SH 3505.2-1999   Technical code for construction safety in petrochemical engineering (Building Engineering) (English Version)
Standard No.: SH 3505.2-1999 Status:abolished remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 14000 words Translation Price(USD):350.0 remind me the price change

Email:

Implemented on:2001-3-1 Delivery: via email in 1 business day

→ → →

2010-01-20,,2001-3-1,14113735583024F80EEEA9A24442E
Standard No.: SH 3505.2-1999
English Name: Technical code for construction safety in petrochemical engineering (Building Engineering)
Chinese Name: 石油化工施工安全技术规程(建筑工程)
Chinese Classification: P09    Hygiene, safety and labor protection
Professional Classification: SH    Professional Standard - Petrochemical
Source Content Issued by: SINOPEC
Issued on: 1999-4-15
Implemented on: 2001-3-1
Status: abolished
Abolished on:2010-01-20
Superseding:SHJ 505-1987
Target Language: English
File Format: PDF
Word Count: 14000 words
Translation Price(USD): 350.0
Delivery: via email in 1 business day
1.1.1 Prior to earthwork construction, contact the departments concerned, conduct exploration, investigation and treatment over the geology, hydrology, underground facilities, tombs and sand tunnels of the construction section, and the ground may be broken for construction after construction permit is obtained. 1.1.2 As for earthwork excavation, sinking or deformation of adjacent buildings (structures), roads, pipelines and other facilities shall be avoided. When the excavation depth exceeds the foundation of the existing buildings (structures), excavation shall be conducted by segment, the length for excavation each time shall not exceed 2m. 1.1.3 During earthwork construction, if any unidentified object is discovered, it shall not be knocked, damaged or moved, report to the relevant departments immediately to find out the facts, and the construction may be continued only after effective measures have be taken. 1.1.4 In case of earthwork operation in the region or on the road with vehicles and personnel coming and going, the construction section shall be set with fences, warning boards and night red lights. During underpass excavation, when the ground activities influence underground safety, fences, warning boards and night red lights shall be set. 1.1.5 Prior to conducting operation in foundation trench or foundation pit after rain or in thawing period, it shall be firstly checked that whether the earthwork side slope has any danger sign such as crack, collapse, support deformation and fracture, and the construction may be conducted only after safety is ensured. 1.1.6 In case of construction in pit, ditch, well and underpass, the harmful gas and oxygen concentration shall be checked first, when the harmful gas exceeds the specified concentration or when the oxygen is deficient, operation shall be stopped, and the construction may be continued only after effective measures have been taken. 1.1.7 The excavation of earthwork shall be conducted from top to bottom layer by layer, hollowing the footing and digging hole are strictly forbidden. 1.1.8 When there is no reinforced support, earthwork, stonework or other materials shall not be stacked within the scope of the natural slope angle of the edge soil of foundation trench and foundation pit. 1.1.9 It is strictly forbidden to put construction machinery and lay rails and traffic transportation machinery within the scope of the natural slope angle of the edge soil of foundation trench and foundation pit. 1.1.10 When the earthwork excavation or backfill tamping depth exceeds 1.5m, specific personnel shall be dispatched for monitoring or patrol inspection above the operation area. 1.1.11 Operation personnel must not take a rest in foundation trench and foundation pit. 1.1.12 The application of earthwork construction machinery shall also comply with the relevant requirements of "Technical Specification for Safety Operation of Construction Machinery" (JGJ 33).
1 Earth and Stone Work 1.1 General Provisions 1.2 Earthwork Excavation 1.3 Earthwork Backfilling and Tamping 1.4 Stonework 2 Blasting Operation 3 Scaffold Operation 3.1 Scaffold Materials 3.2 Erection of Scaffold 3.3 Hanger Frame and Basket 3.4 Ramp Way and Escalator 3.5 Scaffold Removing 4 Wood Operation 5 Pile Foundation Operation 5.1 General Provisions 5.2 Pile Driving 6 Heavy Tamping Operation 6.1 General Provisions 6.2 Tamping Construction 7 Open Caisson Operation 8 Masonry Operation 8.1 Wall Masonry 8.2 Chimney Masonry 8.3 Masonry of Furnace 8.4 Anti-corrosion Masonry 8.5 Hanging Tiles 9 Steel Bar Operation 9.1 General Provisions 9.2 Steel Bar Colligation and Butting 10 Concrete Formwork 10.1 Mixing of Concrete 10.2 Concrete Transportation 10.3 Pouring and Tamping 11 Slipform Operation 12 Decorative Operation 12.1 Interior Decoration 12.2 Exterior Wall Decoration 13 Asphalt Operation
Code of China
Standard
SH 3505.2-1999  Technical code for construction safety in petrochemical engineering (Building Engineering) (English Version)
Standard No.SH 3505.2-1999
Statusabolished
LanguageEnglish
File FormatPDF
Word Count14000 words
Price(USD)350.0
Implemented on2001-3-1
Deliveryvia email in 1 business day
Detail of SH 3505.2-1999
Standard No.
SH 3505.2-1999
English Name
Technical code for construction safety in petrochemical engineering (Building Engineering)
Chinese Name
石油化工施工安全技术规程(建筑工程)
Chinese Classification
P09
Professional Classification
SH
ICS Classification
Issued by
SINOPEC
Issued on
1999-4-15
Implemented on
2001-3-1
Status
abolished
Superseded by
Superseded on
Abolished on
2010-01-20
Superseding
SHJ 505-1987
Language
English
File Format
PDF
Word Count
14000 words
Price(USD)
350.0
Keywords
SH 3505.2-1999, SH/T 3505.2-1999, SHT 3505.2-1999, SH3505.2-1999, SH 3505.2, SH3505.2, SH/T3505.2-1999, SH/T 3505.2, SH/T3505.2, SHT3505.2-1999, SHT 3505.2, SHT3505.2
Introduction of SH 3505.2-1999
1.1.1 Prior to earthwork construction, contact the departments concerned, conduct exploration, investigation and treatment over the geology, hydrology, underground facilities, tombs and sand tunnels of the construction section, and the ground may be broken for construction after construction permit is obtained. 1.1.2 As for earthwork excavation, sinking or deformation of adjacent buildings (structures), roads, pipelines and other facilities shall be avoided. When the excavation depth exceeds the foundation of the existing buildings (structures), excavation shall be conducted by segment, the length for excavation each time shall not exceed 2m. 1.1.3 During earthwork construction, if any unidentified object is discovered, it shall not be knocked, damaged or moved, report to the relevant departments immediately to find out the facts, and the construction may be continued only after effective measures have be taken. 1.1.4 In case of earthwork operation in the region or on the road with vehicles and personnel coming and going, the construction section shall be set with fences, warning boards and night red lights. During underpass excavation, when the ground activities influence underground safety, fences, warning boards and night red lights shall be set. 1.1.5 Prior to conducting operation in foundation trench or foundation pit after rain or in thawing period, it shall be firstly checked that whether the earthwork side slope has any danger sign such as crack, collapse, support deformation and fracture, and the construction may be conducted only after safety is ensured. 1.1.6 In case of construction in pit, ditch, well and underpass, the harmful gas and oxygen concentration shall be checked first, when the harmful gas exceeds the specified concentration or when the oxygen is deficient, operation shall be stopped, and the construction may be continued only after effective measures have been taken. 1.1.7 The excavation of earthwork shall be conducted from top to bottom layer by layer, hollowing the footing and digging hole are strictly forbidden. 1.1.8 When there is no reinforced support, earthwork, stonework or other materials shall not be stacked within the scope of the natural slope angle of the edge soil of foundation trench and foundation pit. 1.1.9 It is strictly forbidden to put construction machinery and lay rails and traffic transportation machinery within the scope of the natural slope angle of the edge soil of foundation trench and foundation pit. 1.1.10 When the earthwork excavation or backfill tamping depth exceeds 1.5m, specific personnel shall be dispatched for monitoring or patrol inspection above the operation area. 1.1.11 Operation personnel must not take a rest in foundation trench and foundation pit. 1.1.12 The application of earthwork construction machinery shall also comply with the relevant requirements of "Technical Specification for Safety Operation of Construction Machinery" (JGJ 33).
Contents of SH 3505.2-1999
1 Earth and Stone Work 1.1 General Provisions 1.2 Earthwork Excavation 1.3 Earthwork Backfilling and Tamping 1.4 Stonework 2 Blasting Operation 3 Scaffold Operation 3.1 Scaffold Materials 3.2 Erection of Scaffold 3.3 Hanger Frame and Basket 3.4 Ramp Way and Escalator 3.5 Scaffold Removing 4 Wood Operation 5 Pile Foundation Operation 5.1 General Provisions 5.2 Pile Driving 6 Heavy Tamping Operation 6.1 General Provisions 6.2 Tamping Construction 7 Open Caisson Operation 8 Masonry Operation 8.1 Wall Masonry 8.2 Chimney Masonry 8.3 Masonry of Furnace 8.4 Anti-corrosion Masonry 8.5 Hanging Tiles 9 Steel Bar Operation 9.1 General Provisions 9.2 Steel Bar Colligation and Butting 10 Concrete Formwork 10.1 Mixing of Concrete 10.2 Concrete Transportation 10.3 Pouring and Tamping 11 Slipform Operation 12 Decorative Operation 12.1 Interior Decoration 12.2 Exterior Wall Decoration 13 Asphalt Operation
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
SH 3505.2-1999, SH/T 3505.2-1999, SHT 3505.2-1999, SH3505.2-1999, SH 3505.2, SH3505.2, SH/T3505.2-1999, SH/T 3505.2, SH/T3505.2, SHT3505.2-1999, SHT 3505.2, SHT3505.2