2025-12-16 216.73.216.89
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/DL/T 5153-2002
DL/T 5153-2002   Technical rule for designing auxiliary power system of fossil fuel power plants (English Version)
Standard No.: DL/T 5153-2002 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 56000 words Translation Price(USD):530.0 remind me the price change

Email:

Implemented on:2002-9-1 Delivery: via email in 1~5 business day

→ → →

,2015-3-1,2002-9-1,141137385575327C3BE0B483B977D
Standard No.: DL/T 5153-2002
English Name: Technical rule for designing auxiliary power system of fossil fuel power plants
Chinese Name: 火力发电厂厂用电设计技术规定
Chinese Classification: P61    Power station engineering
Professional Classification: DL    Professional Standard - Electricity
Source Content Issued by: NDRC
Issued on: 2002-04-27
Implemented on: 2002-9-1
Status: superseded
Superseded by:DL/T 5153-2014 Technical Rules for Designing Auxiliary Power System of Fossil Fuel Power Plants
Superseded on:2015-3-1
Superseding:SDGJ 17-1988
Target Language: English
File Format: PDF
Word Count: 56000 words
Translation Price(USD): 530.0
Delivery: via email in 1~5 business day
1.0.1 This Rule is suitable for the newly-built or expanded condensing power station with 125MW steam turbine generators capacity or above, it is also suitable for the design of the thermal plants with 50MW and above heat supply type units. The design of power plant reconstruction project with installing forementioned units and design of power plant adopting cleaning electric power generation can refer to use. 1.0.2 Foreign projects will take the country of supply party or buyer into consideration. This Rule is referred to in combination with the physical circumstance of the project.
1 Scope 2. Normative Refernces 3 General principles 4 Auxiliary Power Connection 4.1 Auxiliary power voltage 4.2 The earthing mode for auxiliary power system neutral point 4.3 The mode of connection for auxiliary power bus bar 4.4 Auxiliary power operation power supply 4.5 Auxiliary power standby, start/standby power supply 4.6 AC security power supply and uninterrupted power supply (UPS) 4.7 The auxiliary power supply load connection and power supply mode 4.8 Low voltage repair supply network 5. The auxiliary transformer and reactor selection and voltage verification at the time of motor starting 5.1 Load calculation 5.2 Capacity selection 5.3 Voltage regulation 5.4 The voltage verification at the time of motor normal starting 5.5 The auxiliary power bus bar voltage verification at the time of grouping motor self-starting 5.6 Impedance selection 6 Auxiliary Power Motor 6.1 Type selection 6.2 The voltage selection and capacity verification 7. Short-circuit Current Calculation and Selection of Electric Appliance and Conductor 7.1 The high-voltage auxiliary power system short-circuit current calculation 7.2 High-voltage auxiliary power equipment type selection 7.3 Low-voltage auxiliary power system short-circuit current calculation 7.4 Low-voltage apparatus selection 7.5 Low-voltage apparatus combination 8 Auxiliary Electric Equipment Collocation 8.1 Auxiliary switchgear collocation 8.2 The auxiliary transformer and miscellaneous auxiliary electric equipment collocation 8.3 Requirements for buildings 8.4 Requirements for ventilation 9 Auxiliary Power Relaying Protection Device 9.1 General requirements for auxiliary power relay protection 9.2 Single-phase earthing protection for neutral point non- direct earthing auxiliary power system 9.3 Auxiliary power working and standby reactor return circuit protection 9.4 High-voltage auxiliary transformer protection 9.5 Low-voltage auxiliary transformer protection 9.6 High-voltage auxiliary power motor protection 9.7 Low-voltage auxiliary motor protection 9.8 Auxiliary circuit protection 9.9 Diesel generator protection 10 Auxiliary Power Control, Signal, Measure and Automatic Device 10.1 Auxiliary power control and signal 10.2 Auxiliary electric equipment measuring instrument 10.3 Auxiliary power automatic device 10.4 Diesel generator control, signal, measure and automatic device Annex A (Informative) Estimation Method for Fossil Fuel Power Plants Auxiliary Power Consumption Rate (Approximate Calculation) Annex B (Informative) SN Common Auxiliary Power Load Characteristics Annex C (Informative) The High-voltage Auxiliary Power System Neutral Point Earthing Equipment Selection Annex D (Informative) Diesel Generator Units Selection Annex E (Informative) Pulverized Coal Delivery Distribution Box Power Automatic Switching Connection (See Figure E1) Annex F (Informative) Repair Distribution Box Installing Place and Quantity Annex G (Informative) Auxiliary Power Load Calculation Annex H (Normative) Auxiliary Power Voltage Regulation Calculation Annex J (Normative) The Voltage Calculation at the Time of Motor Normal Starting Annex K (Normative) The Auxiliary Power Bus-bar Voltage Verification at the Time of Grouping Motor Self-starting Annex L (Informative) Starting Temperature Rise Calculation of Motor Annex M (Informative) Calculation of Short-circuit Current in High-voltage Auxiliary Power System Annex N (Informative) Practical Method for Calculation of Short-circuit Current of 380V Power Center Annex P (Normative) Calculation Curve of Short-circuit Current in 380V System Annex Q (Normative) Selection of Fuse Cutout and Breaker Annex R (Informative) Combination Table of 380V Low-voltage Equipment Annex S (Informative) Calculation of Continuous Working Current in 380V Power Supply Circuit Annex T (Normative) Measuring Instrument of Auxiliary Electric Equipment Annex U (Normative) Wording Explanation
Referred in DL/T 5153-2002:
*GB 14285-1993 Technical Code for Relaying Protection and Security Automatic Equipme
*GB 50052-1995 Code for design of electric power supply systems
*GB 50054-1995 Code for Design of Low-voltage Electrical Distribution System
*GB 50060-1992 Design code for high voltage electrical installation(3~110kv)
*GB 50062-1992 Design code for relaying protection and automatic device of electric power installation
*DL 5000-2000 Technical code for designing fossil fuel power plants
*SDJ 5-1985
*DL/T 5137-2001 Technical code for designing electrical measuring and energy metering device
*DL/T 5136-2001 Technical Code for Designing of Electrical Secondary Wiring in Fossil Fuel Power Plants and Substations
Code of China
Standard
DL/T 5153-2002  Technical rule for designing auxiliary power system of fossil fuel power plants (English Version)
Standard No.DL/T 5153-2002
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count56000 words
Price(USD)530.0
Implemented on2002-9-1
Deliveryvia email in 1~5 business day
Detail of DL/T 5153-2002
Standard No.
DL/T 5153-2002
English Name
Technical rule for designing auxiliary power system of fossil fuel power plants
Chinese Name
火力发电厂厂用电设计技术规定
Chinese Classification
P61
Professional Classification
DL
ICS Classification
Issued by
NDRC
Issued on
2002-04-27
Implemented on
2002-9-1
Status
superseded
Superseded by
DL/T 5153-2014 Technical Rules for Designing Auxiliary Power System of Fossil Fuel Power Plants
Superseded on
2015-3-1
Abolished on
Superseding
SDGJ 17-1988
Language
English
File Format
PDF
Word Count
56000 words
Price(USD)
530.0
Keywords
DL/T 5153-2002, DL 5153-2002, DLT 5153-2002, DL/T5153-2002, DL/T 5153, DL/T5153, DL5153-2002, DL 5153, DL5153, DLT5153-2002, DLT 5153, DLT5153
Introduction of DL/T 5153-2002
1.0.1 This Rule is suitable for the newly-built or expanded condensing power station with 125MW steam turbine generators capacity or above, it is also suitable for the design of the thermal plants with 50MW and above heat supply type units. The design of power plant reconstruction project with installing forementioned units and design of power plant adopting cleaning electric power generation can refer to use. 1.0.2 Foreign projects will take the country of supply party or buyer into consideration. This Rule is referred to in combination with the physical circumstance of the project.
Contents of DL/T 5153-2002
1 Scope 2. Normative Refernces 3 General principles 4 Auxiliary Power Connection 4.1 Auxiliary power voltage 4.2 The earthing mode for auxiliary power system neutral point 4.3 The mode of connection for auxiliary power bus bar 4.4 Auxiliary power operation power supply 4.5 Auxiliary power standby, start/standby power supply 4.6 AC security power supply and uninterrupted power supply (UPS) 4.7 The auxiliary power supply load connection and power supply mode 4.8 Low voltage repair supply network 5. The auxiliary transformer and reactor selection and voltage verification at the time of motor starting 5.1 Load calculation 5.2 Capacity selection 5.3 Voltage regulation 5.4 The voltage verification at the time of motor normal starting 5.5 The auxiliary power bus bar voltage verification at the time of grouping motor self-starting 5.6 Impedance selection 6 Auxiliary Power Motor 6.1 Type selection 6.2 The voltage selection and capacity verification 7. Short-circuit Current Calculation and Selection of Electric Appliance and Conductor 7.1 The high-voltage auxiliary power system short-circuit current calculation 7.2 High-voltage auxiliary power equipment type selection 7.3 Low-voltage auxiliary power system short-circuit current calculation 7.4 Low-voltage apparatus selection 7.5 Low-voltage apparatus combination 8 Auxiliary Electric Equipment Collocation 8.1 Auxiliary switchgear collocation 8.2 The auxiliary transformer and miscellaneous auxiliary electric equipment collocation 8.3 Requirements for buildings 8.4 Requirements for ventilation 9 Auxiliary Power Relaying Protection Device 9.1 General requirements for auxiliary power relay protection 9.2 Single-phase earthing protection for neutral point non- direct earthing auxiliary power system 9.3 Auxiliary power working and standby reactor return circuit protection 9.4 High-voltage auxiliary transformer protection 9.5 Low-voltage auxiliary transformer protection 9.6 High-voltage auxiliary power motor protection 9.7 Low-voltage auxiliary motor protection 9.8 Auxiliary circuit protection 9.9 Diesel generator protection 10 Auxiliary Power Control, Signal, Measure and Automatic Device 10.1 Auxiliary power control and signal 10.2 Auxiliary electric equipment measuring instrument 10.3 Auxiliary power automatic device 10.4 Diesel generator control, signal, measure and automatic device Annex A (Informative) Estimation Method for Fossil Fuel Power Plants Auxiliary Power Consumption Rate (Approximate Calculation) Annex B (Informative) SN Common Auxiliary Power Load Characteristics Annex C (Informative) The High-voltage Auxiliary Power System Neutral Point Earthing Equipment Selection Annex D (Informative) Diesel Generator Units Selection Annex E (Informative) Pulverized Coal Delivery Distribution Box Power Automatic Switching Connection (See Figure E1) Annex F (Informative) Repair Distribution Box Installing Place and Quantity Annex G (Informative) Auxiliary Power Load Calculation Annex H (Normative) Auxiliary Power Voltage Regulation Calculation Annex J (Normative) The Voltage Calculation at the Time of Motor Normal Starting Annex K (Normative) The Auxiliary Power Bus-bar Voltage Verification at the Time of Grouping Motor Self-starting Annex L (Informative) Starting Temperature Rise Calculation of Motor Annex M (Informative) Calculation of Short-circuit Current in High-voltage Auxiliary Power System Annex N (Informative) Practical Method for Calculation of Short-circuit Current of 380V Power Center Annex P (Normative) Calculation Curve of Short-circuit Current in 380V System Annex Q (Normative) Selection of Fuse Cutout and Breaker Annex R (Informative) Combination Table of 380V Low-voltage Equipment Annex S (Informative) Calculation of Continuous Working Current in 380V Power Supply Circuit Annex T (Normative) Measuring Instrument of Auxiliary Electric Equipment Annex U (Normative) Wording Explanation
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
DL/T 5153-2002, DL 5153-2002, DLT 5153-2002, DL/T5153-2002, DL/T 5153, DL/T5153, DL5153-2002, DL 5153, DL5153, DLT5153-2002, DLT 5153, DLT5153