2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB/T 43797-2024
GB/T 43797-2024   General requirements of operating licenses extension assessment for nuclear power plants (English Version)
Standard No.: GB/T 43797-2024 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 5500 words Translation Price(USD):165.0 remind me the price change

Email:

Implemented on:2024-7-1 Delivery: via email in 1~3 business day

→ → →

,,2024-7-1,B38B27D22061E3881711512006083
Standard No.: GB/T 43797-2024
English Name: General requirements of operating licenses extension assessment for nuclear power plants
Chinese Name: 核电厂运行许可证延续评估通用要求
Chinese Classification: F63    Power reactor
Professional Classification: GB    National Standard
ICS Classification: 27.120.20 27.120.20    Nuclear power plants. Safety 27.120.20
Source Content Issued by: SAMR; SAC
Issued on: 2024-3-15
Implemented on: 2024-7-1
Status: valid
Target Language: English
File Format: PDF
Word Count: 5500 words
Translation Price(USD): 165.0
Delivery: via email in 1~3 business day
General requirements of operating licenses extension assessment for nuclear power plants 1 Scope This document specifies the assessment process, determination of safety demonstration benchmarks, overall assessment for nuclear power plants, time-limited aging analysis, environmental impact assessment, safety improvement and commitment, supplement and modification of the final safety analysis report, preparation of application documents for operating license extension, renewal of safety benchmarks for extended operation and other requirements for the validity period extension of operating licenses for nuclear power plants. This document is applicable to the assessment activities for the validity period extension of operating licenses for nuclear power plants [hereinafter referred to as "the operating license extension (OLE)"], and may serve as a reference for other nuclear facilities. 2 Normative references The following documents contain provisions which, through reference in this text, constitute provisions of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB/T 41717-2022 Terminology of ageing management and life management for nuclear power plants NB/T 20476.1 Operating license extension of nuclear power plant - Part 1: Screening of ageing management review and identification of time-limited aging analysis NB/T 20476.2 Operating license extension of nuclear power plant - Part 2: Mechanical components aging management review NB/T 20476.3 Operating license extension of nuclear power plant - Part 3: Ageing management review for electrical and instrumentation and control components NB/T 20476.4 Operating license extension of nuclear power plant - Part 4: Ageing management review for structures and structural components NB/T 20476.5 Operating license extension of nuclear power plants - Part 5: Environmental impact assessment NB/T 20476.6 Operating license extension of nuclear power plant - Part 6: Time-limited aging analyses of reactor pressure vessel NB/T 20476.7 Operating license extension of nuclear power plant - Part 7: Time-limited aging analyses of steam generator NB/T 20476.8 Operating license extension of nuclear power plant - Part 8: Metal fatigue analyses NB/T 20476.9 Operating license extension of nuclear power plant - Part 9: Time-limited aging analyses for electrical and instrumentation and control components NB/T 20476.10 Operating license extension of nuclear power plants - Part 10: Time-limit ageing analysis for pre-stressed concrete containment NB/T 20476.11 Operating license extension of nuclear power plant - Part 11: Guidelines for final safety analysis report supplement NB/T 20476.12 Operating license extension of nuclear power plant - Part 12: Guideline for the preparation of applications Technical policy on the extension of the validity period of the "Operating licenses for nuclear power plants" (Trial) [GUOHEANFA (2015) No. 280] 3 Terms and definitions For the purposes of this document, the terms and definitions given in GB/T 41717-2022 and the following apply. 3.1 ageing management review review of the resource allocation, scoping, object screening, ageing mechanism analysis and ageing effect identification, monitoring and detection, assessment and mitigation, etc. of ageing management 3.2 time-limited ageing analysis for the set operating period of units, analysis and calculation of whether the time-related ageing of the structures, systems and components, which are determined according to the established screening principles, will affect their ability to perform preset functions at the end of the assessment period 4 Abbreviations For the purposes of this document, the following abbreviation applies. FSAR: Final Safety Analysis Report OLE: Operating License Extension SSCs: Structures, Systems and Components
Contents Foreword i 1 Scope 2 Normative references 3 Terms and definitions 4 Abbreviations 5 Basic requirements 6 Assessment procedure 7 Determination of safety demonstration benchmarks 8 Overall assessment for nuclear power plants 9 Time-limited ageing analysis 10 Environmental impact assessment 11 Safety improvement and commitment 12 Supplement and modification of the final safety analysis report 13 Preparation of application documents for operating license extension 14 Renewal of safety benchmarks for extended operation
Referred in GB/T 43797-2024:
*GB/T 41717-2022 Terminology of ageing management and life management for nuclear power plants
*NBT20476.1-
*NBT20476.2-
*NBT20476.3-
*NBT20476.4-
*NB/T 20476.5-2018 Operating license extension of nuclear power plants—Part 5: environmental impact assessment
*NB/T 20476.6-2019 Operating license extension of nuclear power plant — Part 6: Time-limited aging analyses of reactor pressure vessel
*NB/T 20476.7-2019 Operating license extension of nuclear power plant —Part 7: Time-limited aging analyses of steam generator
*NB/T 20476.8-2019 Operating license extension of nuclear power plant — Part 8: Metal fatigue analyses
*NB/T 20476.9-2019 Operating license extension of nuclear power plant — Part 9: time-limited aging analyses for electrical and instrumentation and control componets
*NB/T 20476.10-2019 Operating license extension of nuclear power plants—Part 10: Time-limited ageing analysis for pre-stressed concrete containment
*NB/T 20476.11-2019 Operating license extension of nuclear power plant — Part 11: Guideline for final safety analysis report supplement
*NB/T 20476.12-2019 Operating license extension of nuclear power plant —Part 12: Guideline for the preparation of applications
*Technicalpolicy-
Code of China
Standard
GB/T 43797-2024  General requirements of operating licenses extension assessment for nuclear power plants (English Version)
Standard No.GB/T 43797-2024
Statusvalid
LanguageEnglish
File FormatPDF
Word Count5500 words
Price(USD)165.0
Implemented on2024-7-1
Deliveryvia email in 1~3 business day
Detail of GB/T 43797-2024
Standard No.
GB/T 43797-2024
English Name
General requirements of operating licenses extension assessment for nuclear power plants
Chinese Name
核电厂运行许可证延续评估通用要求
Chinese Classification
F63
Professional Classification
GB
ICS Classification
Issued by
SAMR; SAC
Issued on
2024-3-15
Implemented on
2024-7-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
5500 words
Price(USD)
165.0
Keywords
GB/T 43797-2024, GB 43797-2024, GBT 43797-2024, GB/T43797-2024, GB/T 43797, GB/T43797, GB43797-2024, GB 43797, GB43797, GBT43797-2024, GBT 43797, GBT43797
Introduction of GB/T 43797-2024
General requirements of operating licenses extension assessment for nuclear power plants 1 Scope This document specifies the assessment process, determination of safety demonstration benchmarks, overall assessment for nuclear power plants, time-limited aging analysis, environmental impact assessment, safety improvement and commitment, supplement and modification of the final safety analysis report, preparation of application documents for operating license extension, renewal of safety benchmarks for extended operation and other requirements for the validity period extension of operating licenses for nuclear power plants. This document is applicable to the assessment activities for the validity period extension of operating licenses for nuclear power plants [hereinafter referred to as "the operating license extension (OLE)"], and may serve as a reference for other nuclear facilities. 2 Normative references The following documents contain provisions which, through reference in this text, constitute provisions of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB/T 41717-2022 Terminology of ageing management and life management for nuclear power plants NB/T 20476.1 Operating license extension of nuclear power plant - Part 1: Screening of ageing management review and identification of time-limited aging analysis NB/T 20476.2 Operating license extension of nuclear power plant - Part 2: Mechanical components aging management review NB/T 20476.3 Operating license extension of nuclear power plant - Part 3: Ageing management review for electrical and instrumentation and control components NB/T 20476.4 Operating license extension of nuclear power plant - Part 4: Ageing management review for structures and structural components NB/T 20476.5 Operating license extension of nuclear power plants - Part 5: Environmental impact assessment NB/T 20476.6 Operating license extension of nuclear power plant - Part 6: Time-limited aging analyses of reactor pressure vessel NB/T 20476.7 Operating license extension of nuclear power plant - Part 7: Time-limited aging analyses of steam generator NB/T 20476.8 Operating license extension of nuclear power plant - Part 8: Metal fatigue analyses NB/T 20476.9 Operating license extension of nuclear power plant - Part 9: Time-limited aging analyses for electrical and instrumentation and control components NB/T 20476.10 Operating license extension of nuclear power plants - Part 10: Time-limit ageing analysis for pre-stressed concrete containment NB/T 20476.11 Operating license extension of nuclear power plant - Part 11: Guidelines for final safety analysis report supplement NB/T 20476.12 Operating license extension of nuclear power plant - Part 12: Guideline for the preparation of applications Technical policy on the extension of the validity period of the "Operating licenses for nuclear power plants" (Trial) [GUOHEANFA (2015) No. 280] 3 Terms and definitions For the purposes of this document, the terms and definitions given in GB/T 41717-2022 and the following apply. 3.1 ageing management review review of the resource allocation, scoping, object screening, ageing mechanism analysis and ageing effect identification, monitoring and detection, assessment and mitigation, etc. of ageing management 3.2 time-limited ageing analysis for the set operating period of units, analysis and calculation of whether the time-related ageing of the structures, systems and components, which are determined according to the established screening principles, will affect their ability to perform preset functions at the end of the assessment period 4 Abbreviations For the purposes of this document, the following abbreviation applies. FSAR: Final Safety Analysis Report OLE: Operating License Extension SSCs: Structures, Systems and Components
Contents of GB/T 43797-2024
Contents Foreword i 1 Scope 2 Normative references 3 Terms and definitions 4 Abbreviations 5 Basic requirements 6 Assessment procedure 7 Determination of safety demonstration benchmarks 8 Overall assessment for nuclear power plants 9 Time-limited ageing analysis 10 Environmental impact assessment 11 Safety improvement and commitment 12 Supplement and modification of the final safety analysis report 13 Preparation of application documents for operating license extension 14 Renewal of safety benchmarks for extended operation
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB/T 43797-2024, GB 43797-2024, GBT 43797-2024, GB/T43797-2024, GB/T 43797, GB/T43797, GB43797-2024, GB 43797, GB43797, GBT43797-2024, GBT 43797, GBT43797