2025-12-14 216.73.216.3
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/JTS 167-3-2009
JTS 167-3-2009   Code for Design and Construction for Quay Wall of Sheet Pile (English Version)
Standard No.: JTS 167-3-2009 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 20000 words Translation Price(USD):400.0 remind me the price change

Email:

Implemented on:2009-9-1 Delivery: via email in 1 business day

→ → →

,2018-6-1,2009-9-1,14113796452764C99265FE82F1F27
Standard No.: JTS 167-3-2009
English Name: Code for Design and Construction for Quay Wall of Sheet Pile
Chinese Name: 板桩码头设计与施工规范
Professional Classification: JT    Professional Standard - Transport
Source Content Issued by: MOT
Issued on: 2009-4-17
Implemented on: 2009-9-1
Status: superseded
Superseded by:JTS 215-2018 Construction Code for Wharf Structures
JTS 167-2018 Design Code for Wharf Structures
Superseded on:2018-6-1
Superseding:JTJ 292-1998 Code for Design and Construction for Quay Wall of Sheet Pile
Target Language: English
File Format: PDF
Word Count: 20000 words
Translation Price(USD): 400.0
Delivery: via email in 1 business day
1 General 1.0.1 This Code is formulated with a view to unifying the design and construction technical requirements of sheet pile quay wall and achieving the purposes of advanced technology, economic rationality, safety, reliability and durability. 1.0.2 This Code is applicable to the design and construction of newly-built, expanded or reconstructed sheet pile quay wall engineering, and may be implemented by reference for the design and construction sheet pile type revetment and cofferdam. 1.0.3 The design and installation of sheet pile quay wall shall comply with not only the requirements stipulated in this Code, but also those in the current relevant national standards. 2 Terms 2.0.1 Front wall It refers to river side wall in the quay, revetment or cofferdam engineering. 2.0.2 Sheet pile wall It refers to the wall constructed by sheet pile. 2.0.3 Anchor plate It refers to the plate used as the anchor structure for front wall. 2.0.4 Anchor wall It refers to the wall composed by successive anchor plates. 2.0.5 Anchor pile It refers to the pile used as the anchor structure for front wall. 2.0.6 Anchor pile wall It refers to the wall composed by successive anchor piles. 2.0.7 Anchor raking pile It refers to the raking pile used as the anchor structure for front wall. 2.0.8 Tie rod It refers to the rod linking the front wall and the anchor structure. 2.0.9 Cap beam It refers to the linking beam arranged at the top of the front wall or the anchor structure. 2.0.10 Guide beam It refers to the continuous beam arranged at the tie rod end to provide overall force on the front wall or the anchor structure. 2.0.11 Batter tension pile It refers to the pile under an oblique tension and used to anchor the front wall. 2.0.12 Covered pile It refers to the pile arranged at the rear side of the front wall and used to reduce the soil pressure of the front wall. 3 Basic Requirements 3.1 General Requirements 3.1.1 The structure form of sheet pile quay wall shall be determined through technical and economic comparison and selection according to factors such as natural conditions, operation requirements, construction conditions and project duration. 3.1.2 The sheet pile type structure is applicable to soil base conditions; where the bedrock surface is shallow, full consideration shall be taken for the construction difficulty and economic efficiency. 3.1.3 Certain quantity of permanent observation points shall be set at proper places of sheet pile quay wall to regularly observe the settlement, displacement and tilt of quay.
1 General 2 Terms 3 Basic Requirements 3.1 General Requirements 3.2 Structure Selection 3.3 Durability Design 4 Structure 4.1 General Requirements 4.2 Front Wall 4.3 Tie Rod 4.4 Anchor Structure 4.5 Cap Beam, Guide Beam and Breast Wall 4.6 Sheet Pile Quay Wall with Batter Tension Pile 4.7 Covered Sheet Pile Quay Wall 4.8 Unloading Sheet Pile Quay Wall 5 Design Calculation 5.1 Action and Action Composition 5.2 Residual Water Pressure and Soil Pressure 5.3 Front Wall Calculation 5.4 Anchor Structure Calculation 5.5 Calculation of Sheet Pile Quay Wall with Batter Tension Pile 5.6 Calculation of Covered Sheet Pile Quay Wall 5.7 Calculation of Unloading Sheet Pile Quay Wall 5.8 Check and Calculation of Overall Stability 6 Member Design 6.1 General Requirements 6.2 Front Wall 6.3 Tie Rod 6.4 Anchor Structure 6.5 Cap Beam, Guide Beam and Breast Wall 7 Construction 7.1 General Requirements 7.2 Prefabrication, Storage and Transportation of Reinforced Concrete Sheet Pile 7.3 Acceptance, Processing, Storage and Transportation of Steel Sheet Piles 7.4 Construction of Sheet Pile Wall 7.5 Construction of Diaphragm Wall 7.6 Construction of Breast Wall, Cap Beam and Guide Beam 7.7 Construction of Anchor Structure 7.8 Construction of Tie Rod 7.9 Backfilling 7.10 Quay Apron Dredging Appendix A Coefficient of Horizontal Foundation Reaction Appendix B Internal Force Calculation of Sheet Pile Quay Wall with Batter Tension Pile Appendix C Explanation of Wording in This Code Additional Explanation Name List of Chief Development Organization, Participating Organization, Chief Drafting Staffs, General Verification Personnel and Administrative Group
Code of China
Standard
JTS 167-3-2009  Code for Design and Construction for Quay Wall of Sheet Pile (English Version)
Standard No.JTS 167-3-2009
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count20000 words
Price(USD)400.0
Implemented on2009-9-1
Deliveryvia email in 1 business day
Detail of JTS 167-3-2009
Standard No.
JTS 167-3-2009
English Name
Code for Design and Construction for Quay Wall of Sheet Pile
Chinese Name
板桩码头设计与施工规范
Chinese Classification
Professional Classification
JT
ICS Classification
Issued by
MOT
Issued on
2009-4-17
Implemented on
2009-9-1
Status
superseded
Superseded by
JTS 215-2018 Construction Code for Wharf Structures
JTS 167-2018 Design Code for Wharf Structures
Superseded on
2018-6-1
Abolished on
Superseding
JTJ 292-1998 Code for Design and Construction for Quay Wall of Sheet Pile
Language
English
File Format
PDF
Word Count
20000 words
Price(USD)
400.0
Keywords
JTS 167-3-2009, JTS/T 167-3-2009, JTST 167-3-2009, JTS167-3-2009, JTS 167, JTS167, JTS/T167-3-2009, JTS/T 167, JTS/T167, JTST167-3-2009, JTST 167, JTST167
Introduction of JTS 167-3-2009
1 General 1.0.1 This Code is formulated with a view to unifying the design and construction technical requirements of sheet pile quay wall and achieving the purposes of advanced technology, economic rationality, safety, reliability and durability. 1.0.2 This Code is applicable to the design and construction of newly-built, expanded or reconstructed sheet pile quay wall engineering, and may be implemented by reference for the design and construction sheet pile type revetment and cofferdam. 1.0.3 The design and installation of sheet pile quay wall shall comply with not only the requirements stipulated in this Code, but also those in the current relevant national standards. 2 Terms 2.0.1 Front wall It refers to river side wall in the quay, revetment or cofferdam engineering. 2.0.2 Sheet pile wall It refers to the wall constructed by sheet pile. 2.0.3 Anchor plate It refers to the plate used as the anchor structure for front wall. 2.0.4 Anchor wall It refers to the wall composed by successive anchor plates. 2.0.5 Anchor pile It refers to the pile used as the anchor structure for front wall. 2.0.6 Anchor pile wall It refers to the wall composed by successive anchor piles. 2.0.7 Anchor raking pile It refers to the raking pile used as the anchor structure for front wall. 2.0.8 Tie rod It refers to the rod linking the front wall and the anchor structure. 2.0.9 Cap beam It refers to the linking beam arranged at the top of the front wall or the anchor structure. 2.0.10 Guide beam It refers to the continuous beam arranged at the tie rod end to provide overall force on the front wall or the anchor structure. 2.0.11 Batter tension pile It refers to the pile under an oblique tension and used to anchor the front wall. 2.0.12 Covered pile It refers to the pile arranged at the rear side of the front wall and used to reduce the soil pressure of the front wall. 3 Basic Requirements 3.1 General Requirements 3.1.1 The structure form of sheet pile quay wall shall be determined through technical and economic comparison and selection according to factors such as natural conditions, operation requirements, construction conditions and project duration. 3.1.2 The sheet pile type structure is applicable to soil base conditions; where the bedrock surface is shallow, full consideration shall be taken for the construction difficulty and economic efficiency. 3.1.3 Certain quantity of permanent observation points shall be set at proper places of sheet pile quay wall to regularly observe the settlement, displacement and tilt of quay.
Contents of JTS 167-3-2009
1 General 2 Terms 3 Basic Requirements 3.1 General Requirements 3.2 Structure Selection 3.3 Durability Design 4 Structure 4.1 General Requirements 4.2 Front Wall 4.3 Tie Rod 4.4 Anchor Structure 4.5 Cap Beam, Guide Beam and Breast Wall 4.6 Sheet Pile Quay Wall with Batter Tension Pile 4.7 Covered Sheet Pile Quay Wall 4.8 Unloading Sheet Pile Quay Wall 5 Design Calculation 5.1 Action and Action Composition 5.2 Residual Water Pressure and Soil Pressure 5.3 Front Wall Calculation 5.4 Anchor Structure Calculation 5.5 Calculation of Sheet Pile Quay Wall with Batter Tension Pile 5.6 Calculation of Covered Sheet Pile Quay Wall 5.7 Calculation of Unloading Sheet Pile Quay Wall 5.8 Check and Calculation of Overall Stability 6 Member Design 6.1 General Requirements 6.2 Front Wall 6.3 Tie Rod 6.4 Anchor Structure 6.5 Cap Beam, Guide Beam and Breast Wall 7 Construction 7.1 General Requirements 7.2 Prefabrication, Storage and Transportation of Reinforced Concrete Sheet Pile 7.3 Acceptance, Processing, Storage and Transportation of Steel Sheet Piles 7.4 Construction of Sheet Pile Wall 7.5 Construction of Diaphragm Wall 7.6 Construction of Breast Wall, Cap Beam and Guide Beam 7.7 Construction of Anchor Structure 7.8 Construction of Tie Rod 7.9 Backfilling 7.10 Quay Apron Dredging Appendix A Coefficient of Horizontal Foundation Reaction Appendix B Internal Force Calculation of Sheet Pile Quay Wall with Batter Tension Pile Appendix C Explanation of Wording in This Code Additional Explanation Name List of Chief Development Organization, Participating Organization, Chief Drafting Staffs, General Verification Personnel and Administrative Group
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
JTS 167-3-2009, JTS/T 167-3-2009, JTST 167-3-2009, JTS167-3-2009, JTS 167, JTS167, JTS/T167-3-2009, JTS/T 167, JTS/T167, JTST167-3-2009, JTST 167, JTST167