2025-7-11 18.97.14.80
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/DL/T 5142-2012
DL/T 5142-2012   Code for designing ash handling system of power plant (English Version)
Standard No.: DL/T 5142-2012 Status:valid remind me the status change

Email:

Language:English File Format:PDF
Word Count: 26000 words Price(USD):420.0 remind me the price change

Email:

Implemented on:2012-12-1 Delivery: via email in 1 business day
,,
Standard No.: DL/T 5142-2012
English Name: Code for designing ash handling system of power plant
Chinese Name: 火力发电厂除灰设计技术规程
Chinese Classification: P60    Electric power engineering in general
Professional Classification: DL    Professional Standard - Electricity
Issued by: NEA
Issued on: 2012-8-23
Implemented on: 2012-12-1
Status: valid
Superseding:DL/T 5142-2002 Code for Designing Ash Handling System of Power Plant
Language: English
File Format: PDF
Word Count: 26000 words
Price(USD): 420.0
Delivery: via email in 1 business day
1.0.1 This code is formulated with a view to ensuring conformity of the ash handling design of fossil-fired power plant with the requirements of safety, reliability, advanced technology, economy and suitability, unifying and defining the construction standards, actively utilizing the advanced technologies, processes, materials and equipment proven through operation practice or industrial test. 1.0.2 This code is applicable to the ash handling design of solid fossil fuel power plant, municipal solid waste incineration power plant and straw power plant. 1.0.3 The ash handling design of fossil-fired power plant shall meet the relevant requirements of the current national standards "Code for Design of Large and Medium Fossil Fired Power Plants" (GB 50660) and "Code for Design of Small Fossil Fired Power Plant" (GB 50049). 1.0.4 The ash handling design shall create conditions for comprehensive utilization of ash. 1.0.5 The ash handling system shall be planned uniformly according to the construction scale of power plant and constructed by stages according to the construction schedule of unit. If construction by stages is unreasonable upon technical and economical comparison, it may be built-up at a time. 1.0.6 The ash handling system may adopt pneumatic, mechanical and hydraulic conveying systems or a combined system and should meet the following requirements: 1 Slag handling by dry bottom furnace should adopt mechanical slag handling system, fly ash handling by pulverized coal fired boiler should adopt pneumatic ash handling system and mill reject handling by medium speed coal mill should adopt simple mechanical conveying system. Where the conditions are suitable, other types of conveying systems may also be adopted. 2 Where dry ash storage yard is adopted, the off-site conveying system of ash, mill reject and gypsum should adopt automobile transportation. 3 Where wet ash storage yard is adopted, the off-site conveying system of ash should adopt hydraulic pipeline conveying. 1.0.7 The design capacity of off-site ash handling system shall be determined according to the specific engineering conditions and the implementation conditions of comprehensive utilization of ash. 1.0.8 The ash handling system shall be designed according to the ash discharge amount of boiler when it fires the design fuel at the working condition of maximum continuous evaporation, be checked according to the ash discharge amount of boiler when it fires the check fuel and be left with certain allowance. 1.0.9 The ash amount discharged from each part of boiler shall be calculated according to the method given in Appendix A of this code. The ash and slag ratio shall adopt the data provided by the boiler factory, and if the data is unavailable, the ash and slag ratio may adopt the value given in Table A.0.3 in the Appendix A of this code. The mill reject amount discharged by the medium speed coal mill should be calculated according to the method given in Appendix B of this code. 1.0.10 Mature operation practice experience of engineering with similar conditions shall be provided for the design of pneumatic conveying system and auxiliary storage facilities; where mature operation practice experience is unavailable, test, study and technical demonstration on the basis characteristics as well as the conveying and storage characteristics of materials shall be carried out. Where the material density data is unavailable, values may be taken according to the requirements of Appendix C of this code. 1.0.11 Necessary overhaul lifting facility shall be installed at the centralized layout place of ash handling equipment, and shall meet the following requirements: 1 The rated lifting capacity of lifting facility shall be determined according to the heaviest overhaul lifting component; the installation elevation of lifting facility shall be determined according to the lifting height of the required lifting equipment. 2 The overhaul lifting facility shall be selected in accordance with the following requirements: 1) Repair and lifting facilities shall be arranged for equipment with lifting capacity of 1t or above, pipe fittings and valve required for repair; 2) Electric lifting facilities should be arranged for frequently used equipment with lifting capacity of 3t or above; 3) Electric lifting facilities shall be arranged for equipment with lifting capacity of 10t or above; 4) Where it is inconvenient to arrange fixed maintenance and repair platform, mobile lifting facilities may be arranged; 5) Movable or fixed lifting facilities may be arranged for equipment outdoors according to surrounding conditions. 1.0.12 Necessary cleaning facilities shall be arranged at the centralized layout place of ash handling equipment and the buildings or structures with ash handling system, and dust-proof and suppression measures shall be adopted at the loading and unloading places. 1.0.13 The water and gas pipeline design of ash handling system shall meet the requirements of the current professional standards "Code for Design of Thermal Power Plant Steam/Water Piping" (DL/T 5054) and "Code for Oil/Gas Piping Design of Fossil Fuel Power Plant" (DL/T 5204), and the two phase pipeline design of ash handling system may be implemented by reference to the standards. 1.0.14 The design of ash handling system and ancillary facilities shall meet the requirements of the current professional standards "Design Code for Occupational Safety of Fossil-fired Power Plant" (DL 5053), ""Design Code for Occupational Health of Fossil-fired Power Plant" (DL 5454) and "Code for Designing Insulation and Painting of Fossil Fuel Power Plant" (DL/T 5072).
1 General Provisions 2 Terms 3 Pneumatic Ash Handling System 3.1 Basic Requirement 3.2 Positive Pressure Pneumatic Conveying 3.3 Negative Pressure Pneumatic Conveying 3.4 Pneumatic Ash Conveying Pipeline 3.5 Air Slide 3.6 Dry Ash Classifying System 4 Hydraulic Ash Handling System 4.1 Basic Requirement 4.2 Water Supply for Ash Handling System 4.3 Hydraulic Jet Pump 4.4 Ash Trench 4.5 Ash Slurrying Facilities 4.6 Centrifugal Ash Slurry Pump 4.7 Plunger Ash Slurry Pump 4.8 Dewatering Bin and Settling Facilities 4.9 Slag Settling Pond 4.10 Hydraulic Ash Conveying Pipeline 5 Mechanical Ash Handling System 5.1 Basic Requirement 5.2 Air-cooled Type Slag Conveyor 5.3 Submerged Scraper Conveyor 5.4 En-masse Conveyor 5.5 Vertical Bucket Elevator 5.6 Bucket Conveyor 6 Mill Reject Conveying System 6.1 Basic Requirement 6.2 Simple Mechanical Conveying 6.3 Hydraulic Jet Pump Conveying 6.4 Mechanical Conveying 7 Compressed Air Supply System 7.1 Basic Requirement 7.2 Air Compressor and Treatment Facilities of Compressed Air 7.3 Rotary Blower and Vacuum Pump 8 Material Storage and Unloading System 8.1 Basic Requirement 8.2 Ash Silo and Ash Hopper 8.3 Slag Bin and Mill Reject Bin 8.4 Unloading System and Equipment Selection 9 Off-site Conveying System 9.1 Basic Requirement 9.2 Automobile Transportation 9.3 Belt Conveyor 9.4 Ship Transportation 10 Ash Handling System for CFB Boiler 10.1 Basic Requirement 10.2 Slag Handling System 10.3 Limestone Powder Handling System 11 Ash Handling System for Municipal Solid Waste Incineration Power Plant 11.1 Basic Requirement 11.2 Slag Handling System 11.3 Ash Handling System 12 Ash Handling System for Straw Power Plant 12.1 Basic Requirement 12.2 Mechanical Ash Handling System 12.3 Pneumatic Ash Handling System 12.4 Ash Storage 13 Slime Pipelines Conveying System 13.1 Basic Requirement 13.2 Slime Pipelines Conveying 13.3 Equipment Selection 13.4 Slime Pump House 14 Design Requirements for Relevant Specialties 14.1 Boiler and Auxiliaries 14.2 I&C and Electrical 14.3 Civil Engineering and Hydro-structure 14.4 Hydraulic and Chemical 14.5 Heating and Ventilating 14.6 General Plan Transportation Appendix A Calculation of Ash Amount Appendix B Calculation of Mill Rejects Amount Appendix C Density Lists of Material Appendix D Calculation of Reynolds Number Explanation of Wording in this Code List of Quoted Standards
Referred in DL/T 5142-2012:
* GB 50660-2011 Code for Designing large and Middle Fossil Fuel Power Plant
* GB 50049-2011 Code for design of small fossil fired power plant
* GB 5085.3-2007 Identification standards for hazardous wastes - Identification for extraction toxicity
* GB 16889-2008 Standard for Pollution Control on the Landfill Site of Municipal Solid Waste
* GB/T 17119-1997 Continuous mechanical handling equipment - Belt conveyors with carrying idlers - Calculation of operating power and tensile forces
* GB 150-2011 Pressure Vessels (Collection GB150.1~150.4-2011)
* DL/T 741-2010 Operating code for overhead transmission line
* DL/T 5032-2005 Technical Code of General Plan Transportation Design for Fossil Fu
* DL 5053-2012 Code for the design of occupational safety in fossil-fired power plant
* DL/T 5054-1996 Technical Specification for the Steam/Water Piping Design of Foss
* DL/T 5072-2007 Code for designing insulation and painting of fossil fuel power plant
* DL/T 5204-2005 Code for Oil/gas Piping Design of Fossil Fuel Power Plant
* DL 5454-2012 Code for the design of occupation health in fossil-fired power plant
* JB/T 8096-2013 Centrifugal Slurry Pumps
Code of China
Standard
DL/T 5142-2012  Code for designing ash handling system of power plant (English Version)
Standard No.DL/T 5142-2012
Statusvalid
LanguageEnglish
File FormatPDF
Word Count26000 words
Price(USD)420.0
Implemented on2012-12-1
Deliveryvia email in 1 business day
Detail of DL/T 5142-2012
Standard No.
DL/T 5142-2012
English Name
Code for designing ash handling system of power plant
Chinese Name
火力发电厂除灰设计技术规程
Chinese Classification
P60
Professional Classification
DL
ICS Classification
Issued by
NEA
Issued on
2012-8-23
Implemented on
2012-12-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
DL/T 5142-2002 Code for Designing Ash Handling System of Power Plant
Language
English
File Format
PDF
Word Count
26000 words
Price(USD)
420.0
Keywords
DL/T 5142-2012, DL 5142-2012, DLT 5142-2012, DL/T5142-2012, DL/T 5142, DL/T5142, DL5142-2012, DL 5142, DL5142, DLT5142-2012, DLT 5142, DLT5142
Introduction of DL/T 5142-2012
1.0.1 This code is formulated with a view to ensuring conformity of the ash handling design of fossil-fired power plant with the requirements of safety, reliability, advanced technology, economy and suitability, unifying and defining the construction standards, actively utilizing the advanced technologies, processes, materials and equipment proven through operation practice or industrial test. 1.0.2 This code is applicable to the ash handling design of solid fossil fuel power plant, municipal solid waste incineration power plant and straw power plant. 1.0.3 The ash handling design of fossil-fired power plant shall meet the relevant requirements of the current national standards "Code for Design of Large and Medium Fossil Fired Power Plants" (GB 50660) and "Code for Design of Small Fossil Fired Power Plant" (GB 50049). 1.0.4 The ash handling design shall create conditions for comprehensive utilization of ash. 1.0.5 The ash handling system shall be planned uniformly according to the construction scale of power plant and constructed by stages according to the construction schedule of unit. If construction by stages is unreasonable upon technical and economical comparison, it may be built-up at a time. 1.0.6 The ash handling system may adopt pneumatic, mechanical and hydraulic conveying systems or a combined system and should meet the following requirements: 1 Slag handling by dry bottom furnace should adopt mechanical slag handling system, fly ash handling by pulverized coal fired boiler should adopt pneumatic ash handling system and mill reject handling by medium speed coal mill should adopt simple mechanical conveying system. Where the conditions are suitable, other types of conveying systems may also be adopted. 2 Where dry ash storage yard is adopted, the off-site conveying system of ash, mill reject and gypsum should adopt automobile transportation. 3 Where wet ash storage yard is adopted, the off-site conveying system of ash should adopt hydraulic pipeline conveying. 1.0.7 The design capacity of off-site ash handling system shall be determined according to the specific engineering conditions and the implementation conditions of comprehensive utilization of ash. 1.0.8 The ash handling system shall be designed according to the ash discharge amount of boiler when it fires the design fuel at the working condition of maximum continuous evaporation, be checked according to the ash discharge amount of boiler when it fires the check fuel and be left with certain allowance. 1.0.9 The ash amount discharged from each part of boiler shall be calculated according to the method given in Appendix A of this code. The ash and slag ratio shall adopt the data provided by the boiler factory, and if the data is unavailable, the ash and slag ratio may adopt the value given in Table A.0.3 in the Appendix A of this code. The mill reject amount discharged by the medium speed coal mill should be calculated according to the method given in Appendix B of this code. 1.0.10 Mature operation practice experience of engineering with similar conditions shall be provided for the design of pneumatic conveying system and auxiliary storage facilities; where mature operation practice experience is unavailable, test, study and technical demonstration on the basis characteristics as well as the conveying and storage characteristics of materials shall be carried out. Where the material density data is unavailable, values may be taken according to the requirements of Appendix C of this code. 1.0.11 Necessary overhaul lifting facility shall be installed at the centralized layout place of ash handling equipment, and shall meet the following requirements: 1 The rated lifting capacity of lifting facility shall be determined according to the heaviest overhaul lifting component; the installation elevation of lifting facility shall be determined according to the lifting height of the required lifting equipment. 2 The overhaul lifting facility shall be selected in accordance with the following requirements: 1) Repair and lifting facilities shall be arranged for equipment with lifting capacity of 1t or above, pipe fittings and valve required for repair; 2) Electric lifting facilities should be arranged for frequently used equipment with lifting capacity of 3t or above; 3) Electric lifting facilities shall be arranged for equipment with lifting capacity of 10t or above; 4) Where it is inconvenient to arrange fixed maintenance and repair platform, mobile lifting facilities may be arranged; 5) Movable or fixed lifting facilities may be arranged for equipment outdoors according to surrounding conditions. 1.0.12 Necessary cleaning facilities shall be arranged at the centralized layout place of ash handling equipment and the buildings or structures with ash handling system, and dust-proof and suppression measures shall be adopted at the loading and unloading places. 1.0.13 The water and gas pipeline design of ash handling system shall meet the requirements of the current professional standards "Code for Design of Thermal Power Plant Steam/Water Piping" (DL/T 5054) and "Code for Oil/Gas Piping Design of Fossil Fuel Power Plant" (DL/T 5204), and the two phase pipeline design of ash handling system may be implemented by reference to the standards. 1.0.14 The design of ash handling system and ancillary facilities shall meet the requirements of the current professional standards "Design Code for Occupational Safety of Fossil-fired Power Plant" (DL 5053), ""Design Code for Occupational Health of Fossil-fired Power Plant" (DL 5454) and "Code for Designing Insulation and Painting of Fossil Fuel Power Plant" (DL/T 5072).
Contents of DL/T 5142-2012
1 General Provisions 2 Terms 3 Pneumatic Ash Handling System 3.1 Basic Requirement 3.2 Positive Pressure Pneumatic Conveying 3.3 Negative Pressure Pneumatic Conveying 3.4 Pneumatic Ash Conveying Pipeline 3.5 Air Slide 3.6 Dry Ash Classifying System 4 Hydraulic Ash Handling System 4.1 Basic Requirement 4.2 Water Supply for Ash Handling System 4.3 Hydraulic Jet Pump 4.4 Ash Trench 4.5 Ash Slurrying Facilities 4.6 Centrifugal Ash Slurry Pump 4.7 Plunger Ash Slurry Pump 4.8 Dewatering Bin and Settling Facilities 4.9 Slag Settling Pond 4.10 Hydraulic Ash Conveying Pipeline 5 Mechanical Ash Handling System 5.1 Basic Requirement 5.2 Air-cooled Type Slag Conveyor 5.3 Submerged Scraper Conveyor 5.4 En-masse Conveyor 5.5 Vertical Bucket Elevator 5.6 Bucket Conveyor 6 Mill Reject Conveying System 6.1 Basic Requirement 6.2 Simple Mechanical Conveying 6.3 Hydraulic Jet Pump Conveying 6.4 Mechanical Conveying 7 Compressed Air Supply System 7.1 Basic Requirement 7.2 Air Compressor and Treatment Facilities of Compressed Air 7.3 Rotary Blower and Vacuum Pump 8 Material Storage and Unloading System 8.1 Basic Requirement 8.2 Ash Silo and Ash Hopper 8.3 Slag Bin and Mill Reject Bin 8.4 Unloading System and Equipment Selection 9 Off-site Conveying System 9.1 Basic Requirement 9.2 Automobile Transportation 9.3 Belt Conveyor 9.4 Ship Transportation 10 Ash Handling System for CFB Boiler 10.1 Basic Requirement 10.2 Slag Handling System 10.3 Limestone Powder Handling System 11 Ash Handling System for Municipal Solid Waste Incineration Power Plant 11.1 Basic Requirement 11.2 Slag Handling System 11.3 Ash Handling System 12 Ash Handling System for Straw Power Plant 12.1 Basic Requirement 12.2 Mechanical Ash Handling System 12.3 Pneumatic Ash Handling System 12.4 Ash Storage 13 Slime Pipelines Conveying System 13.1 Basic Requirement 13.2 Slime Pipelines Conveying 13.3 Equipment Selection 13.4 Slime Pump House 14 Design Requirements for Relevant Specialties 14.1 Boiler and Auxiliaries 14.2 I&C and Electrical 14.3 Civil Engineering and Hydro-structure 14.4 Hydraulic and Chemical 14.5 Heating and Ventilating 14.6 General Plan Transportation Appendix A Calculation of Ash Amount Appendix B Calculation of Mill Rejects Amount Appendix C Density Lists of Material Appendix D Calculation of Reynolds Number Explanation of Wording in this Code List of Quoted Standards
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: TransForyou Co., Ltd. 2008-2040
 
 
Keywords:
DL/T 5142-2012, DL 5142-2012, DLT 5142-2012, DL/T5142-2012, DL/T 5142, DL/T5142, DL5142-2012, DL 5142, DL5142, DLT5142-2012, DLT 5142, DLT5142