2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/SY 4118-2010
SY 4118-2010   Technical Code for Construction of Gathering and Transmission Distributing Station Projects in Highly Hydrogen Sulfide Gas Field (English Version)
Standard No.: SY 4118-2010 Status:abolished remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 10000 words Translation Price(USD):250.0 remind me the price change

Email:

Implemented on:2010-12-15 Delivery: via email in 1 business day

→ → →

2017-05-01,2017-5-1,2010-12-15,141137711623179892AE4B5451792
Standard No.: SY 4118-2010
English Name: Technical Code for Construction of Gathering and Transmission Distributing Station Projects in Highly Hydrogen Sulfide Gas Field
Chinese Name: 高含硫化氢气田集输场站工程施工技术规范
Chinese Classification: P94    Metal equipment and process pipe installation engineering
Professional Classification: SY    Professional Standard - Oil & Gas
Source Content Issued by: National Energy Administration
Issued on: 2010-08-27
Implemented on: 2010-12-15
Status: abolished
Superseded by:SY/T 4118-2016
Superseded on:2017-5-1
Abolished on:2017-05-01
Target Language: English
File Format: PDF
Word Count: 10000 words
Translation Price(USD): 250.0
Delivery: via email in 1 business day
1 General Provisions 1.0.1 This code is formulated with a view to ensuring the construction quality of gathering and transmission distributing station project in highly hydrogen sulfide gas field and of purification plant project and enabling the installation project achieving advanced technology, economy and rationality, safety and usability and reliable quality. 1.0.2 This code is applicable to the construction of newly-built, expanded and renovated gathering and transmission distributing station project in oil and gas field with H2S volume fraction greater than or equal to 5% in natural gas and of purification plant process installation project in contact with highly hydrogen sulfide gas medium. 1.0.3 This code is one of highly hydrogen sulfide gas field ground project series codes, emphasizes the acceptance, inspection, keeping, marking and release of equipment and pipeline system of highly hydrogen sulfide natural gas, improves the assembly, welding, inspection and heat treatment requirements of pipeline components, strengthens the purging pressure test and final test requirements of equipment and pipeline system, is a supplement of technical requirements for the development of gas field containing H2S, and does not replace other technical codes with respect to the construction and acceptance of gathering and transmission distributing station and natural gas purification plant. 1.0.4 The construction of highly hydrogen sulfide gas field shall not only comply with this code, but also those in the current relevant ones of the nation.
Contents 1 General Provisions 2 Terms 3 Acceptance and Storage of Equipment, Materials and Pipeline Components 3.1 General Requirements 3.2 Steel Pipes 3.3 Hot-bent Elbows 3.4 Valves 3.5 Other Pipeline Components 3.6 Welding Materials 3.7 Anti-corrosion Heat-insulating Materials 3.8 Equipment 4 Installation of Static Equipment and Skid 5 Installation of Mobile Equipment 6 Installation of Tower, Tower Frame, Torch and Tail Gas Funnel 7 Prefabrication and Installation of Process Pipeline 7.1 General Requirements 7.2 Pipeline Prefabrication 7.3 Pipeline Installation 7.4 Valve Installation 8 Pipeline Welding and Inspection 9 Heat Treatment of Welds 10 Purging, Cleaning and Pressure Test of Equipment and Process Pipeline System 10.1 General Requirements 10.2 Cleaning and Closing of Equipment 10.3 Purging and Cleaning of Process Pipeline System 10.4 Pressure Test of Equipment and Pipeline System 11 External Anti-corrosion Project of Equipment and Pipeline 12 Insulation Project 13 Single Commissioning Test Run and Intermediate Handover 13.1 Single Commissioning Test Run 13.2 Intermediate Handover 14 Linked Commissioning Test Run and Project Acceptance 14.1 Linked Commissioning Test Run 14.2 Project Handover and Acceptance Explanation of Wording in this Code List of Quoted Standards
Referred in SY 4118-2010:
* GB 150-2011 Pressure Vessels (Collection GB150.1~150.4-2011)
* GB/T 12459-2005 Steel Butt-Welding Seamless Pipe Fittings
* GB 50126-2008 Code for construction of industrial equipment and pipeline insulation engineering
* GB 50231-2009 General code for construction and acceptance of mechanical equipment installation engineering
* GB 50235-2010 Code for construction of industrial metallic piping engineering
* GB 50251-2003 Code for design of gas transmission pipeline engineering
* GB 50275-2010 Code for construction and acceptance of computer, fan and pump installation engineering
* GB 50540-2009 Code for construction of pipe process in oil and gas transmission pipeline station
* SY/T 0043-2006 Standard for painting color of pinelines and equipments in oil-gas field
* SY/T 0407-2012 Specification of Steel Surface Preparation Before Application of Paint
* SY/T 0460-2010 Technical code for construction of equipment and piping installation engineering for natural gas conditioning purification facilities
* SY/T 4117-2010 Technical code for welding of gathering and transmission pipeline in highly hydrogen sulfide gas field
* SY/T 5257-2012 Heating Steel Bend for Oil and Gas Transmission
* JB/T 450-2008 Specification for wrought angle high pressure valves
Code of China
Standard
SY 4118-2010   Technical Code for Construction of Gathering and Transmission Distributing Station Projects in Highly Hydrogen Sulfide Gas Field (English Version)
Standard No.SY 4118-2010
Statusabolished
LanguageEnglish
File FormatPDF
Word Count10000 words
Price(USD)250.0
Implemented on2010-12-15
Deliveryvia email in 1 business day
Detail of SY 4118-2010
Standard No.
SY 4118-2010
English Name
Technical Code for Construction of Gathering and Transmission Distributing Station Projects in Highly Hydrogen Sulfide Gas Field
Chinese Name
高含硫化氢气田集输场站工程施工技术规范
Chinese Classification
P94
Professional Classification
SY
ICS Classification
Issued by
National Energy Administration
Issued on
2010-08-27
Implemented on
2010-12-15
Status
abolished
Superseded by
SY/T 4118-2016
Superseded on
2017-5-1
Abolished on
2017-05-01
Superseding
Language
English
File Format
PDF
Word Count
10000 words
Price(USD)
250.0
Keywords
SY 4118-2010, SY/T 4118-2010, SYT 4118-2010, SY4118-2010, SY 4118, SY4118, SY/T4118-2010, SY/T 4118, SY/T4118, SYT4118-2010, SYT 4118, SYT4118
Introduction of SY 4118-2010
1 General Provisions 1.0.1 This code is formulated with a view to ensuring the construction quality of gathering and transmission distributing station project in highly hydrogen sulfide gas field and of purification plant project and enabling the installation project achieving advanced technology, economy and rationality, safety and usability and reliable quality. 1.0.2 This code is applicable to the construction of newly-built, expanded and renovated gathering and transmission distributing station project in oil and gas field with H2S volume fraction greater than or equal to 5% in natural gas and of purification plant process installation project in contact with highly hydrogen sulfide gas medium. 1.0.3 This code is one of highly hydrogen sulfide gas field ground project series codes, emphasizes the acceptance, inspection, keeping, marking and release of equipment and pipeline system of highly hydrogen sulfide natural gas, improves the assembly, welding, inspection and heat treatment requirements of pipeline components, strengthens the purging pressure test and final test requirements of equipment and pipeline system, is a supplement of technical requirements for the development of gas field containing H2S, and does not replace other technical codes with respect to the construction and acceptance of gathering and transmission distributing station and natural gas purification plant. 1.0.4 The construction of highly hydrogen sulfide gas field shall not only comply with this code, but also those in the current relevant ones of the nation.
Contents of SY 4118-2010
Contents 1 General Provisions 2 Terms 3 Acceptance and Storage of Equipment, Materials and Pipeline Components 3.1 General Requirements 3.2 Steel Pipes 3.3 Hot-bent Elbows 3.4 Valves 3.5 Other Pipeline Components 3.6 Welding Materials 3.7 Anti-corrosion Heat-insulating Materials 3.8 Equipment 4 Installation of Static Equipment and Skid 5 Installation of Mobile Equipment 6 Installation of Tower, Tower Frame, Torch and Tail Gas Funnel 7 Prefabrication and Installation of Process Pipeline 7.1 General Requirements 7.2 Pipeline Prefabrication 7.3 Pipeline Installation 7.4 Valve Installation 8 Pipeline Welding and Inspection 9 Heat Treatment of Welds 10 Purging, Cleaning and Pressure Test of Equipment and Process Pipeline System 10.1 General Requirements 10.2 Cleaning and Closing of Equipment 10.3 Purging and Cleaning of Process Pipeline System 10.4 Pressure Test of Equipment and Pipeline System 11 External Anti-corrosion Project of Equipment and Pipeline 12 Insulation Project 13 Single Commissioning Test Run and Intermediate Handover 13.1 Single Commissioning Test Run 13.2 Intermediate Handover 14 Linked Commissioning Test Run and Project Acceptance 14.1 Linked Commissioning Test Run 14.2 Project Handover and Acceptance Explanation of Wording in this Code List of Quoted Standards
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
SY 4118-2010, SY/T 4118-2010, SYT 4118-2010, SY4118-2010, SY 4118, SY4118, SY/T4118-2010, SY/T 4118, SY/T4118, SYT4118-2010, SYT 4118, SYT4118