2025-12-13 216.73.216.3
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/JTJ 042-1994
JTJ 042-1994   Technical Specification for Construction of Highway Tunnel (English Version)
Standard No.: JTJ 042-1994 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 41000 words Translation Price(USD):820.0 remind me the price change

Email:

Implemented on:1995-7-1 Delivery: via email in 1 business day

→ → →

,2009-10-1,1995-7-1,141137302381716CE04E42106108F
Standard No.: JTJ 042-1994
English Name: Technical Specification for Construction of Highway Tunnel
Chinese Name: 公路隧道施工技术规范
Professional Classification: JT    Professional Standard - Transport
Source Content Issued by: Ministry of Transport
Issued on: 1994-11-30
Implemented on: 1995-7-1
Status: superseded
Superseded by:JTG F60-2009 Technical Specifications for Construction of Highway Tunnel
JTG F60―2009 Tecjmocal Specifications for Construction of Highway Tunnel
Superseded on:2009-10-1
Target Language: English
File Format: PDF
Word Count: 41000 words
Translation Price(USD): 820.0
Delivery: via email in 1 business day
1.0.1 This code is formulated with a view to provide technical base and code of conduct for construction and construction management of the highway mountain tunnel projects. 1.0.2 This code is applicable to all levels of highway mountain tunnels 1.0.3 Under the overall construction planning of highway building, tunnel construction shall formulate the corresponding construction management plan. Compiling the construction management plan, it shall consider tunnel length, requirement of section and construction period, geological conditions and local natural conditions, to determine rational construction method and construction schedule. 1.0.4 Quality auditing system must be carried out. Strict comply with the operating rules and do well the material testing task. During the construction process, it shall do well the technological explanation task, and give technology, quality and safety education to ensure the quality of the projects, and insisted on civilized construction. 1.0.5 It shall formulate security system and measures, strengthen tasks like ventilation, lighting, dust-proof, cooling, water-proof and prevention of harmful gases, and the prevent landslides accident to protect the health and security of construction workers. 1.0.6It shall follow out national technical economy policies, aggressively and prudently adopt new technique, new material, new equipment and new technology during the construction process, so that the tunnels construction will be in line with requirements for advanced technology, rational economic, reliable quality, security and practical. 1.0.7 It shall reasonably arrange turnaround time of the construction machinery equipment to improve machine utilization. It shall reinforce technical management, reasonably arrange the operating cycle of process progress and key process, organize balanced production and improve labor productivity. 1.0.8 It must pay close attention to variation of surrounding rock and groundwater and other changes during the tunnel construction, when the construction method or support structure are unadapted to practical surrounding rock state, it must take emergency measures, and timely adopt appropriate construction method or support structure with the approval of technical director. 1.0.9 Installation of ancillary facilities shall be transacted according to like electrical, mechanical, chemical and other relevant professional provisions. 1.0.10 It shall take environmental protection measures under construction, and shall be in accordance with the relevant provisions of environmental protection. 1.0.11 It shall accumulate information and data at any moment during the construction process and do a good job in the working procedure of the original records. 1.0.12 Tunnel construction shall be prepared with a comprehensive and summary of the individual construction technology. It shall timely submit the completion documents after the tunnel construction. 1.0.13 Not only the requirements for highway tunnel construction, but also those specified in the current relevant compulsory ones of the nation and the Ministry of Transportation and Communications shall be complied.
1 General provisions 2 Preparation of construction 3 Constructional measurements 3.1 General provision 3.2 Constructional measurement inside the tunnel 3.3 Measurement and adjustment of piercing error 3.4 Acceptance survey 3.5 Measurement of access adit 4 Projects of tunnel adit, open tunnel and shallow-buried district 4.1 Tunnel adit project 4.2 Open tunnel project 4.3 Shallow-buried projects 5 Excavations 5.1 General requirement 5.2 Excavation method 5.3 Back break control 5.4 Drilling and blasting design 5.5 Drilling and blasting operations 5.6 TBM excavation 6 Slagging and transportation 6.1 Musk loading and unloading 6.2 Transportation 7 Construction support 7.1 General requirement 7.2 Bolt construction 7.3 Shotcrete 7.4 Quality requirements for anchor-spray support 7.5 Member support 7.6 Laying of member support 8 Lining 8.1 General requirements 8.2 Arch center (wall frame) and formwork 8.3 Moulded lining 8.4 Secondary lining 9 Monitoring measurement 9.1 General requirements 9.2 Measurement content and method 9.3 Measurement data processing and application 9.4 Measurement management 10 Waterproofing and drainage 10.1 General requirements 10.2 Construction of waterproof and drainage 10.3 Construction for structure waterproof and drainage 11 Wind-water electricity operation and ventilation and dust control 11.1 Air supply and water supply 11.2 Power supply and lighting 11.3 Ventilation, dustproof and noxious-gas-proof 12 Access adits 12.1 General requirements 12.2 Inclined shaft 12.3 Vertical shaft 12.4 Horizontal tunnel and parallel pilot tunnel 13 Auxiliary construction methods 13.1 Scope of application and general requirements 13.2 Method for stabilizing the cut surface 13.3 Processing method of gushing water 14 Construction of section with special geology 14.1 General requirements 14.2 Expansible surrounding rock 14.3 Loess 14.4 Karst cave 14.5 Landslide 14.6 Driftsand 14.7 Layer with gasses 15 Subgrades, roadbases and pavement 15.1 General requirements 15.2 Subgrades 15.3 Roadbases 15.4 Pavement 16 Appurtenant work engineering 16.1 Equipment cave, horizontal adit and others 16.2 Decoration engineering 16.3 Operating management facilities Appendix A Excavation Methods and Excavation and Support Precedence Diagrams Appendix B Blasting Forming Slot Test Method Appendix C Construction Note of Bolt-spray Support Appendix D Test and Measuring Method of Bolt-spray Support Appendix E Data Sheet of Measurement Appendix F Ventilation System in Construction Appendix G Explanation of Wording in This Code
Code of China
Standard
JTJ 042-1994  Technical Specification for Construction of Highway Tunnel (English Version)
Standard No.JTJ 042-1994
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count41000 words
Price(USD)820.0
Implemented on1995-7-1
Deliveryvia email in 1 business day
Detail of JTJ 042-1994
Standard No.
JTJ 042-1994
English Name
Technical Specification for Construction of Highway Tunnel
Chinese Name
公路隧道施工技术规范
Chinese Classification
Professional Classification
JT
ICS Classification
Issued by
Ministry of Transport
Issued on
1994-11-30
Implemented on
1995-7-1
Status
superseded
Superseded by
JTG F60-2009 Technical Specifications for Construction of Highway Tunnel
JTG F60―2009 Tecjmocal Specifications for Construction of Highway Tunnel
Superseded on
2009-10-1
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
41000 words
Price(USD)
820.0
Keywords
JTJ 042-1994, JTJ/T 042-1994, JTJT 042-1994, JTJ042-1994, JTJ 042, JTJ042, JTJ/T042-1994, JTJ/T 042, JTJ/T042, JTJT042-1994, JTJT 042, JTJT042
Introduction of JTJ 042-1994
1.0.1 This code is formulated with a view to provide technical base and code of conduct for construction and construction management of the highway mountain tunnel projects. 1.0.2 This code is applicable to all levels of highway mountain tunnels 1.0.3 Under the overall construction planning of highway building, tunnel construction shall formulate the corresponding construction management plan. Compiling the construction management plan, it shall consider tunnel length, requirement of section and construction period, geological conditions and local natural conditions, to determine rational construction method and construction schedule. 1.0.4 Quality auditing system must be carried out. Strict comply with the operating rules and do well the material testing task. During the construction process, it shall do well the technological explanation task, and give technology, quality and safety education to ensure the quality of the projects, and insisted on civilized construction. 1.0.5 It shall formulate security system and measures, strengthen tasks like ventilation, lighting, dust-proof, cooling, water-proof and prevention of harmful gases, and the prevent landslides accident to protect the health and security of construction workers. 1.0.6It shall follow out national technical economy policies, aggressively and prudently adopt new technique, new material, new equipment and new technology during the construction process, so that the tunnels construction will be in line with requirements for advanced technology, rational economic, reliable quality, security and practical. 1.0.7 It shall reasonably arrange turnaround time of the construction machinery equipment to improve machine utilization. It shall reinforce technical management, reasonably arrange the operating cycle of process progress and key process, organize balanced production and improve labor productivity. 1.0.8 It must pay close attention to variation of surrounding rock and groundwater and other changes during the tunnel construction, when the construction method or support structure are unadapted to practical surrounding rock state, it must take emergency measures, and timely adopt appropriate construction method or support structure with the approval of technical director. 1.0.9 Installation of ancillary facilities shall be transacted according to like electrical, mechanical, chemical and other relevant professional provisions. 1.0.10 It shall take environmental protection measures under construction, and shall be in accordance with the relevant provisions of environmental protection. 1.0.11 It shall accumulate information and data at any moment during the construction process and do a good job in the working procedure of the original records. 1.0.12 Tunnel construction shall be prepared with a comprehensive and summary of the individual construction technology. It shall timely submit the completion documents after the tunnel construction. 1.0.13 Not only the requirements for highway tunnel construction, but also those specified in the current relevant compulsory ones of the nation and the Ministry of Transportation and Communications shall be complied.
Contents of JTJ 042-1994
1 General provisions 2 Preparation of construction 3 Constructional measurements 3.1 General provision 3.2 Constructional measurement inside the tunnel 3.3 Measurement and adjustment of piercing error 3.4 Acceptance survey 3.5 Measurement of access adit 4 Projects of tunnel adit, open tunnel and shallow-buried district 4.1 Tunnel adit project 4.2 Open tunnel project 4.3 Shallow-buried projects 5 Excavations 5.1 General requirement 5.2 Excavation method 5.3 Back break control 5.4 Drilling and blasting design 5.5 Drilling and blasting operations 5.6 TBM excavation 6 Slagging and transportation 6.1 Musk loading and unloading 6.2 Transportation 7 Construction support 7.1 General requirement 7.2 Bolt construction 7.3 Shotcrete 7.4 Quality requirements for anchor-spray support 7.5 Member support 7.6 Laying of member support 8 Lining 8.1 General requirements 8.2 Arch center (wall frame) and formwork 8.3 Moulded lining 8.4 Secondary lining 9 Monitoring measurement 9.1 General requirements 9.2 Measurement content and method 9.3 Measurement data processing and application 9.4 Measurement management 10 Waterproofing and drainage 10.1 General requirements 10.2 Construction of waterproof and drainage 10.3 Construction for structure waterproof and drainage 11 Wind-water electricity operation and ventilation and dust control 11.1 Air supply and water supply 11.2 Power supply and lighting 11.3 Ventilation, dustproof and noxious-gas-proof 12 Access adits 12.1 General requirements 12.2 Inclined shaft 12.3 Vertical shaft 12.4 Horizontal tunnel and parallel pilot tunnel 13 Auxiliary construction methods 13.1 Scope of application and general requirements 13.2 Method for stabilizing the cut surface 13.3 Processing method of gushing water 14 Construction of section with special geology 14.1 General requirements 14.2 Expansible surrounding rock 14.3 Loess 14.4 Karst cave 14.5 Landslide 14.6 Driftsand 14.7 Layer with gasses 15 Subgrades, roadbases and pavement 15.1 General requirements 15.2 Subgrades 15.3 Roadbases 15.4 Pavement 16 Appurtenant work engineering 16.1 Equipment cave, horizontal adit and others 16.2 Decoration engineering 16.3 Operating management facilities Appendix A Excavation Methods and Excavation and Support Precedence Diagrams Appendix B Blasting Forming Slot Test Method Appendix C Construction Note of Bolt-spray Support Appendix D Test and Measuring Method of Bolt-spray Support Appendix E Data Sheet of Measurement Appendix F Ventilation System in Construction Appendix G Explanation of Wording in This Code
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
JTJ 042-1994, JTJ/T 042-1994, JTJT 042-1994, JTJ042-1994, JTJ 042, JTJ042, JTJ/T042-1994, JTJ/T 042, JTJ/T042, JTJT042-1994, JTJT 042, JTJT042