DL/T 889-2015   Guideline for Chemistry Supervision of Thermal Equipments during Power Station Capital Comstriction (English Version)
Standard No.: DL/T 889-2015 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 8000 words Translation Price(USD):240.0 remind me the price change

Email:

Implemented on:2015-12-1 Delivery: via email in 1 business day

→ → →

,,2015-12-1,E0BB867AF1B377D71437117420730
Standard No.: DL/T 889-2015
English Name: Guideline for Chemistry Supervision of Thermal Equipments during Power Station Capital Comstriction
Chinese Name: 电力基本建设热力设备化学监督导则
Professional Classification: DL    Professional Standard - Electricity
Source Content Issued by: NEA
Issued on: 2015-7-1
Implemented on: 2015-12-1
Status: valid
Superseding:DL/T 889-2004 Guide of chemistry supervision of thermal equipments for power station capital construction
Target Language: English
File Format: PDF
Word Count: 8000 words
Translation Price(USD): 240.0
Delivery: via email in 1 business day
1 Scope This standard specifies the content and technical requirements of chemical supervision in the basic construction stage of power generation and thermal equipment. This standard is applicable to units with rated pressure of 12.7 MPa and above for thermal equipment in thermal power plants. Units with rated pressure lower than 12.7 MPa may be implemented with reference. 2 Normative references The following referenced documents are indispensable for the application of this standard. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced documents (including any amendment) applies. GB/T 7596 In-service quality criteria of turbine oils used in power plants GB 8978 Integrated wastewater discharge standard GB 12145 Quality criterion of water and steam for power plant and steam-generating equipment GB/T 14541 Guide for maintenance and supervision of in-service mineral turbine oil used for power plants DL/T 246 Guideline of chemical supervision DL/T 300-2011 Guideline for anti-corrosion and anti-fouling of condenser tube in power plant DL/T 561 Guide for chemical supervision of water and steam in thermal power plant DL/T 571 Guide for acceptance, in-service supervision and maintenance management of fire-resistant fluid used in power plants DL/T 712 Guideline for the selection of condenser tube materials in power plant DL/T 794 Guideline for chemical cleaning of fossil plant DL/T 801 Requirements for internal cooling water quality and it's system in large generators DL/T 855 The code for maintenance and safe keeping of thermal power equipment in electric power construction DL/T 912 Quality criterion of water and steam for supercritical pressure units in fossil fuel power plant DL/T 956 Guideline for lay-up of thermal power equipment in fossil plants DL 5190.3 Technical specification for thermal power erection and construction — Part 3: steam turbine generator unit DL 5190.5 Technical specification for thermal power erection and construction — Part 5: Piping and system 3 General 3.1 The chemical supervision of thermal equipment in thermal power plants in the capital construction stage shall meet the general requirements of DL/T 246 for chemical supervision of thermal power plants. 3.2 The chemical supervision of thermal equipment in thermal power plants in the capital construction stage shall be organized by the owner or the unit entrusted by the owner, with the participation of the owner unit, the construction unit, the supervision unit, the commissioning unit and other units. 3.3 The owner unit shall participate in the quality acceptance of important projects such as boiler hydraulic test, boiler chemical cleaning, steam pipe blowing, unit trial operation and 168 h complete trial operation. All supervision tasks shall be included in the project schedule, and their implementation shall be taken as one of the bases for assessing and evaluating the project quality. 3.4 The owner unit is responsible for organizing the collection and collation of chemical technical supervision and inspection reports in the capital construction stage of thermal equipment, and archiving them as the basic data of the unit.
Foreword i 1 Scope 2 Normative references 3 General 4 Ex-factory inspection and requirements 5 On-site storage and supervision 6 Installation and hydrostatic test 7 Chemical cleaning 8 Water flushing before starting the whole set of units 9 Steam blowing 10 Start-up and commissioning of the whole set of units 11 Anti-rust protection
Referred in DL/T 889-2015:
*GB/T 7596-2017 In-service quality criteria of mineral turbine oils used in power plants
*GB 8978-1996 Integrated Wastewater Discharge Standard
*GB 12145-1989
*GB/T 14541-2017 Guide for maintenance and supervision of in-service mineral turbine oil used for power plants
*DL/T 246-2015 Guideline of chemical supervision
*DL/T 300-2011 Guidelihe for anti-corrosion and anti-foaling of condenser tube in power plant
*DL/T 561-2013 Guide for Chemical Supervision of Water and Steam in Thermal Power Plant
*DL/T 571-2014 Guide for Operation and Maintenance of Phosphate Ester Fire-resistant Fluid Used in Power Plant
*DL/T 712-2021
*DL/T 794-2012 Guideline for chemical cleaning of fossil plant
*DL/T 801-2010 Requirements for internal cooling water quality and its system in large generators
*DL/T 855-2004 The code for maintenance and safekeeping of thermal power equipment in electric power construction
*DL/T 912-2005 Quality criterion of water and steam for supercritical pressure units in fossil fuel power plant
*DL/T 956-2017
*DL 5190.3-2019 Technical specification for thermal power erection and construction -Part 3: Steam turbine generator unit
*DL 5190.5-2019 Technical specification for thermal power erection and construction - Part 5: Piping and system
Code of China
Standard
DL/T 889-2015  Guideline for Chemistry Supervision of Thermal Equipments during Power Station Capital Comstriction (English Version)
Standard No.DL/T 889-2015
Statusvalid
LanguageEnglish
File FormatPDF
Word Count8000 words
Price(USD)240.0
Implemented on2015-12-1
Deliveryvia email in 1 business day
Detail of DL/T 889-2015
Standard No.
DL/T 889-2015
English Name
Guideline for Chemistry Supervision of Thermal Equipments during Power Station Capital Comstriction
Chinese Name
电力基本建设热力设备化学监督导则
Chinese Classification
Professional Classification
DL
ICS Classification
Issued by
NEA
Issued on
2015-7-1
Implemented on
2015-12-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
DL/T 889-2004 Guide of chemistry supervision of thermal equipments for power station capital construction
Language
English
File Format
PDF
Word Count
8000 words
Price(USD)
240.0
Keywords
DL/T 889-2015, DL 889-2015, DLT 889-2015, DL/T889-2015, DL/T 889, DL/T889, DL889-2015, DL 889, DL889, DLT889-2015, DLT 889, DLT889
Introduction of DL/T 889-2015
1 Scope This standard specifies the content and technical requirements of chemical supervision in the basic construction stage of power generation and thermal equipment. This standard is applicable to units with rated pressure of 12.7 MPa and above for thermal equipment in thermal power plants. Units with rated pressure lower than 12.7 MPa may be implemented with reference. 2 Normative references The following referenced documents are indispensable for the application of this standard. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced documents (including any amendment) applies. GB/T 7596 In-service quality criteria of turbine oils used in power plants GB 8978 Integrated wastewater discharge standard GB 12145 Quality criterion of water and steam for power plant and steam-generating equipment GB/T 14541 Guide for maintenance and supervision of in-service mineral turbine oil used for power plants DL/T 246 Guideline of chemical supervision DL/T 300-2011 Guideline for anti-corrosion and anti-fouling of condenser tube in power plant DL/T 561 Guide for chemical supervision of water and steam in thermal power plant DL/T 571 Guide for acceptance, in-service supervision and maintenance management of fire-resistant fluid used in power plants DL/T 712 Guideline for the selection of condenser tube materials in power plant DL/T 794 Guideline for chemical cleaning of fossil plant DL/T 801 Requirements for internal cooling water quality and it's system in large generators DL/T 855 The code for maintenance and safe keeping of thermal power equipment in electric power construction DL/T 912 Quality criterion of water and steam for supercritical pressure units in fossil fuel power plant DL/T 956 Guideline for lay-up of thermal power equipment in fossil plants DL 5190.3 Technical specification for thermal power erection and construction — Part 3: steam turbine generator unit DL 5190.5 Technical specification for thermal power erection and construction — Part 5: Piping and system 3 General 3.1 The chemical supervision of thermal equipment in thermal power plants in the capital construction stage shall meet the general requirements of DL/T 246 for chemical supervision of thermal power plants. 3.2 The chemical supervision of thermal equipment in thermal power plants in the capital construction stage shall be organized by the owner or the unit entrusted by the owner, with the participation of the owner unit, the construction unit, the supervision unit, the commissioning unit and other units. 3.3 The owner unit shall participate in the quality acceptance of important projects such as boiler hydraulic test, boiler chemical cleaning, steam pipe blowing, unit trial operation and 168 h complete trial operation. All supervision tasks shall be included in the project schedule, and their implementation shall be taken as one of the bases for assessing and evaluating the project quality. 3.4 The owner unit is responsible for organizing the collection and collation of chemical technical supervision and inspection reports in the capital construction stage of thermal equipment, and archiving them as the basic data of the unit.
Contents of DL/T 889-2015
Foreword i 1 Scope 2 Normative references 3 General 4 Ex-factory inspection and requirements 5 On-site storage and supervision 6 Installation and hydrostatic test 7 Chemical cleaning 8 Water flushing before starting the whole set of units 9 Steam blowing 10 Start-up and commissioning of the whole set of units 11 Anti-rust protection
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
DL/T 889-2015, DL 889-2015, DLT 889-2015, DL/T889-2015, DL/T 889, DL/T889, DL889-2015, DL 889, DL889, DLT889-2015, DLT 889, DLT889