2025-12-15 216.73.216.89
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/TB 10755-2010
TB 10755-2010   Standard for constructional quality acceptance of high-speed railway communication engineering (English Version)
Standard No.: TB 10755-2010 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 52000 words Translation Price(USD):1700.0 remind me the price change

Email:

Implemented on:2010-12-8 Delivery: via email in 1 business day

→ → →

,2019-2-1,2010-12-8,40B0B747793D11791419346246441
Standard No.: TB 10755-2010
English Name: Standard for constructional quality acceptance of high-speed railway communication engineering
Chinese Name: 高速铁路通信工程施工质量验收标准
Professional Classification: TB    Professional Standard - Railway Transport
Source Content Issued by: Ministry of Railways
Issued on: 2010-12-08
Implemented on: 2010-12-8
Status: superseded
Superseded by:TB 10755-2018 Standard for Acceptance of Communication Works in High-speed Railway
Superseded on:2019-2-1
Target Language: English
File Format: PDF
Word Count: 52000 words
Translation Price(USD): 1700.0
Delivery: via email in 1 business day
1 General Provisions 1.0.1 This standard is formulated with a view to strengthening constructional quality management, unifying standard for acceptance and ensuring constructional quality of high-speed railway communication engineering. 1.0.2 This standard is applicable to the constructional quality acceptance of newly-built 250~350km/h high-speed railway communication engineering. The constructional quality acceptance of signaling engineering for passenger dedicated line and inter-city railway in speed less than 250km/h may also refer to this standard. 1.0.3 The construction parties concerned of high-speed railway communication engineering shall establish and improve quality assurance system, conduct whole-process control over the constructional quality of engineering, and implement lifelong quality accountability system to management, technical and operating personnel. 1.0.4 The construction parties concerned of high-speed railway communication engineering shall standardize management system, personnel allocation, site management and process control, and implement construction and management requirements such as quality, safety, construction period, investment returns, environmental protection and technological innovation. 1.0.5 The construction of high-speed railway communication engineering shall fully comply with the national laws and regulations and the relevant technical standards and be in strict accordance with the design documents, the constructional quality shall meet the requirements for use functions, safety and quality performance of system, and the engineering shall be ensured of normal use during the design service life. 1.0.6 Main equipment and apparatuses adopted in high-speed railway communication engineering shall meet those specified in the relevant national and professional standards and admittance for railway industry. 1.0.7 Requirements for constructional quality as stated in the contract documents and engineering technical documents adopted in construction of high-speed railway communication engineering shall not be inferior to those specified in this standard; otherwise, these requirements shall prevail. 1.0.8 During construction of high-speed railway communication engineering, efforts shall be made to implement sustainable development strategy of the national economy, make rational utilization of resources and properly carry out environmental protection and water & soil conservation. 1.0.9 The construction of high-speed railway communication engineering shall comply with the current relevant labor protection laws and regulations of the nation to ensure health of constructors and to avoid or reduce harm. 1.0.10 For the construction of high-speed railway communication engineering, mechanized, industrialized, specialized and informationized construction measures shall be positively adopted. 1.0.11 For the construction of high-speed railway communication engineering, advanced, mature and scientific inspection and testing measures shall be adopted. The quality inspection data must authentic and reliable and overall reflect the engineering quality. The methods, instruments and equipment adopted shall meet those specified in the relevant technical standards, the instrument performance shall meet the requirements of quality inspection, and the quality inspectors shall possess the specified qualifications. 1.0.12 All the quality inspection reports, inspection and acceptance records and other technical management data for construction of high-speed railway communication engineering shall be timely filled in as required and shall strictly comply with the responsible person signature confirmation system. The filing, reorganization and preservation period constructional quality acceptance data shall meet the requirements of relevant provisions. 1.0.13 The construction and acceptance personnel of high-speed railway communication engineering shall pass necessary training and examination before taking up the post. 1.0.14 In addition to this standard, the constructional quality acceptance of high-speed railway communication engineering shall also comply with those specified in the current relevant standards of the nation. 2 Terms and Abbreviations 2.1 Terms 2.1.1 constructional quality of engineering. summation of all obvious and implied characteristics on aspects such as safety, use function, durability and environmental protection, for reflecting that the engineering construction process or the entity meets those specified in the relevant technical standards or stipulated in the Contract. 2.1.2 acceptance. confirmation, in written form, on whether the engineering quality is acceptable according to relevant standards, upon inspection for quality of inspection lot and subitem, divisional and unit projects by the organizations concerned with construction activities, under the premise that the engineering quality is acceptable upon self-inspection and evaluation of the construction organization. 2.1.3 site acceptance. inspection for materials, members, accessories, equipment, etc. delivered to the construction site according to the requirements of relevant technical standards to confirm whether they are acceptable. 2.1.4 inspection lot. an inspection unit composed of certain samples used for inspection and gathered according to the same production conditions or in required mode. 2.1.5 inspection. activity of conducting measurement, inspection and test for the properties of inspection items and comparing the results and the standard requirements to determine the conformity of all property items. 2.1.6 witness testing. supervisory activity conducted by the engineering supervision organization on the construction organization for material sampling, sample presentation, inspection or testing and test process. 2.1.7 parallel acceptance testing. inspection or testing activity carried out independently by the supervision organization according to certain proportion by using certain inspection or testing means based on the self-inspection of construction organization. 2.1.8 on-site supervision. supervisory activity conducted by supervisors on site during construction of critical part or working procedure of the engineering. 2.1.9 working procedure. operation activity with relative independent characteristics or operation activity divided by necessary technical intermittent and pause during construction, which is the basic unit of construction process. 2.1.10 handing over inspection. activity that the construction undertaking party and completing party jointly carry out inspection and confirm whether the construction can be continued. 2.1.11 dominant item. inspection item playing a decisive role in quality, safety, health, environmental protection and public interest. 2.1.12 general item. inspection item other than the dominant item. 2.1.13 quality of appearance. external quality of engineering reflected by observation and necessary measurement. 2.1.14 repair. measures like renovation for the position failing to meet the standard requirements in the engineering.
Foreword i 1 General Provisions 2 Terms and Abbreviations 2.1 Terms 2.2 Abbreviations 3 Basic Requirements 3.1 General Requirements 3.2 Division of the Constructional Quality Acceptance Units of Engineering. 3.3 Content and Requirements of Constructional Quality Acceptance of Engineering. 3.4 Procedure and Organization of Constructional Quality Acceptance of Engineering. 4 Communication Line 4.2 Laying of Optical Power Cable 4.3 Fiber Cable Connection and Entry 4.4 Power Cable Connection and Entry 4.5 Inspection of Fiber Cable Line Performance 4.6 Performance Inspection of Power Cable Line 4.7 Installation and Wiring of Fiber Monitoring Equipment 4.8 Inspection of Fiber Monitoring System 5 Indoor Equipment and Box-type Machine Room 5.1 General Requirements 5.2 Equipment Installation 5.3 Equipment Wiring 5.4 Installation of Box-type Machine Room 6 Transmission System 6.1 General Requirements 6.2 Installation and Wiring of Transmission Equipment 6.3 Inspection of Single Transmission Equipment 6.4 Inspection of Transmission System 6.5 Network Management Inspection of Transmission System 7 Access Network 7.1 General Requirements 7.2 Installation and Wiring of Access Network Equipment 7.3 Inspection of Single Access Network Equipment 7.4 Inspection of Access Network System 7.5 Network Management Inspection of Access Network System 8 Data Communication System 8.1 General Requirements 8.2 Installation and Wiring of Data Communication Equipment 8.3 Single Data Communication Equipment Inspection 8.4 Inspection of Data Communication System 8.5 Network Management Inspection of Data Communication System 9 Telephone Switching System 9.1 General Requirements 9.2 Installation and Wiring of Telephone Switching Equipment 9.3 Inspection of Telephone Switching System 9.4 Inspection of Telephone Switching System Network Management 10 Digital Dispatching Communication System 10.1 General Requirements 10.2 Installation and Wiring of Digital Dispatch Communication Equipment 10.3 Single Machine Inspection of Digital Dispatch Communication Equipment 10.4 Inspection of Digital Dispatching Communication System 10.5 Inspection of Digital Dispatching Communication System Network Management 11 GSM-R 11.1 General Requirements 11.2 GSM-R System Antenna Mast (Tower) 11.3 Antenna, Feeder and Tower Amplifier of GSM-R System 11.4 GSM-R System Line Construction 11.5 Indoor Equipment Installation and Wiring of GSM-R System 11.6 GSM-R Mobile Switching Subsystem (SSS) 11.7 GSM-R Mobile Intelligent Network Subsystem (IN) 11.8 GSM-R General Packet Radio Service Subsystem (GPRS) 11.9 GSM-R Base Station Subsystem (BSS) 11.10 GSM-R Operation Support System (OSS) 11.11 GSM-R Wireless Terminal 11.12 GSM-R Interface 11.13 GSM-R System Quality Inspection 12 Videoconference System 12.1 General Requirements 12.2 Installation and Wiring of Videoconference System Equipment 12.3 Inspection on Videoconference System 12.4 Network Management Inspection on Videoconference System 13 Integrated Video Monitoring System 13.1 General Requirements 13.2 Installation and Wiring of Integrated Video Monitoring System Equipment 13.3 Single Machine Inspection on Integrated Video Monitoring Equipment 13.4 Inspection on Integrated Video Monitoring System 13.5 Network Management Inspection on Integrated Video Monitoring System 14 Emergency Communication System 14.1 General Requirements 14.2 Equipment Installation and Wiring of Emergency Communication 14.3 Inspection for Emergency Site Access Equipment 14.4 Equipment Inspection for Emergency Communication Center 14.5 Inspection for Emergency Communication System 15 Generic Cabling 15.1 General Requirements 15.2 Installation of Generic Cabling Equipment 15.3 Installation of Protective Pipe Channel for Generic Cabling 15.4 Cable Laying of Generic Cabling 15.5 Generic Cabling System Inspection 16 Digital Synchronization and Time Sharing System 16.1 General Requirements 16.2 Equipment Installation and Wiring 16.3 Digital Synchronization Network Inspection 16.4 Time Synchronization Network Inspection 16.5 Inspection of Time Synchronization Network Management 17 Integrated Network Management System 17.1 General Requirements 17.2 Equipment Installation and Wiring of Integrated Network Management System 17.3 Integrated Network Management System Inspection 18 Environmental Monitoring and Power Supply Supervisory & Control System of Communication Equipment Building 18.1 General Requirements 18.2 Monitoring Equipment Installation and Wiring 18.3 Supervisory & Control System Inspection 19 Power Supply Equipment 19.1 General Requirements 19.2 Power Equipment Installation 19.3 Wiring of Power Supply Equipment 19.4 Earthing Device Installation 19.5 Performance Inspection of Power Supply Equipment 19.6 Inspection of Power Supply Equipment Function 20 Overall Quality Assessment of Unit Project 20.1 General Requirements 20.2 Quality Control Data Examination for Unit Project 20.3 Examination for Quality and Main Functions of Unit Project 20.4 Assessment on Quality of Appearance of Unit Project Annex A Main Technical Indexes of Optical Transmission System Annex B Testing Method for Busy Hour Call Attempts (BHCA) of Telephone Switching System Annex C Subjective Assessment Index System for Image Quality of Integrated Video Monitoring System Explanation of Wording in This Standard List of Quoted Standards
Code of China
Standard
TB 10755-2010  Standard for constructional quality acceptance of high-speed railway communication engineering (English Version)
Standard No.TB 10755-2010
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count52000 words
Price(USD)1700.0
Implemented on2010-12-8
Deliveryvia email in 1 business day
Detail of TB 10755-2010
Standard No.
TB 10755-2010
English Name
Standard for constructional quality acceptance of high-speed railway communication engineering
Chinese Name
高速铁路通信工程施工质量验收标准
Chinese Classification
Professional Classification
TB
ICS Classification
Issued by
Ministry of Railways
Issued on
2010-12-08
Implemented on
2010-12-8
Status
superseded
Superseded by
TB 10755-2018 Standard for Acceptance of Communication Works in High-speed Railway
Superseded on
2019-2-1
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
52000 words
Price(USD)
1700.0
Keywords
TB 10755-2010, TB/T 10755-2010, TBT 10755-2010, TB10755-2010, TB 10755, TB10755, TB/T10755-2010, TB/T 10755, TB/T10755, TBT10755-2010, TBT 10755, TBT10755
Introduction of TB 10755-2010
1 General Provisions 1.0.1 This standard is formulated with a view to strengthening constructional quality management, unifying standard for acceptance and ensuring constructional quality of high-speed railway communication engineering. 1.0.2 This standard is applicable to the constructional quality acceptance of newly-built 250~350km/h high-speed railway communication engineering. The constructional quality acceptance of signaling engineering for passenger dedicated line and inter-city railway in speed less than 250km/h may also refer to this standard. 1.0.3 The construction parties concerned of high-speed railway communication engineering shall establish and improve quality assurance system, conduct whole-process control over the constructional quality of engineering, and implement lifelong quality accountability system to management, technical and operating personnel. 1.0.4 The construction parties concerned of high-speed railway communication engineering shall standardize management system, personnel allocation, site management and process control, and implement construction and management requirements such as quality, safety, construction period, investment returns, environmental protection and technological innovation. 1.0.5 The construction of high-speed railway communication engineering shall fully comply with the national laws and regulations and the relevant technical standards and be in strict accordance with the design documents, the constructional quality shall meet the requirements for use functions, safety and quality performance of system, and the engineering shall be ensured of normal use during the design service life. 1.0.6 Main equipment and apparatuses adopted in high-speed railway communication engineering shall meet those specified in the relevant national and professional standards and admittance for railway industry. 1.0.7 Requirements for constructional quality as stated in the contract documents and engineering technical documents adopted in construction of high-speed railway communication engineering shall not be inferior to those specified in this standard; otherwise, these requirements shall prevail. 1.0.8 During construction of high-speed railway communication engineering, efforts shall be made to implement sustainable development strategy of the national economy, make rational utilization of resources and properly carry out environmental protection and water & soil conservation. 1.0.9 The construction of high-speed railway communication engineering shall comply with the current relevant labor protection laws and regulations of the nation to ensure health of constructors and to avoid or reduce harm. 1.0.10 For the construction of high-speed railway communication engineering, mechanized, industrialized, specialized and informationized construction measures shall be positively adopted. 1.0.11 For the construction of high-speed railway communication engineering, advanced, mature and scientific inspection and testing measures shall be adopted. The quality inspection data must authentic and reliable and overall reflect the engineering quality. The methods, instruments and equipment adopted shall meet those specified in the relevant technical standards, the instrument performance shall meet the requirements of quality inspection, and the quality inspectors shall possess the specified qualifications. 1.0.12 All the quality inspection reports, inspection and acceptance records and other technical management data for construction of high-speed railway communication engineering shall be timely filled in as required and shall strictly comply with the responsible person signature confirmation system. The filing, reorganization and preservation period constructional quality acceptance data shall meet the requirements of relevant provisions. 1.0.13 The construction and acceptance personnel of high-speed railway communication engineering shall pass necessary training and examination before taking up the post. 1.0.14 In addition to this standard, the constructional quality acceptance of high-speed railway communication engineering shall also comply with those specified in the current relevant standards of the nation. 2 Terms and Abbreviations 2.1 Terms 2.1.1 constructional quality of engineering. summation of all obvious and implied characteristics on aspects such as safety, use function, durability and environmental protection, for reflecting that the engineering construction process or the entity meets those specified in the relevant technical standards or stipulated in the Contract. 2.1.2 acceptance. confirmation, in written form, on whether the engineering quality is acceptable according to relevant standards, upon inspection for quality of inspection lot and subitem, divisional and unit projects by the organizations concerned with construction activities, under the premise that the engineering quality is acceptable upon self-inspection and evaluation of the construction organization. 2.1.3 site acceptance. inspection for materials, members, accessories, equipment, etc. delivered to the construction site according to the requirements of relevant technical standards to confirm whether they are acceptable. 2.1.4 inspection lot. an inspection unit composed of certain samples used for inspection and gathered according to the same production conditions or in required mode. 2.1.5 inspection. activity of conducting measurement, inspection and test for the properties of inspection items and comparing the results and the standard requirements to determine the conformity of all property items. 2.1.6 witness testing. supervisory activity conducted by the engineering supervision organization on the construction organization for material sampling, sample presentation, inspection or testing and test process. 2.1.7 parallel acceptance testing. inspection or testing activity carried out independently by the supervision organization according to certain proportion by using certain inspection or testing means based on the self-inspection of construction organization. 2.1.8 on-site supervision. supervisory activity conducted by supervisors on site during construction of critical part or working procedure of the engineering. 2.1.9 working procedure. operation activity with relative independent characteristics or operation activity divided by necessary technical intermittent and pause during construction, which is the basic unit of construction process. 2.1.10 handing over inspection. activity that the construction undertaking party and completing party jointly carry out inspection and confirm whether the construction can be continued. 2.1.11 dominant item. inspection item playing a decisive role in quality, safety, health, environmental protection and public interest. 2.1.12 general item. inspection item other than the dominant item. 2.1.13 quality of appearance. external quality of engineering reflected by observation and necessary measurement. 2.1.14 repair. measures like renovation for the position failing to meet the standard requirements in the engineering.
Contents of TB 10755-2010
Foreword i 1 General Provisions 2 Terms and Abbreviations 2.1 Terms 2.2 Abbreviations 3 Basic Requirements 3.1 General Requirements 3.2 Division of the Constructional Quality Acceptance Units of Engineering. 3.3 Content and Requirements of Constructional Quality Acceptance of Engineering. 3.4 Procedure and Organization of Constructional Quality Acceptance of Engineering. 4 Communication Line 4.2 Laying of Optical Power Cable 4.3 Fiber Cable Connection and Entry 4.4 Power Cable Connection and Entry 4.5 Inspection of Fiber Cable Line Performance 4.6 Performance Inspection of Power Cable Line 4.7 Installation and Wiring of Fiber Monitoring Equipment 4.8 Inspection of Fiber Monitoring System 5 Indoor Equipment and Box-type Machine Room 5.1 General Requirements 5.2 Equipment Installation 5.3 Equipment Wiring 5.4 Installation of Box-type Machine Room 6 Transmission System 6.1 General Requirements 6.2 Installation and Wiring of Transmission Equipment 6.3 Inspection of Single Transmission Equipment 6.4 Inspection of Transmission System 6.5 Network Management Inspection of Transmission System 7 Access Network 7.1 General Requirements 7.2 Installation and Wiring of Access Network Equipment 7.3 Inspection of Single Access Network Equipment 7.4 Inspection of Access Network System 7.5 Network Management Inspection of Access Network System 8 Data Communication System 8.1 General Requirements 8.2 Installation and Wiring of Data Communication Equipment 8.3 Single Data Communication Equipment Inspection 8.4 Inspection of Data Communication System 8.5 Network Management Inspection of Data Communication System 9 Telephone Switching System 9.1 General Requirements 9.2 Installation and Wiring of Telephone Switching Equipment 9.3 Inspection of Telephone Switching System 9.4 Inspection of Telephone Switching System Network Management 10 Digital Dispatching Communication System 10.1 General Requirements 10.2 Installation and Wiring of Digital Dispatch Communication Equipment 10.3 Single Machine Inspection of Digital Dispatch Communication Equipment 10.4 Inspection of Digital Dispatching Communication System 10.5 Inspection of Digital Dispatching Communication System Network Management 11 GSM-R 11.1 General Requirements 11.2 GSM-R System Antenna Mast (Tower) 11.3 Antenna, Feeder and Tower Amplifier of GSM-R System 11.4 GSM-R System Line Construction 11.5 Indoor Equipment Installation and Wiring of GSM-R System 11.6 GSM-R Mobile Switching Subsystem (SSS) 11.7 GSM-R Mobile Intelligent Network Subsystem (IN) 11.8 GSM-R General Packet Radio Service Subsystem (GPRS) 11.9 GSM-R Base Station Subsystem (BSS) 11.10 GSM-R Operation Support System (OSS) 11.11 GSM-R Wireless Terminal 11.12 GSM-R Interface 11.13 GSM-R System Quality Inspection 12 Videoconference System 12.1 General Requirements 12.2 Installation and Wiring of Videoconference System Equipment 12.3 Inspection on Videoconference System 12.4 Network Management Inspection on Videoconference System 13 Integrated Video Monitoring System 13.1 General Requirements 13.2 Installation and Wiring of Integrated Video Monitoring System Equipment 13.3 Single Machine Inspection on Integrated Video Monitoring Equipment 13.4 Inspection on Integrated Video Monitoring System 13.5 Network Management Inspection on Integrated Video Monitoring System 14 Emergency Communication System 14.1 General Requirements 14.2 Equipment Installation and Wiring of Emergency Communication 14.3 Inspection for Emergency Site Access Equipment 14.4 Equipment Inspection for Emergency Communication Center 14.5 Inspection for Emergency Communication System 15 Generic Cabling 15.1 General Requirements 15.2 Installation of Generic Cabling Equipment 15.3 Installation of Protective Pipe Channel for Generic Cabling 15.4 Cable Laying of Generic Cabling 15.5 Generic Cabling System Inspection 16 Digital Synchronization and Time Sharing System 16.1 General Requirements 16.2 Equipment Installation and Wiring 16.3 Digital Synchronization Network Inspection 16.4 Time Synchronization Network Inspection 16.5 Inspection of Time Synchronization Network Management 17 Integrated Network Management System 17.1 General Requirements 17.2 Equipment Installation and Wiring of Integrated Network Management System 17.3 Integrated Network Management System Inspection 18 Environmental Monitoring and Power Supply Supervisory & Control System of Communication Equipment Building 18.1 General Requirements 18.2 Monitoring Equipment Installation and Wiring 18.3 Supervisory & Control System Inspection 19 Power Supply Equipment 19.1 General Requirements 19.2 Power Equipment Installation 19.3 Wiring of Power Supply Equipment 19.4 Earthing Device Installation 19.5 Performance Inspection of Power Supply Equipment 19.6 Inspection of Power Supply Equipment Function 20 Overall Quality Assessment of Unit Project 20.1 General Requirements 20.2 Quality Control Data Examination for Unit Project 20.3 Examination for Quality and Main Functions of Unit Project 20.4 Assessment on Quality of Appearance of Unit Project Annex A Main Technical Indexes of Optical Transmission System Annex B Testing Method for Busy Hour Call Attempts (BHCA) of Telephone Switching System Annex C Subjective Assessment Index System for Image Quality of Integrated Video Monitoring System Explanation of Wording in This Standard List of Quoted Standards
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
TB 10755-2010, TB/T 10755-2010, TBT 10755-2010, TB10755-2010, TB 10755, TB10755, TB/T10755-2010, TB/T 10755, TB/T10755, TBT10755-2010, TBT 10755, TBT10755