2025-12-14 216.73.216.3
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/JTJ 285-2000
JTJ 285-2000   Design and Construction Code of Rock-socketed Piles for Harbour Engineering (English Version)
Standard No.: JTJ 285-2000 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 16000 words Translation Price(USD):320.0 remind me the price change

Email:

Implemented on:2001-5-1 Delivery: via email in 1 business day

→ → →

,2018-6-1,2001-5-1,141137365587559DA8EBB5C7D4B0B
Standard No.: JTJ 285-2000
English Name: Design and Construction Code of Rock-socketed Piles for Harbour Engineering
Chinese Name: 港口工程嵌岩桩设计与施工规程
Chinese Classification: P67    Port and waterway engineering
Professional Classification: JT    Professional Standard - Transport
Source Content Issued by: Ministry of Transport
Issued on: 2000-12-08
Implemented on: 2001-5-1
Status: superseded
Superseded by:JTS 215-2018 Construction Code for Wharf Structures
JTS 167-2018 Design Code for Wharf Structures
Superseded on:2018-6-1
Target Language: English
File Format: PDF
Word Count: 16000 words
Translation Price(USD): 320.0
Delivery: via email in 1 business day
1 General Provisions 1.0.1 This code is formulated with a view to enabling design and construction of rock-socketed piles for harbour engineering to achieve advanced technology, economy and rationality, safety and usability, and guaranteeing the engineering quality. 1.0.2 This code is applicable to design, construction, quality control and load test of rock-socketed piles for harbour engineering. Rock-socketed piles for other similar engineering may refer to it. 1.0.3 Load acted on plies and its effect combination shall comply with the relevant requirements of the current professional standards "Load Code for Harbour Engineering" (JTJ 215), "Code for Pile Foundation of Harbour Engineering" (JTJ 254) and "Design and Construction Code for Open Type Wharf on Piles" (JTJ 291), etc. 1.0.4 The design and construction of rock-socketed piles for harbour engineering shall not only comply with this code, but also those in the current relevant ones of the nation. 2 Terms and Symbols 2.1 Terms 2.1.1 Cast-in-place rock-socketed piles Piles that are formed through pouring and the pile tip is embedded into bed rock to anchor. 2.1.2 Cast-in-place anchor-bolt rock-socketed piles Piles that are embedded into rock mass via anchor bolt to enable cast-in-situ pile and bed rock to anchor. 2.1.3 Precast imbedded rock-socketed piles Piles that the precast pile tip is embedded into bed rock to anchor. 2.1.4 Precast core-column rock-socketed piles Piles that precast pile and bed rock are anchored through concrete pouring by drilling bed rock in precast pile core. 2.1.5 Precast anchor-bolt rock-socketed piles Piles that are embedded into rock mass via anchor bolt to enable precast pile and bed rock to anchor. 2.1.6 Combined rock-socketed piles Piles that are formed through the combination of precast core-column rock-socketed mode or cast-in-place rock-socketed mode and anchor-bolt rock-socketed mode. 2.2 Main Symbols A——Sectional area of pile body or area of pile tip AS——Sectional area of anchor bolt steel bar D——Diameter of pile body or anchor hole G——Pile gravity Le——Effective anchorage length of anchor bolt Lj——Thickness of pile body passing through the ith layer of soil Md——Design value of bending moment of pile body at bed rock top surface Pd——Design value of anchor bolt pull-out force Pk——Standard value of ultimate pull-out force of anchor bolt Qcd——Design value of axial compression bearing capacity of single pile Qck——Standard value of axial ultimate compression capacity of single pile Qtd——Design value of axial pull-out bearing capacity of single pile Qtk——Standard value of axial pull-out ultimate bearing capacity of single pile Vd——Design value of shear force of pile body at bed rock top surface d——Internal diameter of pile, diameter of rock-socketed segment or diameter of anchor bolt steel bar fck——Standard value of axial compressive strength of concrete frc——Standard value of uniaxial compressive strength of saturated rock fy——Design value of tensile strength of anchor bolt steel bar fyk——Standard value of yield strength of anchor bolt steel bar hr——Rock-socketed depth qfi——Sandard value of ultimate lateral resistance of the ith layer of soil for single pile qfk——Standard value of bond strength γ——Partial coefficient μ——Circumference of pile body ε——Calculation coefficient of resistance 3 General Requirements 3.0.1 Design and construction of rock-socketed piles shall be provided with the following data: (1) Service requirements; (2) Hydrology, weather, topography, environment and water depth data; (3) Geological conditions and engineering geological evaluation; (4) Necessary load test and standing stability test condition; (5) Investigation condition of obstructions affecting construction; (6) Performance of main construction equipment, etc. 3.0.2 The type of rock-socketed piles shall be determined through technical and economic proof according to service requirements and geological conditions such as buried depth of bed rock. Rock-socketed piles may adopt cast-in-place rock-socketed piles, cast-in-place anchor-bolt rock-socketed piles, precast imbedded rock-socketed piles, precast core-column rock-socketed piles, precast anchor-bolt rock-socketed piles or combined rock-socketed piles. Rock-socketed piles may be vertical piles or batter piles. 3.0.3 Bearing capacity of rock-socketed piles shall be calculated respectively according to pile body structure strength and supporting capacity of foundation to pile based on different load carrying conditions.
1 General Provisions 2 Terms and Symbols 2.1 Terms 2.2 Main Symbols 3 General Requirements 4 Bearing Capacity 4.1 General Requirements 4.2 Axial Bearing Capacity of Piles 4.3 Calculation of Piles under the Action of Horizontal Force 5 Structure Design 5.1 General Requirements 5.2 Structural Calculation of Pile Body 5.3 Structure of Cast-in-place Rock-socketed Piles 5.4 Structural Selection and Structure of Precast Rock-socketed Piles 6 Construction 6.1 Construction Preparation 6.2 General Requirements 6.3 Pile Sinking and Stabilization Process 6.4 Overwater Construction Platform 6.5 Hole Forming 6.6 Underwater Concrete Grouting 6.7 Construction of Cast-in-place Rock-socketed Piles 6.8 Construction of Precast Imbedded Rock-socketed Piles 6.9 Construction of Precast Core-column Rock-socketed Piles 6.10 Construction of Precast Anchor-bolt Rock-socketed Piles 6.11 Construction of Combined Rock-socketed Piles 7 Construction Quality Control 7.1 Permissible Deviation of Pile Position 7.2 Quality Control during Construction Process 8 Load Test 8.1 Axial Static Load Test of Single Pile 8.2 Horizontal Static Load Test of Single Pile 8.3 Pull-out Static Load Test of Anchor Bolt of Anchor-bolt Rock-socketed Piles Appendix A Engineering Properties of Bed Rock Appendix B Rock-socketed Type and Construction Diagram of Rock-socketed Piles Appendix C Reference Table of Properties of Various Rock-socketed Pile Drills Appendix D Reference Table of Main Technical Indexes of Steel Bar Extruder Appendix E Pile Stabilization Calculation and Placing Process of Reinforced Concrete Casing Box Appendix F Explanation of Wording in This Code Additional Explanation
Code of China
Standard
JTJ 285-2000  Design and Construction Code of Rock-socketed Piles for Harbour Engineering (English Version)
Standard No.JTJ 285-2000
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count16000 words
Price(USD)320.0
Implemented on2001-5-1
Deliveryvia email in 1 business day
Detail of JTJ 285-2000
Standard No.
JTJ 285-2000
English Name
Design and Construction Code of Rock-socketed Piles for Harbour Engineering
Chinese Name
港口工程嵌岩桩设计与施工规程
Chinese Classification
P67
Professional Classification
JT
ICS Classification
Issued by
Ministry of Transport
Issued on
2000-12-08
Implemented on
2001-5-1
Status
superseded
Superseded by
JTS 215-2018 Construction Code for Wharf Structures
JTS 167-2018 Design Code for Wharf Structures
Superseded on
2018-6-1
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
16000 words
Price(USD)
320.0
Keywords
JTJ 285-2000, JTJ/T 285-2000, JTJT 285-2000, JTJ285-2000, JTJ 285, JTJ285, JTJ/T285-2000, JTJ/T 285, JTJ/T285, JTJT285-2000, JTJT 285, JTJT285
Introduction of JTJ 285-2000
1 General Provisions 1.0.1 This code is formulated with a view to enabling design and construction of rock-socketed piles for harbour engineering to achieve advanced technology, economy and rationality, safety and usability, and guaranteeing the engineering quality. 1.0.2 This code is applicable to design, construction, quality control and load test of rock-socketed piles for harbour engineering. Rock-socketed piles for other similar engineering may refer to it. 1.0.3 Load acted on plies and its effect combination shall comply with the relevant requirements of the current professional standards "Load Code for Harbour Engineering" (JTJ 215), "Code for Pile Foundation of Harbour Engineering" (JTJ 254) and "Design and Construction Code for Open Type Wharf on Piles" (JTJ 291), etc. 1.0.4 The design and construction of rock-socketed piles for harbour engineering shall not only comply with this code, but also those in the current relevant ones of the nation. 2 Terms and Symbols 2.1 Terms 2.1.1 Cast-in-place rock-socketed piles Piles that are formed through pouring and the pile tip is embedded into bed rock to anchor. 2.1.2 Cast-in-place anchor-bolt rock-socketed piles Piles that are embedded into rock mass via anchor bolt to enable cast-in-situ pile and bed rock to anchor. 2.1.3 Precast imbedded rock-socketed piles Piles that the precast pile tip is embedded into bed rock to anchor. 2.1.4 Precast core-column rock-socketed piles Piles that precast pile and bed rock are anchored through concrete pouring by drilling bed rock in precast pile core. 2.1.5 Precast anchor-bolt rock-socketed piles Piles that are embedded into rock mass via anchor bolt to enable precast pile and bed rock to anchor. 2.1.6 Combined rock-socketed piles Piles that are formed through the combination of precast core-column rock-socketed mode or cast-in-place rock-socketed mode and anchor-bolt rock-socketed mode. 2.2 Main Symbols A——Sectional area of pile body or area of pile tip AS——Sectional area of anchor bolt steel bar D——Diameter of pile body or anchor hole G——Pile gravity Le——Effective anchorage length of anchor bolt Lj——Thickness of pile body passing through the ith layer of soil Md——Design value of bending moment of pile body at bed rock top surface Pd——Design value of anchor bolt pull-out force Pk——Standard value of ultimate pull-out force of anchor bolt Qcd——Design value of axial compression bearing capacity of single pile Qck——Standard value of axial ultimate compression capacity of single pile Qtd——Design value of axial pull-out bearing capacity of single pile Qtk——Standard value of axial pull-out ultimate bearing capacity of single pile Vd——Design value of shear force of pile body at bed rock top surface d——Internal diameter of pile, diameter of rock-socketed segment or diameter of anchor bolt steel bar fck——Standard value of axial compressive strength of concrete frc——Standard value of uniaxial compressive strength of saturated rock fy——Design value of tensile strength of anchor bolt steel bar fyk——Standard value of yield strength of anchor bolt steel bar hr——Rock-socketed depth qfi——Sandard value of ultimate lateral resistance of the ith layer of soil for single pile qfk——Standard value of bond strength γ——Partial coefficient μ——Circumference of pile body ε——Calculation coefficient of resistance 3 General Requirements 3.0.1 Design and construction of rock-socketed piles shall be provided with the following data: (1) Service requirements; (2) Hydrology, weather, topography, environment and water depth data; (3) Geological conditions and engineering geological evaluation; (4) Necessary load test and standing stability test condition; (5) Investigation condition of obstructions affecting construction; (6) Performance of main construction equipment, etc. 3.0.2 The type of rock-socketed piles shall be determined through technical and economic proof according to service requirements and geological conditions such as buried depth of bed rock. Rock-socketed piles may adopt cast-in-place rock-socketed piles, cast-in-place anchor-bolt rock-socketed piles, precast imbedded rock-socketed piles, precast core-column rock-socketed piles, precast anchor-bolt rock-socketed piles or combined rock-socketed piles. Rock-socketed piles may be vertical piles or batter piles. 3.0.3 Bearing capacity of rock-socketed piles shall be calculated respectively according to pile body structure strength and supporting capacity of foundation to pile based on different load carrying conditions.
Contents of JTJ 285-2000
1 General Provisions 2 Terms and Symbols 2.1 Terms 2.2 Main Symbols 3 General Requirements 4 Bearing Capacity 4.1 General Requirements 4.2 Axial Bearing Capacity of Piles 4.3 Calculation of Piles under the Action of Horizontal Force 5 Structure Design 5.1 General Requirements 5.2 Structural Calculation of Pile Body 5.3 Structure of Cast-in-place Rock-socketed Piles 5.4 Structural Selection and Structure of Precast Rock-socketed Piles 6 Construction 6.1 Construction Preparation 6.2 General Requirements 6.3 Pile Sinking and Stabilization Process 6.4 Overwater Construction Platform 6.5 Hole Forming 6.6 Underwater Concrete Grouting 6.7 Construction of Cast-in-place Rock-socketed Piles 6.8 Construction of Precast Imbedded Rock-socketed Piles 6.9 Construction of Precast Core-column Rock-socketed Piles 6.10 Construction of Precast Anchor-bolt Rock-socketed Piles 6.11 Construction of Combined Rock-socketed Piles 7 Construction Quality Control 7.1 Permissible Deviation of Pile Position 7.2 Quality Control during Construction Process 8 Load Test 8.1 Axial Static Load Test of Single Pile 8.2 Horizontal Static Load Test of Single Pile 8.3 Pull-out Static Load Test of Anchor Bolt of Anchor-bolt Rock-socketed Piles Appendix A Engineering Properties of Bed Rock Appendix B Rock-socketed Type and Construction Diagram of Rock-socketed Piles Appendix C Reference Table of Properties of Various Rock-socketed Pile Drills Appendix D Reference Table of Main Technical Indexes of Steel Bar Extruder Appendix E Pile Stabilization Calculation and Placing Process of Reinforced Concrete Casing Box Appendix F Explanation of Wording in This Code Additional Explanation
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
JTJ 285-2000, JTJ/T 285-2000, JTJT 285-2000, JTJ285-2000, JTJ 285, JTJ285, JTJ/T285-2000, JTJ/T 285, JTJ/T285, JTJT285-2000, JTJT 285, JTJT285