2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB 50275-2010
GB 50275-2010   Code for construction and acceptance of computer, fan and pump installation engineering (English Version)
Standard No.: GB 50275-2010 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 29000 words Translation Price(USD):280.0 remind me the price change

Email:

Implemented on:2011-2-1 Delivery: via email in 1 business day

→ → →

,,2011-2-1,141138181893332C8EC3344E1FFEE
Standard No.: GB 50275-2010
English Name: Code for construction and acceptance of computer, fan and pump installation engineering
Chinese Name: 风机、压缩机、泵安装工程施工及验收规范
Professional Classification: GB    National Standard
Source Content Issued by: MOHURD
Issued on: 2010-07-15
Implemented on: 2011-2-1
Status: valid
Superseding:GB 50275-1998 Code for construction and acceptance of computer, fan and pump installation engineering
Target Language: English
File Format: PDF
Word Count: 29000 words
Translation Price(USD): 280.0
Delivery: via email in 1 business day
1 General Provisions 1.0.1 This standard is formulated with a view to guaranteeing quality and safe operation of fan, compressor and pump installation engineering, and promoting technological advances of fan, compressor and pump installation. 1.0.2 This standard is applicable to the construction and acceptance for installation engineering of the following fans, compressors and pumps: 1 Centrifugal fan, centrifugal blower, axial fan, axial blower, Roots and Jaeger blower, anti-explosion fan and firefighting smoke extractor fan; 2 Displacement reciprocating type, screw type, sliding blade type and membrane type compressor, axial flow compressor and centrifugal compressor; 3 Centrifugal pump, well pump, membrane pump, metering pump, mixed-flow pump, axial pump, vortex pump, screw pump, gear pump, rotor pump, submersible water pump, turbine pump, water ring pump, and reciprocating pump. 1.0.3 The construction and acceptance of fan, compressor and pump installation engineering shall not only comply with this standard, but also the requirements specified in the relevant current standards of the country. 2 Fan 2.1 Basic Requirements 2.1.1 The unpacking inspection of fans shall meet the following requirements: 1 Parts, components, auxiliary equipments and accompanying technical documents for fans shall be counted and inspected according to the equipment packing list; 2 The main installation sizes of impeller wheel, casing and other positions shall be checked according to the design drawing; 3 The model, conveyance medium, inlet/outlet direction (or angle) and pressure of fans shall correspond with the requirements of the engineering design; impeller wheel rotation direction, stator guide impeller and straightening blade angle/direction shall meet the requirements of the accompanying technical documents; 4 Finish surfaces of exposed fan parts shall be rustless; major parts and components, like rotor impeller wheel/axle neck, gear surface, and gear wheel shaft neck, shall be free of bumping or obvious deformation; 5 The rustproof packaging of fan shall be in good order and condition; the air inlet and outlet of factory assembled fans shall be shielded with cover plates, and kept from dust and sundries entering. 6 The protection measures shall be taken after the surface inspection for exposed vibration testing positions. 2.1.2 Handling and lifting of fans shall meet the following requirements: 1 For handling and hoisting factory assembled fans, the rope shall not bundled on lifting lugs of rotor/casing or bearing upper covers. 2 For handling and hoisting site assembled fans, the rope shall not damage component surface; rotor/gear axle neck or vibration testing position shall not be used as rope bundling positions; rotor and casing shall keep horizontal while hoisting. 3 The protective layer coated on fan rotor and casing for conveying special media shall be protected well from damage; 4 Rotors or gears shall not directly be rolled or moved on ground. 2.1.3 Besides the relevant requirements of "General Code for Construction and Acceptance of Mechanical Equipment Installation Engineering" GB 50231 and the accompanying technical document, the cleaning and inspection of fans before assembling shall also meet the following requirements: 1 Exposed finish surface, assembling fitting surface, sliding surface, as well as pipe, oil tank and vessel, for the equipment, shall be washed and cleaned, factory-assembled assembly parts shall be unpicked and washed if they exceed rust prevention period. 2 As for the compressors to convey combustible and explosive gases like hydrogen and oxygen, the parts, component, pipes as well as the accessories shall be de-oiled, and the oil residue level after de-oiling shall not be larger than 125 mg/m2; they shall be blown dry with dry air or nitrogen after de-oiling, and treated with oil-free sealing; 3 Oil pump, filter, oil cooler, safety valve, etc., equipped in lubricating system and sealing system shall be dismantled and cleaned; 4 The tightness test shall be conducted for oil cooler at maximum working pressure, and the oil cooler shall have no leakage, 10 min after pressure maintaining; 5 In the site assembly, mating surfaces and machining surface of the machine, surface of rotatable parts, as well as attached equipments of the components, shall be washed and cleaned; the rust, if have, shall be removed, and the rust-proofing measures shall be taken to prevent rusting during installation period; 6 The regulating mechanism shall be washed and cleaned, and it shall rotate smoothly. 2.1.4 Centering for shafts (axes) of fan units shall meet the following requirements: 1 The machine located in shafting or with large mass or great installation difficulty shall be selected as reference machine for centering. 2 Non-reference machine shall be centered and leveled on the base of reference machine, and the shafting of the unit in work shall be made continuous smooth curve equivalent to the lift on both ends; 3 The final centering of the unit shafting shall be conducted by practical rotor passing through the coupling, and it shall meet the requirements of items 1 and 2 in this article. 2.1.5 The end clearance, radial displacement and axial slope of the coupling shall meet the provisions of the accompanying technical documents; if no provisions related are available, the relevant provisions stated in the current national standard "General Code for Construction and Acceptance of Mechanical Equipment Installation Engineering" GB 50231 shall apply. 2.1.6 Besides the relevant requirements in the current national standards "Code for Construction and Acceptance of Industrial Metallic Piping" GB 50235 and "Code of Acceptance for Construction Quality of Ventilation and Air Conditioning Works" GB 50243, the air inlet, gas exhaust piping and other pipelines of fans shall meet the following requirements: 1 The pipeline, large valve, regulating device, cooling device and lubricating oil system, etc. of fan air inlet and gas exhaust systems, shall be provided with independent support. Such supports shall be connected firmly with the base or other buildings; for connecting with the fan casting, the external force shall not be applied on the fan casting. After the connection, the installation level and main clearance of the units shall be re-measured, and they shall meet the requirements of the accompanying technical documents;
Contents 1 General Provisions 2 Fan 2.1 Basic Requirements 2.2 Centrifugal Fan 2.3 Axial Fan 2.4 Roots and Jaeger Blower 2.5 Centrifugal Blower 2.6 Axial Blower 2.7 Anti-explosion Fan and Firefighting Smoke Extractor Fan 3 Compressor 3.1 Basic requirements 3.2 Factory Assembled Compressor 3.3 Site Assembled Reciprocating Compressor 3.4 Attached Equipments 3.5 Test run 3.6 Nonlubricated Compressor 3.7 Screw Type Compressors 3.8 Centrifugal Compressor and Axial Flow Compressor 4 Pump 4.1 Basic Requirements 4.2 Centrifugal Pump 4.3 Well Pump 4.4 Mixed-flow Pump, Axial Pump and Vortex Pump 4.5 Reciprocating Pump 4.6 Membrane Pump and Metering Pump 4.7 Screw Pump, Gear Pump and Rotor Pump 4.8 Water-ring Vacuum Pump 5 Engineering Acceptance Appendix A Vibration Testing and Limits of Fan, Compressor and Pump Appendix B Cleanness testing and limits of compressor and pump Appendix C Requirements on Configuration of Pump Suction and Discharge Line Explanation of Wording List of Quoted Standards
GB 50275-2010 is referred in:
* SY/T 0460-2010 Technical code for construction of equipment and piping installation engineering for natural gas conditioning purification facilities
* GB/T 50561-2010 Code for equipment installing and acceptance of building material industry
* SY 4201.4-2007 Code for quality acceptance of oil and gas construction engineering Equipment installation engineering Part 4:Boiler device
* GB 50974-2014 Code of design on fire protection water supply and hydrant systems
* SY/T 0524-2008 Code for heater system with heat-transfer oil
* SY 4118-2010 Technical Code for Construction of Gathering and Transmission Distributing Station Projects in Highly Hydrogen Sulfide Gas Field
* GB 50738-2011 Code for construction of ventilation and air conditioning
* GB 50156-2012 Code for design and construction of filling station
* GB 50516-2010 Technical Code for Hydrogen Fuelling Station
* GB 50974-2014 Code of design on fire protection water supply and hydrant systems
* GB 50974-2014 Code of design on fire protection water supply and hydrant systems
* GB/T 16507.8-2013 Water-tube Boilers - Part 8: Installation and Operation
* GB 50974-2014 Code of design on fire protection water supply and hydrant systems
* GB/T 16507.8-2013 Water-tube Boilers - Part 8: Installation and Operation
* GB 50156-2012 Code for design and construction of filling station
* GB 50738-2011 Code for construction of ventilation and air conditioning
* SY 4118-2010 Technical Code for Construction of Gathering and Transmission Distributing Station Projects in Highly Hydrogen Sulfide Gas Field
* SY/T 0460-2010 Technical code for construction of equipment and piping installation engineering for natural gas conditioning purification facilities
* GB 50516-2010 Technical Code for Hydrogen Fuelling Station
* GB 50516-2010 Technical Code for Hydrogen Fuelling Station
* GB/T 50561-2010 Code for equipment installing and acceptance of building material industry
* GB 50516-2010 Technical Code for Hydrogen Fuelling Station
* SY/T 0524-2008 Code for heater system with heat-transfer oil
* GB 50974-2014 Code of design on fire protection water supply and hydrant systems
* GB 50219-2014 Technical Code for water spray fire protection systems
* HJ 2019-2012 Technical specification for waste water treatment and reuse of iron and steel industry
* GB 51093-2015 Technical code for hydrochloric acid regeneration engineering according to spraying and roasting technology of iron and steel enterprises
*CECS 263-2009 Technical specification for large-space intelligent active control sprinkler systems
*JB/T 6427-2015 PSA oxygen and nitrogen plants
*GB/T 19774-2005 Specification of water electrolyte system for producing hydrogen
*GB/T 29729-2013 Essential requirements for the safety of hydrogen systems
*GB 51427-2021 Technical standard for auto tracking and targeting jet suppression system
*GB/T 16508.7-2022 Shell boilers—Part 7:Installation
*GB 50151-2021 Technical standard for foam extinguishing systems
*GB/T 16507.8-2022 Water-tube boilers—Part 8: Installation and operation
*GB/T 29729-2022 Essential requirements for the safety of hydrogen systems
*GB 50261-2017 Code for installation and commissioning of sprinkler systems
Code of China
Standard
GB 50275-2010  Code for construction and acceptance of computer, fan and pump installation engineering (English Version)
Standard No.GB 50275-2010
Statusvalid
LanguageEnglish
File FormatPDF
Word Count29000 words
Price(USD)280.0
Implemented on2011-2-1
Deliveryvia email in 1 business day
Detail of GB 50275-2010
Standard No.
GB 50275-2010
English Name
Code for construction and acceptance of computer, fan and pump installation engineering
Chinese Name
风机、压缩机、泵安装工程施工及验收规范
Chinese Classification
Professional Classification
GB
ICS Classification
Issued by
MOHURD
Issued on
2010-07-15
Implemented on
2011-2-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
GB 50275-1998 Code for construction and acceptance of computer, fan and pump installation engineering
Language
English
File Format
PDF
Word Count
29000 words
Price(USD)
280.0
Keywords
GB 50275-2010, GB/T 50275-2010, GBT 50275-2010, GB50275-2010, GB 50275, GB50275, GB/T50275-2010, GB/T 50275, GB/T50275, GBT50275-2010, GBT 50275, GBT50275
Introduction of GB 50275-2010
1 General Provisions 1.0.1 This standard is formulated with a view to guaranteeing quality and safe operation of fan, compressor and pump installation engineering, and promoting technological advances of fan, compressor and pump installation. 1.0.2 This standard is applicable to the construction and acceptance for installation engineering of the following fans, compressors and pumps: 1 Centrifugal fan, centrifugal blower, axial fan, axial blower, Roots and Jaeger blower, anti-explosion fan and firefighting smoke extractor fan; 2 Displacement reciprocating type, screw type, sliding blade type and membrane type compressor, axial flow compressor and centrifugal compressor; 3 Centrifugal pump, well pump, membrane pump, metering pump, mixed-flow pump, axial pump, vortex pump, screw pump, gear pump, rotor pump, submersible water pump, turbine pump, water ring pump, and reciprocating pump. 1.0.3 The construction and acceptance of fan, compressor and pump installation engineering shall not only comply with this standard, but also the requirements specified in the relevant current standards of the country. 2 Fan 2.1 Basic Requirements 2.1.1 The unpacking inspection of fans shall meet the following requirements: 1 Parts, components, auxiliary equipments and accompanying technical documents for fans shall be counted and inspected according to the equipment packing list; 2 The main installation sizes of impeller wheel, casing and other positions shall be checked according to the design drawing; 3 The model, conveyance medium, inlet/outlet direction (or angle) and pressure of fans shall correspond with the requirements of the engineering design; impeller wheel rotation direction, stator guide impeller and straightening blade angle/direction shall meet the requirements of the accompanying technical documents; 4 Finish surfaces of exposed fan parts shall be rustless; major parts and components, like rotor impeller wheel/axle neck, gear surface, and gear wheel shaft neck, shall be free of bumping or obvious deformation; 5 The rustproof packaging of fan shall be in good order and condition; the air inlet and outlet of factory assembled fans shall be shielded with cover plates, and kept from dust and sundries entering. 6 The protection measures shall be taken after the surface inspection for exposed vibration testing positions. 2.1.2 Handling and lifting of fans shall meet the following requirements: 1 For handling and hoisting factory assembled fans, the rope shall not bundled on lifting lugs of rotor/casing or bearing upper covers. 2 For handling and hoisting site assembled fans, the rope shall not damage component surface; rotor/gear axle neck or vibration testing position shall not be used as rope bundling positions; rotor and casing shall keep horizontal while hoisting. 3 The protective layer coated on fan rotor and casing for conveying special media shall be protected well from damage; 4 Rotors or gears shall not directly be rolled or moved on ground. 2.1.3 Besides the relevant requirements of "General Code for Construction and Acceptance of Mechanical Equipment Installation Engineering" GB 50231 and the accompanying technical document, the cleaning and inspection of fans before assembling shall also meet the following requirements: 1 Exposed finish surface, assembling fitting surface, sliding surface, as well as pipe, oil tank and vessel, for the equipment, shall be washed and cleaned, factory-assembled assembly parts shall be unpicked and washed if they exceed rust prevention period. 2 As for the compressors to convey combustible and explosive gases like hydrogen and oxygen, the parts, component, pipes as well as the accessories shall be de-oiled, and the oil residue level after de-oiling shall not be larger than 125 mg/m2; they shall be blown dry with dry air or nitrogen after de-oiling, and treated with oil-free sealing; 3 Oil pump, filter, oil cooler, safety valve, etc., equipped in lubricating system and sealing system shall be dismantled and cleaned; 4 The tightness test shall be conducted for oil cooler at maximum working pressure, and the oil cooler shall have no leakage, 10 min after pressure maintaining; 5 In the site assembly, mating surfaces and machining surface of the machine, surface of rotatable parts, as well as attached equipments of the components, shall be washed and cleaned; the rust, if have, shall be removed, and the rust-proofing measures shall be taken to prevent rusting during installation period; 6 The regulating mechanism shall be washed and cleaned, and it shall rotate smoothly. 2.1.4 Centering for shafts (axes) of fan units shall meet the following requirements: 1 The machine located in shafting or with large mass or great installation difficulty shall be selected as reference machine for centering. 2 Non-reference machine shall be centered and leveled on the base of reference machine, and the shafting of the unit in work shall be made continuous smooth curve equivalent to the lift on both ends; 3 The final centering of the unit shafting shall be conducted by practical rotor passing through the coupling, and it shall meet the requirements of items 1 and 2 in this article. 2.1.5 The end clearance, radial displacement and axial slope of the coupling shall meet the provisions of the accompanying technical documents; if no provisions related are available, the relevant provisions stated in the current national standard "General Code for Construction and Acceptance of Mechanical Equipment Installation Engineering" GB 50231 shall apply. 2.1.6 Besides the relevant requirements in the current national standards "Code for Construction and Acceptance of Industrial Metallic Piping" GB 50235 and "Code of Acceptance for Construction Quality of Ventilation and Air Conditioning Works" GB 50243, the air inlet, gas exhaust piping and other pipelines of fans shall meet the following requirements: 1 The pipeline, large valve, regulating device, cooling device and lubricating oil system, etc. of fan air inlet and gas exhaust systems, shall be provided with independent support. Such supports shall be connected firmly with the base or other buildings; for connecting with the fan casting, the external force shall not be applied on the fan casting. After the connection, the installation level and main clearance of the units shall be re-measured, and they shall meet the requirements of the accompanying technical documents;
Contents of GB 50275-2010
Contents 1 General Provisions 2 Fan 2.1 Basic Requirements 2.2 Centrifugal Fan 2.3 Axial Fan 2.4 Roots and Jaeger Blower 2.5 Centrifugal Blower 2.6 Axial Blower 2.7 Anti-explosion Fan and Firefighting Smoke Extractor Fan 3 Compressor 3.1 Basic requirements 3.2 Factory Assembled Compressor 3.3 Site Assembled Reciprocating Compressor 3.4 Attached Equipments 3.5 Test run 3.6 Nonlubricated Compressor 3.7 Screw Type Compressors 3.8 Centrifugal Compressor and Axial Flow Compressor 4 Pump 4.1 Basic Requirements 4.2 Centrifugal Pump 4.3 Well Pump 4.4 Mixed-flow Pump, Axial Pump and Vortex Pump 4.5 Reciprocating Pump 4.6 Membrane Pump and Metering Pump 4.7 Screw Pump, Gear Pump and Rotor Pump 4.8 Water-ring Vacuum Pump 5 Engineering Acceptance Appendix A Vibration Testing and Limits of Fan, Compressor and Pump Appendix B Cleanness testing and limits of compressor and pump Appendix C Requirements on Configuration of Pump Suction and Discharge Line Explanation of Wording List of Quoted Standards
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB 50275-2010, GB/T 50275-2010, GBT 50275-2010, GB50275-2010, GB 50275, GB50275, GB/T50275-2010, GB/T 50275, GB/T50275, GBT50275-2010, GBT 50275, GBT50275