressure of Loess Appendix U Classification of Rock Mass Structure Appendix V Engineering Geological Classification of Rock Mass of Dam Foundation Appendix W Reduction Coefficient of External Water Pressure Explanation of Wording in this Code Explanation of Provisions
GB 50487-2008 is referred in:
*SL 279-2016 Specification for design of hydraulic tunnel
*SL 265-2016 Design specification for sluice
*GB 50265-2022 Standard for pumping station design
Code of China
Standard
GB 50487-2008  Code for engineering geological invcstigation of water resources and hydropower (English Version)
Standard No.GB 50487-2008
Statusvalid
LanguageEnglish
File FormatPDF
Word Count53000 words
Price(USD)1060.0
Implemented on2009-8-1
Deliveryvia email in 1 business day
Detail of GB 50487-2008
Standard No.
GB 50487-2008
English Name
Code for engineering geological invcstigation of water resources and hydropower
Chinese Name
水利水电工程地质勘察规范
Chinese Classification
P55
Professional Classification
GB
ICS Classification
Issued by
MOHURD
Issued on
2008-12-15
Implemented on
2009-8-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
53000 words
Price(USD)
1060.0
Keywords
GB 50487-2008, GB/T 50487-2008, GBT 50487-2008, GB50487-2008, GB 50487, GB50487, GB/T50487-2008, GB/T 50487, GB/T50487, GBT50487-2008, GBT 50487, GBT50487
Introduction of GB 50487-2008
1 General Provision 1.0.1 This Code is formulated with a view to standardizing engineering geological investigation work of water resources and hydropower, defining investigation work depth and requirements, as well as ensuring investigation work quality. 1.0.2 This Code is applicable to large-scale engineering geological investigation work of water resources and hydropower. 1.0.3 Engineering geological investigation of water resources and hydropower should be classified into such phases as planning, project proposal, feasibility study, preliminary design, bidding design and construction details design. Investigation work at project proposal phase should basically satisfy the depth requirements of feasibility study phase. 1.0.4 Danger release and strengthening engineering investigation for dangerously weak reservoir should be classified into such three phases as safety evaluation, feasibility study and preliminary design. 1.0.5 Engineering geological investigation of water resources and hydropower shall comply with not only this Code but also those stipulated in the current relevant ones of the nation. 2 Terms and Symbols 2.1 Terms 2.1.1 Active fault The fault with activities that has been formed since the Late Pleistocene epoch (100,000 years) 2.1.2 Reservoir leakage The phenomenon that water body leaks from the reservoir through the rock-soil mass in the reservoir basin to outside, thus losing water.
Contents of GB 50487-2008
Contents 1 General Provision 2 Terms and Symbols 2.1 Terms 2.2 Symbols 3 Basic Requirements 4 Engineering Geological Investigation during Planning Phase 4.1 General Requirements 4.2 Regional Geology and Earthquake 4.3 Reservoir 4.4 Dam Site 4.5 Water Diversion Engineering 4.6 Flood Prevention and Drainage Engineering 4.7 Irrigation Area Engineering 4.8 River Regulation Engineering 4.9 Natural Building Material 4.10 Investigation Report 5 Engineering Geological Investigation during Feasibility Study Phase 5.1 General Requirements 5.2 Regional Tectonic Stability 5.3 Reservoir 5.4 Dam Site 5.5 Power Generation and Water Diversion Line and Plant Site 5.6 Spillway 5.7 Canal and Canal Structures 5.8 Sluice and Pumping station 5.9 Deep and Long Tunnel 5.10 Embankment and Flood Diversion and Storage Engineering 5.11 Irrigation Area Engineering 5.12 River Regulation Engineering 5.13 Resettlement Sites 5.14 Natural Building Material 5.15 Investigation Report 6 Engineering Geological Investigation during Preliminary Design Phase 6.1 General Requirements 6.2 Reservoir 6.3 Earth-rock Dam 6.4 Concrete Gravity Dam 6.5 Concrete Arch Dam 6.6 Spillway 6.7 Ground Power House 6.8 Underground Power House 6.9 Tunnel 6.10 Open Diversion Channel and Cofferdam Engineering 6.11 Navigation Structure 6.12 Slop Engineering 6.13 Canal and Canal Structure 6.14 Sluice and Pumping Station 6.15 Deep and Long Tunnel 6.16 Embankment Protection Engineering 6.17 Irrigation Area Engineering 6.18 River Regulation Engineering 6.19 New Resettlement Site 6.20 Natural Building Material 6.21 Investigation Report 7 Engineering Geological Investigation during Bidding Design Phase 7.1 General Requirements 7.2 Engineering Geological Reexamination and Investigation 7.3 Investigation Report 8 Engineering Geological Investigation during Construction Detail Design Phase 8.1 General Requirements 8.2 Special Engineering Geological Investigation 8.3 Construction Geology 8.4 Investigation Report 9 Engineering Geological Investigation for Danger Release and Strengthening of Dangerously Weak Reservoir 9.1 General Requirements 9.2 Engineering Geological Investigation during Safety Evaluation Phase 9.3 Engineering Geological Investigation during Feasibility Study Phase 9.4 Engineering Geological Investigation during Preliminary Design Phase 9.5 Investigation Report Appendix A Attachment of Engineering Geological Investigation Report Appendix B Applicability of Geophysical Exploration Method Appendix C Karst Leakage Evaluation Appendix D Immersion Evaluation Appendix E Rock-soil Physical and Mechanical Parameter Value Appendix F Permeability Grading of Rock-soil Mass Appendix G Leakage Deformation Evaluation of Soil Appendix H Division of Weathering Zone of Rock Mass Appendix J Division of Relief Zone of Side Slope Rock Mass Appendix K Technical Stipulation of Slope Stability Analysis Appendix L Corrosion Evaluation of Environmental Water Appendix M Sampling of Deep Sand Oval Gravel Layer of River Bed and Technical Stipulation of Field Test Appendix N Engineering Geological Classification of Surrounding rock Appendix P Judgement of Soil Liquefaction Appendix Q Judgment of Rock Blasting Appendix R Key Points of Investigation of Special Soil Appendix S Judgement of Expansive Soil Appendix T Determinaiton of Collapsibility and Inital Collapse Pressure of Loess Appendix U Classification of Rock Mass Structure Appendix V Engineering Geological Classification of Rock Mass of Dam Foundation Appendix W Reduction Coefficient of External Water Pressure Explanation of Wording in this Code Explanation of Provisions
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB 50487-2008, GB/T 50487-2008, GBT 50487-2008, GB50487-2008, GB 50487, GB50487, GB/T50487-2008, GB/T 50487, GB/T50487, GBT50487-2008, GBT 50487, GBT50487