2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB/T 28569-2024
GB/T 28569-2024   Electric energy metering for electric vehicle AC charging spot (English Version)
Standard No.: GB/T 28569-2024 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 12500 words Translation Price(USD):375.0 remind me the price change

Email:

Implemented on:2025-4-1 Delivery: via email in 1~3 business day

→ → →

,,2025-4-1,F842DE2D9EA2EA2E1728451185858
Standard No.: GB/T 28569-2024
English Name: Electric energy metering for electric vehicle AC charging spot
Chinese Name: 电动汽车交流充电桩电能计量
Chinese Classification: K81    AC/DC supply units
Professional Classification: GB    National Standard
Source Content Issued by: SAMR, SAC
Issued on: 2024-09-29
Implemented on: 2025-4-1
Status: valid
Superseding:GB/T 28569-2012 Electric energy metering for electric vehicle AC charging spot
Target Language: English
File Format: PDF
Word Count: 12500 words
Translation Price(USD): 375.0
Delivery: via email in 1~3 business day
GB/T 28569-2024 Electric energy metering for electric vehicle AC charging spot 1 Scope This document specifies the technical requirements, test methods and inspection rules for AC electric energy metering between electric vehicle AC charging spot and electric vehicle. This document is applicable to the design, manufacture, acceptance and use of electric energy metering for the whole charger of public AC charger (hereinafter referred to as "charger"), and other types of AC charger shall be implemented in accordance with this document. 2 Normative references The following documents contain requirements which, through reference in this text, constitute provisions of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB/T 2423.1 Environmental testing for electric and electronic products - Part 2: Test methods - Tests A: Cold GB/T 2423.2 Environmental testing for electric and electronic products - Part 2: Test methods - Test B: Dry heat GB/T 2423.4 Environmental testing for electric and electronic products - Part 2: Test method - Test Db: Damp heat, cyclic (12h + 12h cycle) GB/T 18487.1-2023 Electric vehicle conductive charging system - Part 1: General requirements GB/T 18487.2-2017 Electric vehicle conductive charging system - Part 2: EMC requirements for off-board electric vehicle supply equipment GB/T 29317 Terminology of electric vehicle charging/battery swap infrastructure 3 Terms and definitions For the purposes of this document, the terms and definitions given in GB/T 29317 and the following apply. 3.1 public AC charger AC charger installed in public area to realize the transfer of electric energy property rights, with metering and billing functions, and to provide settlement vouchers after the end of charging 3.2 total charging energy total charging energy recorded by charger in the working state since the first charge 3.3 rate amount amount obtained by multiplying the electric energy output of charger in the corresponding period of working state by the rate 3.4 additional amount charges other than the rate amount recorded in the working state of charger Note: Such as parking fees. 3.5 billable amount sum of the rate amount and additional amount recorded in the working state of charger, which is used for settlement with the user 3.6 total billable amount sum of the billable amount recorded from the first charge in the working state of charger 3.7 measuring module electrical meter installed inside a charger for measuring electric energy 4 Technical requirements 4.1 Interface Electric energy metering interface of charger shall meet the following requirements: a) It shall have an interface for transmitting AC electric energy with the electric vehicle charging and energy storage system; b) It should have an electric energy pulse output interface for measuring errors, which can be directly output through the body; c) It shall have a communication interface for transmitting electric energy and electricity charge information;
Contents Foreword 1 Scope 2 Normative references 3 Terms and definitions 4 Technical requirements 4.1 Interface 4.2 Function 4.3 Requirements for charger 4.4 Requirements for measuring module 5 Test methods 5.1 Test reference condition 5.2 Metering interface and nameplate inspection 5.3 Function inspection 5.4 Accuracy test 5.5 Pulse constant test 5.6 Error variation test 5.7 Clock time error test 5.8 Climate and environmental effect test 6 Inspection rules 6.1 Inspection classification 6.2 Inspection items Annex A (Informative) Verification methods A.1 Real load verification method A.2 Virtual load verification method Annex B (Normative) Test items
Referred in GB/T 28569-2024:
*GB/T 2423.1-2008 Environmental testing - Part 2: Test methods - Tests A: Cold
*GB/T 2423.2-2008 Environmental testing - Part 2: Test methods - Tests B: Dry heat
*GB/T 2423.4-2008 Environmental testing for electric and electronic products - Part 2: Test method - Test Db: Damp heat,cyclic ( 12h+12h cycle)
*GB/T 18487.1-2023 Electric vehicle conductive charging system—Part 1: General requirements
*GB/T 18487.2-2017 Electric Vehicle Conductive Charging System Part 2: EMC Requirements for Off-board Electric Vehicle Supply Equipment
*GB/T 29317-2021 Terminology of electric vehicle charging/battery swap infrastructure
GB/T 28569-2024 is referred in:
*QC/T 1199-2023 Integrated AC standard socket-outlet of conductive charging for electric vehicles
Code of China
Standard
GB/T 28569-2024  Electric energy metering for electric vehicle AC charging spot (English Version)
Standard No.GB/T 28569-2024
Statusvalid
LanguageEnglish
File FormatPDF
Word Count12500 words
Price(USD)375.0
Implemented on2025-4-1
Deliveryvia email in 1~3 business day
Detail of GB/T 28569-2024
Standard No.
GB/T 28569-2024
English Name
Electric energy metering for electric vehicle AC charging spot
Chinese Name
电动汽车交流充电桩电能计量
Chinese Classification
K81
Professional Classification
GB
ICS Classification
Issued by
SAMR, SAC
Issued on
2024-09-29
Implemented on
2025-4-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
GB/T 28569-2012 Electric energy metering for electric vehicle AC charging spot
Language
English
File Format
PDF
Word Count
12500 words
Price(USD)
375.0
Keywords
GB/T 28569-2024, GB 28569-2024, GBT 28569-2024, GB/T28569-2024, GB/T 28569, GB/T28569, GB28569-2024, GB 28569, GB28569, GBT28569-2024, GBT 28569, GBT28569
Introduction of GB/T 28569-2024
GB/T 28569-2024 Electric energy metering for electric vehicle AC charging spot 1 Scope This document specifies the technical requirements, test methods and inspection rules for AC electric energy metering between electric vehicle AC charging spot and electric vehicle. This document is applicable to the design, manufacture, acceptance and use of electric energy metering for the whole charger of public AC charger (hereinafter referred to as "charger"), and other types of AC charger shall be implemented in accordance with this document. 2 Normative references The following documents contain requirements which, through reference in this text, constitute provisions of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB/T 2423.1 Environmental testing for electric and electronic products - Part 2: Test methods - Tests A: Cold GB/T 2423.2 Environmental testing for electric and electronic products - Part 2: Test methods - Test B: Dry heat GB/T 2423.4 Environmental testing for electric and electronic products - Part 2: Test method - Test Db: Damp heat, cyclic (12h + 12h cycle) GB/T 18487.1-2023 Electric vehicle conductive charging system - Part 1: General requirements GB/T 18487.2-2017 Electric vehicle conductive charging system - Part 2: EMC requirements for off-board electric vehicle supply equipment GB/T 29317 Terminology of electric vehicle charging/battery swap infrastructure 3 Terms and definitions For the purposes of this document, the terms and definitions given in GB/T 29317 and the following apply. 3.1 public AC charger AC charger installed in public area to realize the transfer of electric energy property rights, with metering and billing functions, and to provide settlement vouchers after the end of charging 3.2 total charging energy total charging energy recorded by charger in the working state since the first charge 3.3 rate amount amount obtained by multiplying the electric energy output of charger in the corresponding period of working state by the rate 3.4 additional amount charges other than the rate amount recorded in the working state of charger Note: Such as parking fees. 3.5 billable amount sum of the rate amount and additional amount recorded in the working state of charger, which is used for settlement with the user 3.6 total billable amount sum of the billable amount recorded from the first charge in the working state of charger 3.7 measuring module electrical meter installed inside a charger for measuring electric energy 4 Technical requirements 4.1 Interface Electric energy metering interface of charger shall meet the following requirements: a) It shall have an interface for transmitting AC electric energy with the electric vehicle charging and energy storage system; b) It should have an electric energy pulse output interface for measuring errors, which can be directly output through the body; c) It shall have a communication interface for transmitting electric energy and electricity charge information;
Contents of GB/T 28569-2024
Contents Foreword 1 Scope 2 Normative references 3 Terms and definitions 4 Technical requirements 4.1 Interface 4.2 Function 4.3 Requirements for charger 4.4 Requirements for measuring module 5 Test methods 5.1 Test reference condition 5.2 Metering interface and nameplate inspection 5.3 Function inspection 5.4 Accuracy test 5.5 Pulse constant test 5.6 Error variation test 5.7 Clock time error test 5.8 Climate and environmental effect test 6 Inspection rules 6.1 Inspection classification 6.2 Inspection items Annex A (Informative) Verification methods A.1 Real load verification method A.2 Virtual load verification method Annex B (Normative) Test items
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB/T 28569-2024, GB 28569-2024, GBT 28569-2024, GB/T28569-2024, GB/T 28569, GB/T28569, GB28569-2024, GB 28569, GB28569, GBT28569-2024, GBT 28569, GBT28569