2025-12-13 216.73.216.3
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/NB/T 35001-2011
NB/T 35001-2011   Design stipulations for reservoir dispatching automation system of cascade hydropower plants (English Version)
Standard No.: NB/T 35001-2011 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 20000 words Translation Price(USD):600.0 remind me the price change

Email:

Implemented on:2011-11-1 Delivery: via email in 1~3 business day

→ → →

2024-11-24,2024-11-24,2011-11-1,14113777378840FF5641FA6DB89DA
Standard No.: NB/T 35001-2011
English Name: Design stipulations for reservoir dispatching automation system of cascade hydropower plants
Chinese Name: 梯级水电站水调自动化系统设计规范
Chinese Classification: P55    Water conservancy and water power engineering in general
Professional Classification: NB    Professional Standard - Energy
Source Content Issued by: NEA
Issued on: 2011-7-28
Implemented on: 2011-11-1
Status: superseded
Superseded by:NB/T 35001-2024 Code for Design of Reservoir Operation Automation System for Cascade Hydropower Stations
Superseded on:2024-11-24
Abolished on:2024-11-24
Target Language: English
File Format: PDF
Word Count: 20000 words
Translation Price(USD): 600.0
Delivery: via email in 1~3 business day
Code of China
Standard
NB/T 35001-2011  Design stipulations for reservoir dispatching automation system of cascade hydropower plants (English Version)
Standard No.NB/T 35001-2011
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count20000 words
Price(USD)600.0
Implemented on2011-11-1
Deliveryvia email in 1~3 business day
Detail of NB/T 35001-2011
Standard No.
NB/T 35001-2011
English Name
Design stipulations for reservoir dispatching automation system of cascade hydropower plants
Chinese Name
梯级水电站水调自动化系统设计规范
Chinese Classification
P55
Professional Classification
NB
ICS Classification
Issued by
NEA
Issued on
2011-7-28
Implemented on
2011-11-1
Status
superseded
Superseded by
NB/T 35001-2024 Code for Design of Reservoir Operation Automation System for Cascade Hydropower Stations
Superseded on
2024-11-24
Abolished on
2024-11-24
Superseding
Language
English
File Format
PDF
Word Count
20000 words
Price(USD)
600.0
Keywords
NB/T 35001-2011, NB 35001-2011, NBT 35001-2011, NB/T35001-2011, NB/T 35001, NB/T35001, NB35001-2011, NB 35001, NB35001, NBT35001-2011, NBT 35001, NBT35001
Introduction of NB/T 35001-2011
Contents of NB/T 35001-2011
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
NB/T 35001-2011, NB 35001-2011, NBT 35001-2011, NB/T35001-2011, NB/T 35001, NB/T35001, NB35001-2011, NB 35001, NB35001, NBT35001-2011, NBT 35001, NBT35001