2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/SY 4204-2007
SY 4204-2007   Code for Quality Acceptance of Oil and Gas Construction Engineering - Oil-gas Field Gathering and Transportation Pipeline Engineering (English Version)
Standard No.: SY 4204-2007 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 12000 words Translation Price(USD):300.0 remind me the price change

Email:

Implemented on:2008-3-1 Delivery: via email in 1 business day

→ → →

2016-06-01,2016-6-1,2008-3-1,1411375623757225EA6C5043E9C34
Standard No.: SY 4204-2007
English Name: Code for Quality Acceptance of Oil and Gas Construction Engineering - Oil-gas Field Gathering and Transportation Pipeline Engineering
Chinese Name: 石油天然气建设工程施工质量验收规范
Chinese Classification: P94    Metal equipment and process pipe installation engineering
Professional Classification: SY    Professional Standard - Oil & Gas
Source Content Issued by: the National Development and Reform Commission
Issued on: 2007-10-08
Implemented on: 2008-3-1
Status: superseded
Superseded by:SY 4204-2016
Superseded on:2016-6-1
Abolished on:2016-06-01
Target Language: English
File Format: PDF
Word Count: 12000 words
Translation Price(USD): 300.0
Delivery: via email in 1 business day
This code specifies the division, content and quality acceptance procedure and standard of the unit project, subsection project and subitem project of oil-gas field gathering and transportation pipeline engineering for oil and gas construction engineering, the site quality control and quality control method of oil-gas field gathering and transportation pipeline engineering, as well as the sampling scheme for the quality inspection of inspection lot. This code is applicable to the quality acceptance of oil-gas field gathering and transportation pipeline engineering except large and medium crossing and aerial crossing engineering as well as valve room process pipeline erection engineering.
Foreword I 1 Scope 1 2 Normative References 1 3 Terms and Definitions 1 4 General Provisions 2 5 Basic Requirements 2 6 Division of the Unit Project, Subsection Project And Subitem Project Of Oil-Gas Field Gathering and Transportation Pipeline 3 7 Pipeline Prefabricating 4 8 Pipe Ditch Excavation 5 9 Pipeline Assembling 6 10 Pipeline Welding 7 11 Repaired Mouth and Defect of Pipeline Anticorrosive Coating 9 12 Pipeline Insulation 10 13 Pipeline Ditching and Backfilling 11 14 Pipeline Purging and Pressure Test 12 15 Gas pipeline Drying 14 16 Minitype Crossing Engineering 15 17 Minitype Aerial Crossing Engineering 15 18 Sacrificial Anode Cathodic Protection Engineering 16 19 Impressed Current Cathodic Protection Engineering 17 20 Line Block Valve Chamber 18 21 Mileage Stake, Corner Stake and Testing Stake 19 22 Line Protection Structure Engineering 20 23 Engineering Delivery and Acceptance 21 Appendix A (Normative) Quality Acceptance Record of Inspection Lot 22 Appendix B (Normative) Quality Control Data Verification Record Sheet of Oil-Gas Field Gathering and Transportation Engineering 42 Appendix C (Normative) Instruments for Project Quality Inspection 44
Referred in SY 4204-2007:
* GB/T 8923-1988
* SY/T 0413-
* SY/T 4103-2006 Welding and acceptance standard for steel Pipings and pipelines
* SY/T 4109-2013 Nondestructive Testing Standard of Oil and Gas Steel Pipeline
* SY 4200-2007 Code for Quality Acceptance of Oil and Gas Construction Engineering
SY 4204-2007 is referred in:
* SY 4213-2010 Code for Quality Acceptance of Oil and Gas Construction Engineering—Gathering and Transmission Pipelining Projects in Highly Hydrogen Sulfide Gas Field
* SY 4213-2010 Code for Quality Acceptance of Oil and Gas Construction Engineering—Gathering and Transmission Pipelining Projects in Highly Hydrogen Sulfide Gas Field
Code of China
Standard
SY 4204-2007  Code for Quality Acceptance of Oil and Gas Construction Engineering - Oil-gas Field Gathering and Transportation Pipeline Engineering (English Version)
Standard No.SY 4204-2007
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count12000 words
Price(USD)300.0
Implemented on2008-3-1
Deliveryvia email in 1 business day
Detail of SY 4204-2007
Standard No.
SY 4204-2007
English Name
Code for Quality Acceptance of Oil and Gas Construction Engineering - Oil-gas Field Gathering and Transportation Pipeline Engineering
Chinese Name
石油天然气建设工程施工质量验收规范
Chinese Classification
P94
Professional Classification
SY
ICS Classification
Issued by
the National Development and Reform Commission
Issued on
2007-10-08
Implemented on
2008-3-1
Status
superseded
Superseded by
SY 4204-2016
Superseded on
2016-6-1
Abolished on
2016-06-01
Superseding
Language
English
File Format
PDF
Word Count
12000 words
Price(USD)
300.0
Keywords
SY 4204-2007, SY/T 4204-2007, SYT 4204-2007, SY4204-2007, SY 4204, SY4204, SY/T4204-2007, SY/T 4204, SY/T4204, SYT4204-2007, SYT 4204, SYT4204
Introduction of SY 4204-2007
This code specifies the division, content and quality acceptance procedure and standard of the unit project, subsection project and subitem project of oil-gas field gathering and transportation pipeline engineering for oil and gas construction engineering, the site quality control and quality control method of oil-gas field gathering and transportation pipeline engineering, as well as the sampling scheme for the quality inspection of inspection lot. This code is applicable to the quality acceptance of oil-gas field gathering and transportation pipeline engineering except large and medium crossing and aerial crossing engineering as well as valve room process pipeline erection engineering.
Contents of SY 4204-2007
Foreword I 1 Scope 1 2 Normative References 1 3 Terms and Definitions 1 4 General Provisions 2 5 Basic Requirements 2 6 Division of the Unit Project, Subsection Project And Subitem Project Of Oil-Gas Field Gathering and Transportation Pipeline 3 7 Pipeline Prefabricating 4 8 Pipe Ditch Excavation 5 9 Pipeline Assembling 6 10 Pipeline Welding 7 11 Repaired Mouth and Defect of Pipeline Anticorrosive Coating 9 12 Pipeline Insulation 10 13 Pipeline Ditching and Backfilling 11 14 Pipeline Purging and Pressure Test 12 15 Gas pipeline Drying 14 16 Minitype Crossing Engineering 15 17 Minitype Aerial Crossing Engineering 15 18 Sacrificial Anode Cathodic Protection Engineering 16 19 Impressed Current Cathodic Protection Engineering 17 20 Line Block Valve Chamber 18 21 Mileage Stake, Corner Stake and Testing Stake 19 22 Line Protection Structure Engineering 20 23 Engineering Delivery and Acceptance 21 Appendix A (Normative) Quality Acceptance Record of Inspection Lot 22 Appendix B (Normative) Quality Control Data Verification Record Sheet of Oil-Gas Field Gathering and Transportation Engineering 42 Appendix C (Normative) Instruments for Project Quality Inspection 44
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
SY 4204-2007, SY/T 4204-2007, SYT 4204-2007, SY4204-2007, SY 4204, SY4204, SY/T4204-2007, SY/T 4204, SY/T4204, SYT4204-2007, SYT 4204, SYT4204