2026-6-24 216.73.216.131
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB/T 33599-2026
GB/T 33599-2026   Specification of operation and control for photovoltaic power station (English)
Standard No.: GB/T 33599-2026 Status:to be valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 9000 words Translation Price(USD):270.0 remind me the price change

Email:

Implemented on:2026-8-1 Delivery: via email in 1~3 business day

→ → →

,,2026-8-1,01DC2A594FEA6AAE1778135022195
Standard No.: GB/T 33599-2026
English Name: Specification of operation and control for photovoltaic power station
Chinese Name: 光伏发电站并网运行控制规范
Chinese Classification: F12    Solar energy
Professional Classification: GB    National Standard
Source Content Issued by: SAMR, SAC
Issued on: 2026-04-30
Implemented on: 2026-8-1
Status: to be valid
Superseding:GB/T 33599-2017 Specification of operation and control for photovoltaic power station
Target Language: English
File Format: PDF
Word Count: 9000 words
Translation Price(USD): 270.0
Delivery: via email in 1~3 business day
GB/T 33599-2026 Specification of operation and control for photovoltaic power station English, Anglais, Englisch, Inglés, えいご This is a draft translation for reference among interesting stakeholders. The finalized translation (passing through draft translation, self-check, revision and verification) will be delivered upon being ordered. ICS CCS National Standard of the People's Republic of China ‌GB/T 33599-2026 Specification of operation and control for photovoltaic power station 光伏发电站并网运行控制规范 Issue date: 2026-04-30 Implementation date: 2026-10-01 Issued by the General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China the Standardization Administration of the People's Republic of China Contents Foreword 1 Scope 2 Normative References 3 Terms and Definitions 4 Basic Requirements 5 Operation Management 6 Power Forecasting 7 Power Generation Scheduling 8 Power Control 9 Operation of Relay Protection and Security Automatic Devices 10 Power Communication Operation 11 Dispatch Automation Operation 12 Verification Methods Gridconnected operation control specification for photovoltaic power stations 1 Scope This document specifies the basic requirements, operation management, power forecasting, power generation scheduling, power control, operation of relay protection and security automatic devices, power communication operation, dispatch automation operation and verification methods for the gridconnected operation control of photovoltaic power stations. This document applies to the gridconnected operation control of new, reconstructed or expanded photovoltaic power stations connected to the power grid at voltage levels of 10 kV and above. 2 Normative References The following documents are essential for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition (including any amendments) applies. GB/T 14285 Technical code for relaying protection and security automatic equipment GB/T 19964 Technical requirements for connecting photovoltaic power station to power system GB/T 26865.2 Power system realtime dynamic monitoring system — Part 2: Data transmission protocol GB/T 29321 Technical specification for reactive power compensation of photovoltaic power station GB/T 31464 Grid operation code GB/T 32900 Technical requirements for relay protection of photovoltaic power station GB/T 36572 Guide for cyber security protection of electric power monitoring system GB 38755 Guide on security and stability for power system GB/T 38969 Technical guide for power system GB/T 40289 Technical requirements for power control system of photovoltaic power station GB/T 40594 Technical guide for power system network and source coordination GB/T 40595 Technical rule and test guide for primary frequency regulation of gridconnected power source GB/T 40604 Technical requirements for dispatching operation information exchange of new energy station GB/T 50976 Code for installation and acceptance of relay protection and secondary circuit DL/T 516 Operation management code for electric power dispatching automation DL/T 544 Operation management code for power communication DL/T 559 Setting guide for 220 kV~750 kV power grid relaying protection DL/T 584 Setting guide for 3 kV~110 kV power grid relaying protection DL/T 587 Operation management code for relaying protection and security automatic equipment DL/T 623 Evaluation code of relaying protection and security automatic equipment of power systems DL/T 634.5104 Telecontrol equipment and systems — Part 5104: Transmission protocols — Network access for IEC 608705101 using standard transport profiles DL/T 995 Test code for relaying protection and power grid security automatic equipment DL/T 5003 Design code for dispatching automation of electric power systems 3 Terms and Definitions For the purposes of this document, the terms and definitions given in GB/T 19964, GB/T 31464 and the following apply. 3.1 PV power forecasting The process of establishing a photovoltaic power forecasting model using historical power data, historical meteorological data and historical equipment operating status data of a photovoltaic power station, taking information such as irradiance, power or numerical weather prediction data as model inputs, and predicting the future active power of the photovoltaic power station, taking into account the equipment status and operating conditions of the photovoltaic power generation system. NOTE: Depending on the forecast period, it can be classified into mediumterm, shortterm and ultrashortterm PV power forecasting. [Source: GB/T 19964-2024, 3.4] 3.2 mediumterm PV power forecasting The active power forecast of a photovoltaic power station from 00:00 the next day up to 240 hours ahead, with a time resolution of 15 minutes. [Source: GB/T 19964-2024, 3.5] 3.3 shortterm PV power forecasting The active power forecast of a photovoltaic power station from 00:00 the next day up to 72 hours ahead, with a time resolution of 15 minutes. [Source: GB/T 19964-2024, 3.6] 3.4 ultrashortterm PV power forecasting The active power forecast of a photovoltaic power station from 15 minutes to 4 hours ahead, with a time resolution of 15 minutes. [Source: GB/T 19964-2024, 3.7] 4 Basic Requirements 4.1 Photovoltaic power stations shall have the capability for power grid peak regulation, frequency regulation and voltage regulation, and shall comply with the provisions of GB/T 31464, GB 38755, GB/T 40594 and GB/T 40595. 4.2 Photovoltaic power stations shall have the capability to exchange information with the grid dispatching authority. The information exchange content, exchange method and performance indicators shall meet the requirements of GB/T 40604. 4.3 Photovoltaic power stations shall have mediumterm, shortterm and ultrashortterm PV power forecasting functions, and shall submit power forecasts and generation schedules as specified. 4.4 Photovoltaic power stations shall have automatic active power and reactive power regulation functions and shall be able to automatically execute the generation schedules issued by the grid dispatching authority. 4.5 The monitoring system, power forecasting system, relay protection and security automatic devices, power communication system and dispatch automation system of a photovoltaic power station shall comply with the requirements of GB/T 36572. 4.6 Photovoltaic power stations shall be responsible for the operation, maintenance and upgrading of their internal monitoring system, power forecasting system, relay protection and security automatic devices, power communication system and dispatch automation system, and shall accept the professional management and technical supervision of the grid dispatching authority. 5 Operation Management 5.1 Photovoltaic power stations shall be staffed with professional technical personnel in automation, relay protection, monitoring, communication and network security, and shall submit their information to the grid dispatching authority for record. Operational shift personnel at photovoltaic power stations shall have received onthejob training and hold the qualification certificates issued by the grid dispatching authority. 5.2 The operation and maintenance of gridconnected equipment at a photovoltaic power station shall be carried out in accordance with the relevant provisions of the grid dispatching authority. 5.3 Photovoltaic power stations shall ensure the stable operation of their monitoring system, power forecasting system, relay protection and security automatic devices, power communication system and dispatch automation system, and shall transmit operating information of the primary and secondary systems, meteorological information and power forecasting information to the grid dispatching authority in a timely, accurate and reliable manner. 5.4 Photovoltaic power stations shall promptly report to the grid dispatching authority any changes to their primary system equipment, secondary system equipment and their security protection schemes. 5.5 When a photovoltaic power station is taken out of operation under emergency or fault conditions, it shall immediately report to the grid dispatching authority and may only be reconnected to the grid according to dispatch instructions after obtaining the consent of the grid dispatching authority. The photovoltaic power station shall keep accident records and promptly report them to the grid dispatching authority.
Code of China
Standard
GB/T 33599-2026  Specification of operation and control for photovoltaic power station (English)
Standard No.GB/T 33599-2026
Statusto be valid
LanguageEnglish
File FormatPDF
Word Count9000 words
Translation Price(USD)270.0
Implemented on2026-8-1
Deliveryvia email in 1~3 business day
Detail of GB/T 33599-2026
Standard No.
GB/T 33599-2026
English Name
Specification of operation and control for photovoltaic power station
Chinese Name
光伏发电站并网运行控制规范
Chinese Classification
F12
Professional Classification
GB
ICS Classification
Issued by
SAMR, SAC
Issued on
2026-04-30
Implemented on
2026-8-1
Status
to be valid
Superseded by
Superseded on
Abolished on
Superseding
GB/T 33599-2017 Specification of operation and control for photovoltaic power station
Language
English
File Format
PDF
Word Count
9000 words
Translation Price(USD)
270.0
Keywords
GB/T 33599-2026, GB 33599-2026, GBT 33599-2026, GB/T33599-2026, GB/T 33599, GB/T33599, GB33599-2026, GB 33599, GB33599, GBT33599-2026, GBT 33599, GBT33599
Introduction of GB/T 33599-2026
GB/T 33599-2026 Specification of operation and control for photovoltaic power station English, Anglais, Englisch, Inglés, えいご This is a draft translation for reference among interesting stakeholders. The finalized translation (passing through draft translation, self-check, revision and verification) will be delivered upon being ordered. ICS CCS National Standard of the People's Republic of China ‌GB/T 33599-2026 Specification of operation and control for photovoltaic power station 光伏发电站并网运行控制规范 Issue date: 2026-04-30 Implementation date: 2026-10-01 Issued by the General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China the Standardization Administration of the People's Republic of China Contents Foreword 1 Scope 2 Normative References 3 Terms and Definitions 4 Basic Requirements 5 Operation Management 6 Power Forecasting 7 Power Generation Scheduling 8 Power Control 9 Operation of Relay Protection and Security Automatic Devices 10 Power Communication Operation 11 Dispatch Automation Operation 12 Verification Methods Gridconnected operation control specification for photovoltaic power stations 1 Scope This document specifies the basic requirements, operation management, power forecasting, power generation scheduling, power control, operation of relay protection and security automatic devices, power communication operation, dispatch automation operation and verification methods for the gridconnected operation control of photovoltaic power stations. This document applies to the gridconnected operation control of new, reconstructed or expanded photovoltaic power stations connected to the power grid at voltage levels of 10 kV and above. 2 Normative References The following documents are essential for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition (including any amendments) applies. GB/T 14285 Technical code for relaying protection and security automatic equipment GB/T 19964 Technical requirements for connecting photovoltaic power station to power system GB/T 26865.2 Power system realtime dynamic monitoring system — Part 2: Data transmission protocol GB/T 29321 Technical specification for reactive power compensation of photovoltaic power station GB/T 31464 Grid operation code GB/T 32900 Technical requirements for relay protection of photovoltaic power station GB/T 36572 Guide for cyber security protection of electric power monitoring system GB 38755 Guide on security and stability for power system GB/T 38969 Technical guide for power system GB/T 40289 Technical requirements for power control system of photovoltaic power station GB/T 40594 Technical guide for power system network and source coordination GB/T 40595 Technical rule and test guide for primary frequency regulation of gridconnected power source GB/T 40604 Technical requirements for dispatching operation information exchange of new energy station GB/T 50976 Code for installation and acceptance of relay protection and secondary circuit DL/T 516 Operation management code for electric power dispatching automation DL/T 544 Operation management code for power communication DL/T 559 Setting guide for 220 kV~750 kV power grid relaying protection DL/T 584 Setting guide for 3 kV~110 kV power grid relaying protection DL/T 587 Operation management code for relaying protection and security automatic equipment DL/T 623 Evaluation code of relaying protection and security automatic equipment of power systems DL/T 634.5104 Telecontrol equipment and systems — Part 5104: Transmission protocols — Network access for IEC 608705101 using standard transport profiles DL/T 995 Test code for relaying protection and power grid security automatic equipment DL/T 5003 Design code for dispatching automation of electric power systems 3 Terms and Definitions For the purposes of this document, the terms and definitions given in GB/T 19964, GB/T 31464 and the following apply. 3.1 PV power forecasting The process of establishing a photovoltaic power forecasting model using historical power data, historical meteorological data and historical equipment operating status data of a photovoltaic power station, taking information such as irradiance, power or numerical weather prediction data as model inputs, and predicting the future active power of the photovoltaic power station, taking into account the equipment status and operating conditions of the photovoltaic power generation system. NOTE: Depending on the forecast period, it can be classified into mediumterm, shortterm and ultrashortterm PV power forecasting. [Source: GB/T 19964-2024, 3.4] 3.2 mediumterm PV power forecasting The active power forecast of a photovoltaic power station from 00:00 the next day up to 240 hours ahead, with a time resolution of 15 minutes. [Source: GB/T 19964-2024, 3.5] 3.3 shortterm PV power forecasting The active power forecast of a photovoltaic power station from 00:00 the next day up to 72 hours ahead, with a time resolution of 15 minutes. [Source: GB/T 19964-2024, 3.6] 3.4 ultrashortterm PV power forecasting The active power forecast of a photovoltaic power station from 15 minutes to 4 hours ahead, with a time resolution of 15 minutes. [Source: GB/T 19964-2024, 3.7] 4 Basic Requirements 4.1 Photovoltaic power stations shall have the capability for power grid peak regulation, frequency regulation and voltage regulation, and shall comply with the provisions of GB/T 31464, GB 38755, GB/T 40594 and GB/T 40595. 4.2 Photovoltaic power stations shall have the capability to exchange information with the grid dispatching authority. The information exchange content, exchange method and performance indicators shall meet the requirements of GB/T 40604. 4.3 Photovoltaic power stations shall have mediumterm, shortterm and ultrashortterm PV power forecasting functions, and shall submit power forecasts and generation schedules as specified. 4.4 Photovoltaic power stations shall have automatic active power and reactive power regulation functions and shall be able to automatically execute the generation schedules issued by the grid dispatching authority. 4.5 The monitoring system, power forecasting system, relay protection and security automatic devices, power communication system and dispatch automation system of a photovoltaic power station shall comply with the requirements of GB/T 36572. 4.6 Photovoltaic power stations shall be responsible for the operation, maintenance and upgrading of their internal monitoring system, power forecasting system, relay protection and security automatic devices, power communication system and dispatch automation system, and shall accept the professional management and technical supervision of the grid dispatching authority. 5 Operation Management 5.1 Photovoltaic power stations shall be staffed with professional technical personnel in automation, relay protection, monitoring, communication and network security, and shall submit their information to the grid dispatching authority for record. Operational shift personnel at photovoltaic power stations shall have received onthejob training and hold the qualification certificates issued by the grid dispatching authority. 5.2 The operation and maintenance of gridconnected equipment at a photovoltaic power station shall be carried out in accordance with the relevant provisions of the grid dispatching authority. 5.3 Photovoltaic power stations shall ensure the stable operation of their monitoring system, power forecasting system, relay protection and security automatic devices, power communication system and dispatch automation system, and shall transmit operating information of the primary and secondary systems, meteorological information and power forecasting information to the grid dispatching authority in a timely, accurate and reliable manner. 5.4 Photovoltaic power stations shall promptly report to the grid dispatching authority any changes to their primary system equipment, secondary system equipment and their security protection schemes. 5.5 When a photovoltaic power station is taken out of operation under emergency or fault conditions, it shall immediately report to the grid dispatching authority and may only be reconnected to the grid according to dispatch instructions after obtaining the consent of the grid dispatching authority. The photovoltaic power station shall keep accident records and promptly report them to the grid dispatching authority.
Contents of GB/T 33599-2026
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 3680948734
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB/T 33599-2026, GB 33599-2026, GBT 33599-2026, GB/T33599-2026, GB/T 33599, GB/T33599, GB33599-2026, GB 33599, GB33599, GBT33599-2026, GBT 33599, GBT33599