Q/GDW 617-2011   Technical rule for photovoltaic power station connected to Power Grid (English Version)
Standard No.: Q/GDW 617-2011 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 6000 words Translation Price(USD):238.0 remind me the price change

Email:

Implemented on:2011-5-6 Delivery: via email in 1 business day

→ → →

,,2011-5-6,CE500AD6C5D20FFB1418878552971
Standard No.: Q/GDW 617-2011
English Name: Technical rule for photovoltaic power station connected to Power Grid
Chinese Name: 光伏电站接入电网技术规定
Professional Classification: Q/    Corporate Standard
Source Content Issued by: State Grid
Issued on: 2011-5-6
Implemented on: 2011-5-6
Status: valid
Target Language: English
File Format: PDF
Word Count: 6000 words
Translation Price(USD): 238.0
Delivery: via email in 1 business day
1 Scope This standard specifies the general principles and technical requirements which the operation of PV power station connected to the power grid shall adhere to. The standard is applicable to newly-built or expanded grid-connected PV power station connected to 380 V and above power grid, including the connection with and without isolating transformers. It is not applicable to off-grid PV power station. 2 Normative References The following documents are essential to the application of the standard. For dated references, only the dated edition is applicable to the standard. For the undated references, the latest edition (with all the amendments) applies. GB 2894 Safety Signs GB / T 12325 Power Quality - Deviation of Supply Voltage GB/T 12326 Power Quality - Voltage Fluctuation and Flicker GB / T 14549 Power Quality - Harmonics in Public Grid GB / T 15543 Power Quality - Three-Phase Voltage Unbalance GB 16179 Guidelines for the Use of Safety Signs GB / T 17883 0.2 S and 0.5 - Active Kilowatt Hour Meter of Static AC GB / T 24337 Power Quality - Harmonic Wave Between Public Grid DL/T 448 Technical Administrative Code of Power Metering DL/T 614 Multi-function Watt-hour Meter DL/T 645 Multi-Functional Watt-Hour Meter Communication Protocols SJ / T 11127 Guidelines for Overvoltage Protection of PV Power Station IEC 61000-4-30-2003 Electromagnetic Compatibility (EMC)-Part 4-30 Testing and Measurement Techniques-Power Quality Measurement Methods-Edition 1.0) 3 Terms and Definitions The following terms and definitions are applicable to the document. 3.1 Photovoltaic (PV) power station A power generation system which utilizes photo-production voltage effect of solar battery and transforms solar radiation energy into electric energy, generally including transformers, inverters, relevant parts of balance of system (BOS) and solar battery phalange. 3.2 Grid-connected PV power station PV power station in operation, connected to public grid directly or indirectly 3.3 Point of common coupling (PCC) The joint of more than one user in power system 3.4 Point of interconnection (POI ) of PV power station For PV power station with booster station, the point refers to the busbar or node at the high-voltage side of the booster station. For PV power station without booster station, the point refers to the output convergence point of PV power station. 3.5 Transmission line of PV power station Transmission line from POI of PV power station to point of common coupling 3.6 Active power of grid connected PV power station The reactive power from the input of PV power station to the POI of PV power station 3.7 Reactive power of grid -connected PV power station The active power from the input of PV power station to the POI of PV power station 3.8 Active power change The difference between the maximum value and the minimum value of active power of PV power station in a certain interval (the standard specifies active power change for one minute and 10 minutes) 3.9 Low voltage ride through Where the voltage drops at the POI of PV power station due to the accident or disturbance of electric power system, PV power station is guaranteed to operate continuously without escape from the grid in a certain voltage drop range and certain interval. 3.10 Islanding At voltage loss of the grid, PV power station still continues to supply power to a certain part of the line in the voltage loss grid. The islanding can be separated into unintentional islanding and intentional islanding. 3.11 Unintentional islanding Islanding occurs unintentionally and uncontrolledly. 3.12 Intentional islanding Islanding occurs intentionally according to prearranged control strategy. 3.13 Anti-islanding Unintentional islanding is prohibited to occur.
Foreword I 1 Scope 2 Normative References 3 Terms and Definitions 4 General Principles 5 Power Quality 6 Power and Voltage 7 Response Feature of Abnormal Power Grid 8 Safety and Protection 9 General Technical Conditions 10 Power Metering 11 Communication and Signal 12 System Test
Referred in Q/GDW 617-2011:
*GB 2894-2008 Safety Signs and Guideline for the Use
*GB/T 12325-2008 Power quality - Deviation of supply voltage
*GB/T 12326-2008 Power quality - Voltage fluctuation and flicker
*GB/T 14549-1993 Quality of Electric Energy Supply - Harmonics in Public Supply Network
*GB/T 15543-2008 Power quality—Three-phase voltage
*GB 16179-1996 Guidelines for the use of safety signs
*GB/T 17883-1999 Alternating current static watt-hour meters for active energy (classes 0.2S and 0.5S)
*GB/T 24337-2009 Power quality—Interharmonics in public supply network
*DL/T 448-2016 Technical administrative code of electric energy metering
*DL/T 645-2007 Multi-function watt-hour meter communication protocol
*SJ/T 11127-1997
Q/GDW 617-2011 is referred in:
*Q-GDW 618-2011 Test Procedures for photovoltaic power station connected to Power Grid
*CNCA/CTS 0004-2009A Technical Specification of Grid-connected PV inverter
*Q/GDW 618-2011 Test Procedures for photovoltaic power station connected to Power Grid
Code of China
Standard
Q/GDW 617-2011  Technical rule for photovoltaic power station connected to Power Grid (English Version)
Standard No.Q/GDW 617-2011
Statusvalid
LanguageEnglish
File FormatPDF
Word Count6000 words
Price(USD)238.0
Implemented on2011-5-6
Deliveryvia email in 1 business day
Detail of Q/GDW 617-2011
Standard No.
Q/GDW 617-2011
English Name
Technical rule for photovoltaic power station connected to Power Grid
Chinese Name
光伏电站接入电网技术规定
Chinese Classification
Professional Classification
Q/
ICS Classification
Issued by
State Grid
Issued on
2011-5-6
Implemented on
2011-5-6
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
6000 words
Price(USD)
238.0
Keywords
Q/GDW 617-2011, Q/GDWT 617-2011, QGDWT 617-2011, Q/GDW617-2011, Q/GDW 617, Q/GDW617, Q/GDWT617-2011, Q/GDWT 617, Q/GDWT617, QGDWT617-2011, QGDWT 617, QGDWT617
Introduction of Q/GDW 617-2011
1 Scope This standard specifies the general principles and technical requirements which the operation of PV power station connected to the power grid shall adhere to. The standard is applicable to newly-built or expanded grid-connected PV power station connected to 380 V and above power grid, including the connection with and without isolating transformers. It is not applicable to off-grid PV power station. 2 Normative References The following documents are essential to the application of the standard. For dated references, only the dated edition is applicable to the standard. For the undated references, the latest edition (with all the amendments) applies. GB 2894 Safety Signs GB / T 12325 Power Quality - Deviation of Supply Voltage GB/T 12326 Power Quality - Voltage Fluctuation and Flicker GB / T 14549 Power Quality - Harmonics in Public Grid GB / T 15543 Power Quality - Three-Phase Voltage Unbalance GB 16179 Guidelines for the Use of Safety Signs GB / T 17883 0.2 S and 0.5 - Active Kilowatt Hour Meter of Static AC GB / T 24337 Power Quality - Harmonic Wave Between Public Grid DL/T 448 Technical Administrative Code of Power Metering DL/T 614 Multi-function Watt-hour Meter DL/T 645 Multi-Functional Watt-Hour Meter Communication Protocols SJ / T 11127 Guidelines for Overvoltage Protection of PV Power Station IEC 61000-4-30-2003 Electromagnetic Compatibility (EMC)-Part 4-30 Testing and Measurement Techniques-Power Quality Measurement Methods-Edition 1.0) 3 Terms and Definitions The following terms and definitions are applicable to the document. 3.1 Photovoltaic (PV) power station A power generation system which utilizes photo-production voltage effect of solar battery and transforms solar radiation energy into electric energy, generally including transformers, inverters, relevant parts of balance of system (BOS) and solar battery phalange. 3.2 Grid-connected PV power station PV power station in operation, connected to public grid directly or indirectly 3.3 Point of common coupling (PCC) The joint of more than one user in power system 3.4 Point of interconnection (POI ) of PV power station For PV power station with booster station, the point refers to the busbar or node at the high-voltage side of the booster station. For PV power station without booster station, the point refers to the output convergence point of PV power station. 3.5 Transmission line of PV power station Transmission line from POI of PV power station to point of common coupling 3.6 Active power of grid connected PV power station The reactive power from the input of PV power station to the POI of PV power station 3.7 Reactive power of grid -connected PV power station The active power from the input of PV power station to the POI of PV power station 3.8 Active power change The difference between the maximum value and the minimum value of active power of PV power station in a certain interval (the standard specifies active power change for one minute and 10 minutes) 3.9 Low voltage ride through Where the voltage drops at the POI of PV power station due to the accident or disturbance of electric power system, PV power station is guaranteed to operate continuously without escape from the grid in a certain voltage drop range and certain interval. 3.10 Islanding At voltage loss of the grid, PV power station still continues to supply power to a certain part of the line in the voltage loss grid. The islanding can be separated into unintentional islanding and intentional islanding. 3.11 Unintentional islanding Islanding occurs unintentionally and uncontrolledly. 3.12 Intentional islanding Islanding occurs intentionally according to prearranged control strategy. 3.13 Anti-islanding Unintentional islanding is prohibited to occur.
Contents of Q/GDW 617-2011
Foreword I 1 Scope 2 Normative References 3 Terms and Definitions 4 General Principles 5 Power Quality 6 Power and Voltage 7 Response Feature of Abnormal Power Grid 8 Safety and Protection 9 General Technical Conditions 10 Power Metering 11 Communication and Signal 12 System Test
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
Q/GDW 617-2011, Q/GDWT 617-2011, QGDWT 617-2011, Q/GDW617-2011, Q/GDW 617, Q/GDW617, Q/GDWT617-2011, Q/GDWT 617, Q/GDWT617, QGDWT617-2011, QGDWT 617, QGDWT617