2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB/T 36023-2018
GB/T 36023-2018   Guides for energy efficiency assessment of prepainting process (English Version)
Standard No.: GB/T 36023-2018 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 5500 words Translation Price(USD):140.0 remind me the price change

Email:

Implemented on:2018-12-1 Delivery: via email in 1 business day

→ → →

,,2018-12-1,8BC494D8B9FECBC51521450993008
Standard No.: GB/T 36023-2018
English Name: Guides for energy efficiency assessment of prepainting process
Chinese Name: 钢带连续彩色涂层工序能效评估导则
Chinese Classification: H04    Basic standards and general methods
Professional Classification: GB    National Standard
Source Content Issued by: AQSIQ; SAC
Issued on: 2018-03-15
Implemented on: 2018-12-1
Status: valid
Target Language: English
File Format: PDF
Word Count: 5500 words
Translation Price(USD): 140.0
Delivery: via email in 1 business day
GB/T 36023-2018 Guides for energy efficiency assessment of prepainting process 1 Scope This standard specifies the terms and definitions, assessment procedures, boundaries and scope of energy consumption statistics, benchmark energy consumption, actual energy consumption, energy efficiency index, energy efficiency analysis and measures for optimizing energy efficiency in connection with the energy efficiency assessment of prepainting process of steel strips. This standard is applicable to energy efficiency assessment and energy-saving potential analysis of the prepainting process in iron and steel enterprises. 2 Normative references The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB 17167 General principle for equipping and managing of the measuring instrument of energy in organization of energy using GB/T 21368 Specification for equipping and managing of measuring instrument of energy in the iron and steel industry GB/T 23331 Energy management systems - Requirements GB/T 28924 Guides for calculating energy efficiency index of an iron and steel enterprise YB/T 4210 Determination and calculation of heat balance of incinerator and solidification furnace for CCL YB/T 4662 Guides for energy efficiency assessment of iron and steel enterprise 3 Terms and definitions For the purposes of this document, the terms and definitions given in GB/T 23331, GB/T 28924 and YB/T 4662 apply. 4 Assessment procedures The requirements of YB/T 4662 shall apply.   5 Boundaries and scope of energy consumption statistics 5.1 Process boundary division The boundary of prepainting process starts from the input of raw materials (raw steel coils and coatings, etc.), energy, and energy-consumed mediums, and ends with the output of the final color-coated steel coil products and the externally supplied energy. Refer to Annex A for the boundary division of the prepainting process. 5.2 Scope of energy consumption statistics The scope of energy consumption statistics for the prepainting process is defined as follows: a) Including dedicated water and gas supply systems separately equipped for the production line, in which case the corresponding energy-consumed medium is selected and input; b) Including all sub-processes of the prepainting process, as well as the feeding process of raw material steel coils and the process of going off-line, packaging and warehousing of steel coil products; c) Including machine maintenance, inspection, laboratory testing, metering, transportation, production management and scheduling systems, as well as auxiliary production systems such as heating or cooling, lighting, and storage; d) Including the loss of various energy sources within the interface of the prepainting process; e) Excluding recycled and externally supplied energy sources; f) Excluding energy used for life purposes, such as canteen, offices, and rest rooms, which are not related to production; and g) Excluding treatment of waste water, waste gas and solid waste. 6 Benchmark of energy consumption
Foreword i 1 Scope 2 Normative references 3 Terms and definitions 4 Assessment procedures 5 Boundaries and scope of energy consumption statistics 6 Benchmark of energy consumption 7 Actual energy consumption 8 Energy efficiency index 9 Energy efficiency analysis 10 Measures for optimizing energy efficiency Annex A (Informative) Boundary division of the prepainting process Annex B (Informative) Recommended values for the coefficient of converting energy sources and energy-consumed mediums into standard coal Bibliography
Referred in GB/T 36023-2018:
*GB 17167-2006 General principle for equipping and managing of the measuring instrument of energy in organization of energy using
*GB/T 21368-2008 Specificatoin for equipping and managing of measuring instrument of energy in the iron and steel industry
*GB/T 23331-2020 Energy management systems—Requirements with guidance for use
*GB/T 28924-2023 Guides for calculating energy efficiency index for iron and steel enterprises
*YB/T 4210-2010 Determination and calculation of heat balance of incinerator & solidification furnace for CCL
*YB/T 4662-2018 Guides for energy efficiency assessment of iron and steel enterprise
Code of China
Standard
GB/T 36023-2018  Guides for energy efficiency assessment of prepainting process (English Version)
Standard No.GB/T 36023-2018
Statusvalid
LanguageEnglish
File FormatPDF
Word Count5500 words
Price(USD)140.0
Implemented on2018-12-1
Deliveryvia email in 1 business day
Detail of GB/T 36023-2018
Standard No.
GB/T 36023-2018
English Name
Guides for energy efficiency assessment of prepainting process
Chinese Name
钢带连续彩色涂层工序能效评估导则
Chinese Classification
H04
Professional Classification
GB
ICS Classification
Issued by
AQSIQ; SAC
Issued on
2018-03-15
Implemented on
2018-12-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
5500 words
Price(USD)
140.0
Keywords
GB/T 36023-2018, GB 36023-2018, GBT 36023-2018, GB/T36023-2018, GB/T 36023, GB/T36023, GB36023-2018, GB 36023, GB36023, GBT36023-2018, GBT 36023, GBT36023
Introduction of GB/T 36023-2018
GB/T 36023-2018 Guides for energy efficiency assessment of prepainting process 1 Scope This standard specifies the terms and definitions, assessment procedures, boundaries and scope of energy consumption statistics, benchmark energy consumption, actual energy consumption, energy efficiency index, energy efficiency analysis and measures for optimizing energy efficiency in connection with the energy efficiency assessment of prepainting process of steel strips. This standard is applicable to energy efficiency assessment and energy-saving potential analysis of the prepainting process in iron and steel enterprises. 2 Normative references The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB 17167 General principle for equipping and managing of the measuring instrument of energy in organization of energy using GB/T 21368 Specification for equipping and managing of measuring instrument of energy in the iron and steel industry GB/T 23331 Energy management systems - Requirements GB/T 28924 Guides for calculating energy efficiency index of an iron and steel enterprise YB/T 4210 Determination and calculation of heat balance of incinerator and solidification furnace for CCL YB/T 4662 Guides for energy efficiency assessment of iron and steel enterprise 3 Terms and definitions For the purposes of this document, the terms and definitions given in GB/T 23331, GB/T 28924 and YB/T 4662 apply. 4 Assessment procedures The requirements of YB/T 4662 shall apply.   5 Boundaries and scope of energy consumption statistics 5.1 Process boundary division The boundary of prepainting process starts from the input of raw materials (raw steel coils and coatings, etc.), energy, and energy-consumed mediums, and ends with the output of the final color-coated steel coil products and the externally supplied energy. Refer to Annex A for the boundary division of the prepainting process. 5.2 Scope of energy consumption statistics The scope of energy consumption statistics for the prepainting process is defined as follows: a) Including dedicated water and gas supply systems separately equipped for the production line, in which case the corresponding energy-consumed medium is selected and input; b) Including all sub-processes of the prepainting process, as well as the feeding process of raw material steel coils and the process of going off-line, packaging and warehousing of steel coil products; c) Including machine maintenance, inspection, laboratory testing, metering, transportation, production management and scheduling systems, as well as auxiliary production systems such as heating or cooling, lighting, and storage; d) Including the loss of various energy sources within the interface of the prepainting process; e) Excluding recycled and externally supplied energy sources; f) Excluding energy used for life purposes, such as canteen, offices, and rest rooms, which are not related to production; and g) Excluding treatment of waste water, waste gas and solid waste. 6 Benchmark of energy consumption
Contents of GB/T 36023-2018
Foreword i 1 Scope 2 Normative references 3 Terms and definitions 4 Assessment procedures 5 Boundaries and scope of energy consumption statistics 6 Benchmark of energy consumption 7 Actual energy consumption 8 Energy efficiency index 9 Energy efficiency analysis 10 Measures for optimizing energy efficiency Annex A (Informative) Boundary division of the prepainting process Annex B (Informative) Recommended values for the coefficient of converting energy sources and energy-consumed mediums into standard coal Bibliography
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB/T 36023-2018, GB 36023-2018, GBT 36023-2018, GB/T36023-2018, GB/T 36023, GB/T36023, GB36023-2018, GB 36023, GB36023, GBT36023-2018, GBT 36023, GBT36023