2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/SY 4201.4-2007
SY 4201.4-2007   Code for quality acceptance of oil and gas construction engineering Equipment installation engineering Part 4:Boiler device (English Version)
Standard No.: SY 4201.4-2007 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 12000 words Translation Price(USD):300.0 remind me the price change

Email:

Implemented on:2008-3-1 Delivery: via email in 1 business day

→ → →

2016-06-01,2016-6-1,2008-3-1,14113756242042961ADE759B8FFA3
Standard No.: SY 4201.4-2007
English Name: Code for quality acceptance of oil and gas construction engineering Equipment installation engineering Part 4:Boiler device
Chinese Name: 石油天然气建设工程施工质量验收规范设备安装工程第4部分:炉类设备
Chinese Classification: P93    Mechanical equipment installation engineering
Professional Classification: SY    Professional Standard - Oil & Gas
Source Content Issued by: NDRC
Issued on: 2007-10-8
Implemented on: 2008-3-1
Status: superseded
Superseded by:SY 4201.4-2016 Code for quality acceptance of oil and gas construction engineering - Equipment installation engineering - Part 4: Boiler device
Superseded on:2016-6-1
Abolished on:2016-06-01
Target Language: English
File Format: PDF
Word Count: 12000 words
Translation Price(USD): 300.0
Delivery: via email in 1 business day
This Part of SY 4201 specifies the quality criteria, contents and procedures of the acceptance of inspection lots and subitem projects of the boiler device installation engineering in equipment installation engineering; and it also specifies the quality management and control at construction site of the boiler device installation engineering in equipment installation engineering. This Part is applicable to the construction quality acceptance of boiler device in equipment installation engineering of oil and gas construction engineering, including the installation of special skid-mounted steam injection boiler for oilfield and the installation of water jacket heater, firetube heater, (separating, heating and buffering) integral unit, vertical and horizontal cylindrical tubular heaters, and heat medium indirect heater. The acceptance of the installation quality of micro-positive pressure heater may also referred to this Part.
Foreword II 1 Scope 2 Normative References 3 Terms and Definitions 4 General 5 Basic Requirements 6 Installation of Special Skid-mounted Steam Injection Boiler for Oilfield 6.1 Boiler Installation 6.2 Installation of Auxiliary Machinery and Accessory 6.3 Commissioning and Test Run 6.4 Completion Acceptance 7 Installation of Heater 7.1 Installation of Heater 7.2 Installation of Accessories 7.3 Oven and Test Run 7.4 Completion Acceptance Appendix A (Normative) Quality Acceptance Records for Inspection Lot Appendix B (Normative) List of Engineering Inspection Instruments Appendix C (Normative) Verification Records for Quality Control Information of Boiler Device Installation Subsection Projects Appendix D (Informative) Explanation of Provisions
Referred in SY 4201.4-2007:
*GB/T 3323-2005 Radiographic examination of fusion welded joints in metallic materials
*GB 50275-2010 Code for construction and acceptance of computer, fan and pump installation engineering
*SY 4200-2007 Code for Quality Acceptance of Oil and Gas Construction Engineering
*SY 4202-2016
SY 4201.4-2007 is referred in:
* SY 4209-2008 Code for Quality Acceptance of Oil and Gas Construction Engineering - Natural Gas Conditioning Plant
* SY 4209-2008 Code for Quality Acceptance of Oil and Gas Construction Engineering - Natural Gas Conditioning Plant
Code of China
Standard
SY 4201.4-2007  Code for quality acceptance of oil and gas construction engineering Equipment installation engineering Part 4:Boiler device (English Version)
Standard No.SY 4201.4-2007
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count12000 words
Price(USD)300.0
Implemented on2008-3-1
Deliveryvia email in 1 business day
Detail of SY 4201.4-2007
Standard No.
SY 4201.4-2007
English Name
Code for quality acceptance of oil and gas construction engineering Equipment installation engineering Part 4:Boiler device
Chinese Name
石油天然气建设工程施工质量验收规范设备安装工程第4部分:炉类设备
Chinese Classification
P93
Professional Classification
SY
ICS Classification
Issued by
NDRC
Issued on
2007-10-8
Implemented on
2008-3-1
Status
superseded
Superseded by
SY 4201.4-2016 Code for quality acceptance of oil and gas construction engineering - Equipment installation engineering - Part 4: Boiler device
Superseded on
2016-6-1
Abolished on
2016-06-01
Superseding
Language
English
File Format
PDF
Word Count
12000 words
Price(USD)
300.0
Keywords
SY 4201.4-2007, SY/T 4201.4-2007, SYT 4201.4-2007, SY4201.4-2007, SY 4201.4, SY4201.4, SY/T4201.4-2007, SY/T 4201.4, SY/T4201.4, SYT4201.4-2007, SYT 4201.4, SYT4201.4
Introduction of SY 4201.4-2007
This Part of SY 4201 specifies the quality criteria, contents and procedures of the acceptance of inspection lots and subitem projects of the boiler device installation engineering in equipment installation engineering; and it also specifies the quality management and control at construction site of the boiler device installation engineering in equipment installation engineering. This Part is applicable to the construction quality acceptance of boiler device in equipment installation engineering of oil and gas construction engineering, including the installation of special skid-mounted steam injection boiler for oilfield and the installation of water jacket heater, firetube heater, (separating, heating and buffering) integral unit, vertical and horizontal cylindrical tubular heaters, and heat medium indirect heater. The acceptance of the installation quality of micro-positive pressure heater may also referred to this Part.
Contents of SY 4201.4-2007
Foreword II 1 Scope 2 Normative References 3 Terms and Definitions 4 General 5 Basic Requirements 6 Installation of Special Skid-mounted Steam Injection Boiler for Oilfield 6.1 Boiler Installation 6.2 Installation of Auxiliary Machinery and Accessory 6.3 Commissioning and Test Run 6.4 Completion Acceptance 7 Installation of Heater 7.1 Installation of Heater 7.2 Installation of Accessories 7.3 Oven and Test Run 7.4 Completion Acceptance Appendix A (Normative) Quality Acceptance Records for Inspection Lot Appendix B (Normative) List of Engineering Inspection Instruments Appendix C (Normative) Verification Records for Quality Control Information of Boiler Device Installation Subsection Projects Appendix D (Informative) Explanation of Provisions
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
SY 4201.4-2007, SY/T 4201.4-2007, SYT 4201.4-2007, SY4201.4-2007, SY 4201.4, SY4201.4, SY/T4201.4-2007, SY/T 4201.4, SY/T4201.4, SYT4201.4-2007, SYT 4201.4, SYT4201.4