2025-12-14 216.73.216.3
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB/T 50349-2005
GB/T 50349-2005   Engineering technical code of water supply polypropylene pipeline for buildings (English Version)
Standard No.: GB/T 50349-2005 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 19000 words Translation Price(USD):380.0 remind me the price change

Email:

Implemented on:2005-4-1 Delivery: via email in 1 business day

→ → →

2015-05-01,2015-5-1,2005-4-1,141138181811214A0FB3756A10B86
Standard No.: GB/T 50349-2005
English Name: Engineering technical code of water supply polypropylene pipeline for buildings
Chinese Name: 建筑给水聚丙烯管道工程技术规范
Chinese Classification: P42    Building water supply and draining engineering
Professional Classification: GB    National Standard
ICS Classification: 91.140.60 91.140.60    Water supply systems 91.140.60
Source Content Issued by: MOC; AQSIQ
Issued on: 2005-2-23
Implemented on: 2005-4-1
Status: superseded
Superseded by:CJJ/T 98-2014 Technical specification of plastic pipeline engineering for water supply in building
Superseded on:2015-5-1
Abolished on:2015-05-01
Target Language: English
File Format: PDF
Word Count: 19000 words
Translation Price(USD): 380.0
Delivery: via email in 1 business day
1.0.1 This code is formulated with a view to making technical advancement, economic feasibility and safety & health, and guaranteeing quality in the design, construction and acceptance of water supply polypropylene pipeline engineering for building. 1.0.2 This code is be applicable to the design, construction and acceptance of domestic water, hot water and drinking water clean piping systems for new, extended and rebuilt industrial and civil buildings. Water supply polypropylene pipelines for buildings shall not be connected with fire water supply pipeline in buildings. The design pressure of random copolymerization polypropylene (PP-R) pipeline system should not be larger than 1.0 MPa, and the design temperature shall not be lower than 0℃ and not be higher than 70 ℃; the impact resistance copolymerization polypropylene (PP-B) pipeline system should not be larger than 1.0MPa and the design temperature shall not be lower than 0℃ and not be higher than 40℃. 1.0.3 Polypropylene pipes and pipe fittings applied in this code shall meet the requirements of the national standard "Polypropylene piping systems for hot and cold water installation" GB/T 18742. 1.0.4 The design, construction and acceptance of water supply polypropylene pipeline engineering for building shall meet the requirements of the relevant current standards and codes of the country and the industry, besides this code.
Contents 1 General Principles 2 Terms and Symbols 2.1 Terms 2.2 Symbols 3 Materials 3.1 General Requirements 3.2 Water Quality Requirement 4 Design 4.1 General Requirements 4.2 Pipeline Layout and Laying 4.3 Deformation computation and compensation measures of pipes 4.4 Hydraulic Calculation of Pipeline 4.5 Frost prevention, heat shielding, thermal insulation and dew proofing 5 Construction and installation 5.1 General Requirements 5.2 Storage and transport 5.3 Pipeline Laying 5.4 Pipe connection 5.5 Installation of Supporter and Hanger 5.6 Pressure Test 5.7 Cleaning and Disinfecting 5.8 Safe Construction 6 Inspection and Acceptance 6.1 General Requirements 6.2 Pressure Test 6.3 Acceptance Appendix A Allowable Maximum Pressure 0f Pipe Materials at Different Temperatures Appendix B Hydraulic Calculation Tables Explanation of Wording in This Code
Code of China
Standard
GB/T 50349-2005  Engineering technical code of water supply polypropylene pipeline for buildings (English Version)
Standard No.GB/T 50349-2005
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count19000 words
Price(USD)380.0
Implemented on2005-4-1
Deliveryvia email in 1 business day
Detail of GB/T 50349-2005
Standard No.
GB/T 50349-2005
English Name
Engineering technical code of water supply polypropylene pipeline for buildings
Chinese Name
建筑给水聚丙烯管道工程技术规范
Chinese Classification
P42
Professional Classification
GB
ICS Classification
Issued by
MOC; AQSIQ
Issued on
2005-2-23
Implemented on
2005-4-1
Status
superseded
Superseded by
CJJ/T 98-2014 Technical specification of plastic pipeline engineering for water supply in building
Superseded on
2015-5-1
Abolished on
2015-05-01
Superseding
Language
English
File Format
PDF
Word Count
19000 words
Price(USD)
380.0
Keywords
GB/T 50349-2005, GB 50349-2005, GBT 50349-2005, GB/T50349-2005, GB/T 50349, GB/T50349, GB50349-2005, GB 50349, GB50349, GBT50349-2005, GBT 50349, GBT50349
Introduction of GB/T 50349-2005
1.0.1 This code is formulated with a view to making technical advancement, economic feasibility and safety & health, and guaranteeing quality in the design, construction and acceptance of water supply polypropylene pipeline engineering for building. 1.0.2 This code is be applicable to the design, construction and acceptance of domestic water, hot water and drinking water clean piping systems for new, extended and rebuilt industrial and civil buildings. Water supply polypropylene pipelines for buildings shall not be connected with fire water supply pipeline in buildings. The design pressure of random copolymerization polypropylene (PP-R) pipeline system should not be larger than 1.0 MPa, and the design temperature shall not be lower than 0℃ and not be higher than 70 ℃; the impact resistance copolymerization polypropylene (PP-B) pipeline system should not be larger than 1.0MPa and the design temperature shall not be lower than 0℃ and not be higher than 40℃. 1.0.3 Polypropylene pipes and pipe fittings applied in this code shall meet the requirements of the national standard "Polypropylene piping systems for hot and cold water installation" GB/T 18742. 1.0.4 The design, construction and acceptance of water supply polypropylene pipeline engineering for building shall meet the requirements of the relevant current standards and codes of the country and the industry, besides this code.
Contents of GB/T 50349-2005
Contents 1 General Principles 2 Terms and Symbols 2.1 Terms 2.2 Symbols 3 Materials 3.1 General Requirements 3.2 Water Quality Requirement 4 Design 4.1 General Requirements 4.2 Pipeline Layout and Laying 4.3 Deformation computation and compensation measures of pipes 4.4 Hydraulic Calculation of Pipeline 4.5 Frost prevention, heat shielding, thermal insulation and dew proofing 5 Construction and installation 5.1 General Requirements 5.2 Storage and transport 5.3 Pipeline Laying 5.4 Pipe connection 5.5 Installation of Supporter and Hanger 5.6 Pressure Test 5.7 Cleaning and Disinfecting 5.8 Safe Construction 6 Inspection and Acceptance 6.1 General Requirements 6.2 Pressure Test 6.3 Acceptance Appendix A Allowable Maximum Pressure 0f Pipe Materials at Different Temperatures Appendix B Hydraulic Calculation Tables Explanation of Wording in This Code
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB/T 50349-2005, GB 50349-2005, GBT 50349-2005, GB/T50349-2005, GB/T 50349, GB/T50349, GB50349-2005, GB 50349, GB50349, GBT50349-2005, GBT 50349, GBT50349