2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB/T 50294-2014
GB/T 50294-2014   esign code for general plan and transportation of nuclear power plants (English Version)
Standard No.: GB/T 50294-2014 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 25000 words Translation Price(USD):500.0 remind me the price change

Email:

Implemented on:2015-8-1 Delivery: via email in 1 business day

→ → →

,,2015-8-1,E95F2A8A45C0FEAC1438767146219
Standard No.: GB/T 50294-2014
English Name: esign code for general plan and transportation of nuclear power plants
Chinese Name: 核电厂总平面及运输设计规范
Professional Classification: GB    National Standard
Source Content Issued by: MOHURD
Issued on: 2014-12-02
Implemented on: 2015-8-1
Status: valid
Superseding:GB/T 50294-1999 Design code for general plan and transportation of nuclear power plants
Target Language: English
File Format: PDF
Word Count: 25000 words
Translation Price(USD): 500.0
Delivery: via email in 1 business day
1 General Provisions 1.0.1 To implement the national principle on civil nuclear facility of safety first and the national policy of capital construction, follow the national legislations on the construction of nuclear power plant, unify the design principles and technical requirements for general layout and transportation of nuclear power plant, realize safety and reliability, technical advancement and arrangement rationality, this code is prepared. 1.0.2 This code is applicable to the general layout and transportation design for construction and extension of nuclear power plant. 1.0.3 The general layout and transportation design of nuclear power plant shall implement the principles of land saving and intensivism and shall be carried out in manners of adaptation to local conditions, compact arrangement, rational zoning and improved land use efficiency. 1.0.4 The general layout design of nuclear power plant shall adopt multi-scenario techno-economics comparison and the design scenario shall be determined by selecting the optimal. 1.0.5 The general layout design of extension project shall fully consider, and unify and coordinate the original general layout, production system and operation management. 1.0.6 The general layout and transportation design of nuclear power plant shall comply with not only this code but also the current relevant standards of the state. 2 Terms 2.0.1 Siting The process selecting the appropriate plant site area for nuclear power plant, including the evaluation on the relevant design basis. 2.0.2 External human factors Facilities that are manually induced outside nuclear power plant for handling, processing and transporting hazardous articles such as flammable, explosive, corrosive, toxic and radioactive substances, which may damage the nuclear power plant in case of accident 2.0.3 External human induced events Events cause by external human factors 2.0.4 Emergency planning zone The area which is established around the nuclear power plant, with emergency plan prepared and emergency preparations ready so that actions for protecting the public can be effectively taken without delay in case of nuclear power plant accident. 2.0.5 Plume emergency planning zone The emergency planning zone established with respect to the plume exposure pathways (external exposure by immersion, internal exposure by inhalation, external exposure by ground deposition). 2.0.6 Planning restricted area The area immediately adjoining exclusion area, approved by provincial people's government. Mechanical population growth in planning restricted area must be restricted. The construction and extension projects in such area shall be directed or restricted so as to allow appropriate protective measures to be taken in case of accident and emergency. 2.0.7 Exclusion area The area within some range around reactor, from which inhabitants are strictly excluded; it is under the effective control of the operating party of nuclear power plant, including evacuation of personal and property from this area; highways, railways and waterways are allowed to cross this area provided that they introduce no interference to the normal operation of nuclear power plant; in case of accident, appropriate and effective arrangement may be made and traffic be controlled so as to ensure the safety of workers and inhabitants. In exclusion area, activities unrelated to nuclear power plant are allowed provided having no impact on the normal operation of nuclear power plant and on inhabitants' health and safety. 2.0.8 Physical protection Protection implemented for the important equipment and materials of nuclear power plant so as to reduce or minimize the risks of damage to important equipment and lost nuclear material in any case. 2.0.9 Design basis
Foreword i 1 General Provisions 2 Terms 3 Plant Site Selection 3.1 General Provisions 3.2 Nuclear Safety Criterion 4 General Plan 4.1 General Provisions 4.2 Protection Distance 4.3 Traffic and Transportation 4.4 Working Area 5 General Layout 5.1 General Provisions 5.2 Main Production Facilities Layout 5.3 Auxiliary Facilities Layout 5.4 Administration Buildings Area Layout 5.5 Outside Construction Layout 5.6 Physical Protect System and Entrance Layout 6 Vertical Design 6.1 General Provisions 6.2 Determination of Design Elevation 6.3 Step Type Design 6.4 Earth (Stone) Work 6.5 Water Drainage of Site 7 Integrated Arrangement of Pipeline 7.1 General Provisions 7.2 Underground Pipeline 7.3 Overhead Pipeline 8 Transportation 8.1 General Provisions 8.2 Transfer Station (Transshipment Wharf) 8.3 Railway 8.4 Road 8.5 Water Transport 9 Vegetation Arrangement 9.1 General Provisions 9.2 Vegetation Arrangement 9.3 Tree Species Selection 10 Main Techno-Economics Index Appendix A Excavation, Filling Slope Allowable Value Appendix B Loosening Coefficient of Soil Appendix C Regulation on Calculation of Main Techno-Economics Index Explanation of Wording in the Code List of Quoted Standards
GB/T 50294-2014 is referred in:
*GB/T 22158-2021 Code for fire protection design of nuclear power plant
Code of China
Standard
GB/T 50294-2014  esign code for general plan and transportation of nuclear power plants (English Version)
Standard No.GB/T 50294-2014
Statusvalid
LanguageEnglish
File FormatPDF
Word Count25000 words
Price(USD)500.0
Implemented on2015-8-1
Deliveryvia email in 1 business day
Detail of GB/T 50294-2014
Standard No.
GB/T 50294-2014
English Name
esign code for general plan and transportation of nuclear power plants
Chinese Name
核电厂总平面及运输设计规范
Chinese Classification
Professional Classification
GB
ICS Classification
Issued by
MOHURD
Issued on
2014-12-02
Implemented on
2015-8-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
GB/T 50294-1999 Design code for general plan and transportation of nuclear power plants
Language
English
File Format
PDF
Word Count
25000 words
Price(USD)
500.0
Keywords
GB/T 50294-2014, GB 50294-2014, GBT 50294-2014, GB/T50294-2014, GB/T 50294, GB/T50294, GB50294-2014, GB 50294, GB50294, GBT50294-2014, GBT 50294, GBT50294
Introduction of GB/T 50294-2014
1 General Provisions 1.0.1 To implement the national principle on civil nuclear facility of safety first and the national policy of capital construction, follow the national legislations on the construction of nuclear power plant, unify the design principles and technical requirements for general layout and transportation of nuclear power plant, realize safety and reliability, technical advancement and arrangement rationality, this code is prepared. 1.0.2 This code is applicable to the general layout and transportation design for construction and extension of nuclear power plant. 1.0.3 The general layout and transportation design of nuclear power plant shall implement the principles of land saving and intensivism and shall be carried out in manners of adaptation to local conditions, compact arrangement, rational zoning and improved land use efficiency. 1.0.4 The general layout design of nuclear power plant shall adopt multi-scenario techno-economics comparison and the design scenario shall be determined by selecting the optimal. 1.0.5 The general layout design of extension project shall fully consider, and unify and coordinate the original general layout, production system and operation management. 1.0.6 The general layout and transportation design of nuclear power plant shall comply with not only this code but also the current relevant standards of the state. 2 Terms 2.0.1 Siting The process selecting the appropriate plant site area for nuclear power plant, including the evaluation on the relevant design basis. 2.0.2 External human factors Facilities that are manually induced outside nuclear power plant for handling, processing and transporting hazardous articles such as flammable, explosive, corrosive, toxic and radioactive substances, which may damage the nuclear power plant in case of accident 2.0.3 External human induced events Events cause by external human factors 2.0.4 Emergency planning zone The area which is established around the nuclear power plant, with emergency plan prepared and emergency preparations ready so that actions for protecting the public can be effectively taken without delay in case of nuclear power plant accident. 2.0.5 Plume emergency planning zone The emergency planning zone established with respect to the plume exposure pathways (external exposure by immersion, internal exposure by inhalation, external exposure by ground deposition). 2.0.6 Planning restricted area The area immediately adjoining exclusion area, approved by provincial people's government. Mechanical population growth in planning restricted area must be restricted. The construction and extension projects in such area shall be directed or restricted so as to allow appropriate protective measures to be taken in case of accident and emergency. 2.0.7 Exclusion area The area within some range around reactor, from which inhabitants are strictly excluded; it is under the effective control of the operating party of nuclear power plant, including evacuation of personal and property from this area; highways, railways and waterways are allowed to cross this area provided that they introduce no interference to the normal operation of nuclear power plant; in case of accident, appropriate and effective arrangement may be made and traffic be controlled so as to ensure the safety of workers and inhabitants. In exclusion area, activities unrelated to nuclear power plant are allowed provided having no impact on the normal operation of nuclear power plant and on inhabitants' health and safety. 2.0.8 Physical protection Protection implemented for the important equipment and materials of nuclear power plant so as to reduce or minimize the risks of damage to important equipment and lost nuclear material in any case. 2.0.9 Design basis
Contents of GB/T 50294-2014
Foreword i 1 General Provisions 2 Terms 3 Plant Site Selection 3.1 General Provisions 3.2 Nuclear Safety Criterion 4 General Plan 4.1 General Provisions 4.2 Protection Distance 4.3 Traffic and Transportation 4.4 Working Area 5 General Layout 5.1 General Provisions 5.2 Main Production Facilities Layout 5.3 Auxiliary Facilities Layout 5.4 Administration Buildings Area Layout 5.5 Outside Construction Layout 5.6 Physical Protect System and Entrance Layout 6 Vertical Design 6.1 General Provisions 6.2 Determination of Design Elevation 6.3 Step Type Design 6.4 Earth (Stone) Work 6.5 Water Drainage of Site 7 Integrated Arrangement of Pipeline 7.1 General Provisions 7.2 Underground Pipeline 7.3 Overhead Pipeline 8 Transportation 8.1 General Provisions 8.2 Transfer Station (Transshipment Wharf) 8.3 Railway 8.4 Road 8.5 Water Transport 9 Vegetation Arrangement 9.1 General Provisions 9.2 Vegetation Arrangement 9.3 Tree Species Selection 10 Main Techno-Economics Index Appendix A Excavation, Filling Slope Allowable Value Appendix B Loosening Coefficient of Soil Appendix C Regulation on Calculation of Main Techno-Economics Index Explanation of Wording in the Code List of Quoted Standards
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB/T 50294-2014, GB 50294-2014, GBT 50294-2014, GB/T50294-2014, GB/T 50294, GB/T50294, GB50294-2014, GB 50294, GB50294, GBT50294-2014, GBT 50294, GBT50294