2025-12-13 216.73.216.3
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/TB 10419-2003
TB 10419-2003   Standard for constructional quality acceptance of railway signal engineering (English Version)
Standard No.: TB 10419-2003 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 28000 words Translation Price(USD):560.0 remind me the price change

Email:

Implemented on:2004-1-1 Delivery: via email in 1 business day

→ → →

,2019-2-1,2004-1-1,141137415787279B10A6D0F667CE0
Standard No.: TB 10419-2003
English Name: Standard for constructional quality acceptance of railway signal engineering
Chinese Name: 铁路信号工程施工质量验收标准
Chinese Classification: P65    Railway engineering
Professional Classification: TB    Professional Standard - Railway Transport
Source Content Issued by: MOR
Issued on: 2003-12-16
Implemented on: 2004-1-1
Status: superseded
Superseded by:TB 10419-2018 Standard for Acceptance of Signaling Works in Railway
Superseded on:2019-2-1
Superseding:TB 10419-2000 Standard for quality inspection and assessment of railway signaling engineering
Target Language: English
File Format: PDF
Word Count: 28000 words
Translation Price(USD): 560.0
Delivery: via email in 1 business day
Standard for Constructional Quality Acceptance of Railway Signal Engineering 1 General Provisions 1.0.1 This standard is formulated with a view to strengthening the constructional quality management of railway engineering, unifying the constructional quality acceptance of railway signal engineering and ensuring the engineering quality. 1.0.2 This standard is applicable to the constructional quality acceptance of constructed and renovated standard gauge railway signal engineering for passenger trains with design travelling speed of or less than 160km/h sharing railways with freight trains. Complementary standards shall be developed separately for the constructional quality acceptance of other railway signal engineering as well as the new technology, process, equipment and material that are not covered in this standard. 1.0.3 The construction organization, as the main body of constructional quality control of engineering, shall conduct whole-process control on the constructional quality of engineering; the parties concerned, including development organization, supervision organization and survey and design organization shall control the engineering quality of construction stage in accordance with the relevant regulations. 1.0.4 The construction of railway signal engineering shall implement the sustainable development strategy of national economy, properly fulfill such works as environmental protection and water & soil conservation, rationally utilize the resources and accomplish civilized and safe construction. 1.0.5 The quality data acquired in the inspection and testing on the constructional quality of railway signal engineering shall be true and reliable and comprehensively reflect the condition of engineering quality, and the methods and instruments adopted shall be in accordance with those specified in the relevant standards. 1.0.6 The constructional quality requirements in contract agreement document and engineering technical documents adopted in railway signal engineering construction shall not be lower than those in this standard. 1.0.7 The constructional quality acceptance of railway signal engineering shall meet the requirements stipulated in this standard and those in relevant current national standards. 2 Terms 2.0.1 constructional quality of engineering summation of all obvious and implied characteristics on aspects such as safety, use function, durability and environmental protection, for reflecting that the engineering construction process or the entity meets those specified in the relevant standards or stipulated in the Contract 2.0.2 acceptance confirmation, in written form, on whether the engineering quality is acceptable according to relevant standards, upon inspection for quality of inspection lot and subitem, divisional and unit projects by the organizations concerned with construction activities, under the premise that the constructional quality of engineering is acceptable upon self-inspection and evaluation of the construction organization 2.0.3 site acceptance inspection for materials, members, accessories, equipment, etc. delivered to the construction site according to the requirements of relevant standards to confirm whether they are acceptable 2.0.4 inspection lot an inspection unit composed of certain samples used for inspection and gathered according to the same production conditions or in required mode 2.0.5 inspection activity of conducting measurement, inspection and test for the performance of inspection items and comparing the results and the standard requirements to determine the conformity of all performance items 2.0.6 witness activity that the supervision organization or development organization supervises the completion condition of certain process by construction organization on site 2.0.7 evidential testing testing carried out on the sample sent after being taken on site by the relevant personnel of construction organization under the supervision of the supervision organization or the development organization 2.0.8 parallel acceptance testing inspection or testing activity carried out independently by the supervision organization according to certain proportion by using certain inspection or testing means based on the self-inspection of construction organization 2.0.9 stop and supervision supervisory activity conducted by supervisors on site during construction of critical part or working procedure of the engineering 2.0.10 constructional procedure operation activity with relative independent characteristics or operation activity divided by necessary technical intermittent and pause during construction, which is the basic unit of construction process 2.0.11 handing over inspection activity that the construction undertaking party and completing party jointly carry out inspection and confirm whether the construction can be continued 2.0.12 dominant item inspection item playing a decisive role in safety, health, environmental protection and public interest 2.0.13 general item inspection item other than the dominant item 2.0.14 sampling inspection inspection carried out by collecting a certain amount of samples randomly from the site materials, members, accessories, equipment or engineering inspection items of each inspection lot according to the specified sampling scheme 2.0.15 sampling scheme method to determine the sampling quantity according to the characteristic of inspection items 2.0.16 counting inspection inspection method for recording a certain property or calculating the number of defects of each unit among the samples 2.0.17 quantitative inspection inspection method for measuring a certain quantitative characteristic of each unit among the samples for sampling inspection 2.0.18 quality of appearance external quality of engineering reflected by observation and necessary measurement 2.0.19 rework measures like re-fabrication or re-construction for rejected engineering position 2.0.20 repair measures like renovation for the position failing to meet the standard requirements in the engineering 2.0.21 common defect defect without decisive effect on stress performance or service performance of structural member 2.0.22 serious defect defect with decisive effect on stress performance or service performance of structural member
Foreword i 1 General Provisions 2 Terms 3 Basic Requirements 3.1 General Requirements 3.2 Division of the Constructional Quality Acceptance of Engineering 3.3 Constructional Quality Acceptance of Engineering 3.4 Procedure and Organization for Constructional Quality Acceptance of Engineering 4 Fixed Trackside Signal 4.1 General Requirements 4.2 High Color Light Signal 4.3 Dwarf Color Light Signal 4.4 Signal Signboard 5 Switch Device 5.1 General Requirements 5.2 Installation Device 5.3 Electric Lock and Turnout Lever 5.4 Switch-and-lock Mechanism and Pipe Guide 5.5 Switch Machine 5.6 Switch Indicator and Interlocking Derailer 5.7 Separated External Locking Switch Device 6 Track Circuit 6.1 General Requirements 6.2 Track Circuit Trackside Equipment 6.3 Steel Rail Insulation 6.4 Steel Rail Fixture Wire 6.5 Steel Rail Bond Wire 6.6 Turnout Jumper Wire 7 Electrical (Optical) Cable Line 7.1 General Requirements 7.2 Cable Line Laying 7.3 Cable Protection 7.4 Cable Connection 7.5 Optic Cable Line 7.6 Installation of Boxes 8 Indoor Equipment 8.1 General Requirements 8.2 Control Equipment 8.3 Manual Release Button Panel 8.4 Equipment Cabinet (Rack) 8.5 Distributing Terminal Board (Cabinet) 8.6 Cable Room 8.7 Power Supply Equipment 9 Signal Equipment and Overspeed Protection Equipment of Locomotive 9.1 General Requirements 9.2 On-board Equipment 9.3 Ground Equipment 10 Special Equipment of Hump Signal 10.1 General Requirements 10.2 Power Equipment 10.3 Pipeline 10.4 Vehicle Retarder 10.5 Speed Measuring Device, Length Measuring Device, Weight Measuring Device and Wheel Sensor 10.6 Vehicle Gauge Checker 11 Other Signal Equipment 11.1 Lightning Protection and Earthing Device 11.2 Protection of Signal Equipment in Electrified Section 11.3 Installation of Axle Counter Outdoor Equipment 11.4 Crossing Signal 11.5 Locomotive Agreement Button Panel 11.6 Departure Indicator 11.7 Hardening of Outdoor Signal Equipment 12 Interlocking Test 12.1 General Requirements 12.2 Indoor Individual Test 12.3 Outdoor Individual Test 12.4 Integrated Test 13 Assessment on Quality of Appearance of the Unit Project 13.1 General Requirements 13.2 Foundation 13.3 Signal Machine and Mechanism 13.4 Various Boxes and Trackside Equipment 13.5 Equipment & Apparatus 13.6 Panel, Cabinet and Rack 13.7 Switch Device 13.8 Identification and Sign 13.9 Indoor and Outdoor Wiring Annex A Record Sheet of Station Signal Interlocking Test Annex B Record Sheet of Shift Frequency Automatic Blocking Interlocking Test Annex C Record Sheet of Hump Signal Interlocking Test Annex D Intersection and Parallel Protection Standard of Outdoor Signal Cables and Other Pipelines and Buildings Explanation of Wording in This Standard
Code of China
Standard
TB 10419-2003  Standard for constructional quality acceptance of railway signal engineering (English Version)
Standard No.TB 10419-2003
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count28000 words
Price(USD)560.0
Implemented on2004-1-1
Deliveryvia email in 1 business day
Detail of TB 10419-2003
Standard No.
TB 10419-2003
English Name
Standard for constructional quality acceptance of railway signal engineering
Chinese Name
铁路信号工程施工质量验收标准
Chinese Classification
P65
Professional Classification
TB
ICS Classification
Issued by
MOR
Issued on
2003-12-16
Implemented on
2004-1-1
Status
superseded
Superseded by
TB 10419-2018 Standard for Acceptance of Signaling Works in Railway
Superseded on
2019-2-1
Abolished on
Superseding
TB 10419-2000 Standard for quality inspection and assessment of railway signaling engineering
Language
English
File Format
PDF
Word Count
28000 words
Price(USD)
560.0
Keywords
TB 10419-2003, TB/T 10419-2003, TBT 10419-2003, TB10419-2003, TB 10419, TB10419, TB/T10419-2003, TB/T 10419, TB/T10419, TBT10419-2003, TBT 10419, TBT10419
Introduction of TB 10419-2003
Standard for Constructional Quality Acceptance of Railway Signal Engineering 1 General Provisions 1.0.1 This standard is formulated with a view to strengthening the constructional quality management of railway engineering, unifying the constructional quality acceptance of railway signal engineering and ensuring the engineering quality. 1.0.2 This standard is applicable to the constructional quality acceptance of constructed and renovated standard gauge railway signal engineering for passenger trains with design travelling speed of or less than 160km/h sharing railways with freight trains. Complementary standards shall be developed separately for the constructional quality acceptance of other railway signal engineering as well as the new technology, process, equipment and material that are not covered in this standard. 1.0.3 The construction organization, as the main body of constructional quality control of engineering, shall conduct whole-process control on the constructional quality of engineering; the parties concerned, including development organization, supervision organization and survey and design organization shall control the engineering quality of construction stage in accordance with the relevant regulations. 1.0.4 The construction of railway signal engineering shall implement the sustainable development strategy of national economy, properly fulfill such works as environmental protection and water & soil conservation, rationally utilize the resources and accomplish civilized and safe construction. 1.0.5 The quality data acquired in the inspection and testing on the constructional quality of railway signal engineering shall be true and reliable and comprehensively reflect the condition of engineering quality, and the methods and instruments adopted shall be in accordance with those specified in the relevant standards. 1.0.6 The constructional quality requirements in contract agreement document and engineering technical documents adopted in railway signal engineering construction shall not be lower than those in this standard. 1.0.7 The constructional quality acceptance of railway signal engineering shall meet the requirements stipulated in this standard and those in relevant current national standards. 2 Terms 2.0.1 constructional quality of engineering summation of all obvious and implied characteristics on aspects such as safety, use function, durability and environmental protection, for reflecting that the engineering construction process or the entity meets those specified in the relevant standards or stipulated in the Contract 2.0.2 acceptance confirmation, in written form, on whether the engineering quality is acceptable according to relevant standards, upon inspection for quality of inspection lot and subitem, divisional and unit projects by the organizations concerned with construction activities, under the premise that the constructional quality of engineering is acceptable upon self-inspection and evaluation of the construction organization 2.0.3 site acceptance inspection for materials, members, accessories, equipment, etc. delivered to the construction site according to the requirements of relevant standards to confirm whether they are acceptable 2.0.4 inspection lot an inspection unit composed of certain samples used for inspection and gathered according to the same production conditions or in required mode 2.0.5 inspection activity of conducting measurement, inspection and test for the performance of inspection items and comparing the results and the standard requirements to determine the conformity of all performance items 2.0.6 witness activity that the supervision organization or development organization supervises the completion condition of certain process by construction organization on site 2.0.7 evidential testing testing carried out on the sample sent after being taken on site by the relevant personnel of construction organization under the supervision of the supervision organization or the development organization 2.0.8 parallel acceptance testing inspection or testing activity carried out independently by the supervision organization according to certain proportion by using certain inspection or testing means based on the self-inspection of construction organization 2.0.9 stop and supervision supervisory activity conducted by supervisors on site during construction of critical part or working procedure of the engineering 2.0.10 constructional procedure operation activity with relative independent characteristics or operation activity divided by necessary technical intermittent and pause during construction, which is the basic unit of construction process 2.0.11 handing over inspection activity that the construction undertaking party and completing party jointly carry out inspection and confirm whether the construction can be continued 2.0.12 dominant item inspection item playing a decisive role in safety, health, environmental protection and public interest 2.0.13 general item inspection item other than the dominant item 2.0.14 sampling inspection inspection carried out by collecting a certain amount of samples randomly from the site materials, members, accessories, equipment or engineering inspection items of each inspection lot according to the specified sampling scheme 2.0.15 sampling scheme method to determine the sampling quantity according to the characteristic of inspection items 2.0.16 counting inspection inspection method for recording a certain property or calculating the number of defects of each unit among the samples 2.0.17 quantitative inspection inspection method for measuring a certain quantitative characteristic of each unit among the samples for sampling inspection 2.0.18 quality of appearance external quality of engineering reflected by observation and necessary measurement 2.0.19 rework measures like re-fabrication or re-construction for rejected engineering position 2.0.20 repair measures like renovation for the position failing to meet the standard requirements in the engineering 2.0.21 common defect defect without decisive effect on stress performance or service performance of structural member 2.0.22 serious defect defect with decisive effect on stress performance or service performance of structural member
Contents of TB 10419-2003
Foreword i 1 General Provisions 2 Terms 3 Basic Requirements 3.1 General Requirements 3.2 Division of the Constructional Quality Acceptance of Engineering 3.3 Constructional Quality Acceptance of Engineering 3.4 Procedure and Organization for Constructional Quality Acceptance of Engineering 4 Fixed Trackside Signal 4.1 General Requirements 4.2 High Color Light Signal 4.3 Dwarf Color Light Signal 4.4 Signal Signboard 5 Switch Device 5.1 General Requirements 5.2 Installation Device 5.3 Electric Lock and Turnout Lever 5.4 Switch-and-lock Mechanism and Pipe Guide 5.5 Switch Machine 5.6 Switch Indicator and Interlocking Derailer 5.7 Separated External Locking Switch Device 6 Track Circuit 6.1 General Requirements 6.2 Track Circuit Trackside Equipment 6.3 Steel Rail Insulation 6.4 Steel Rail Fixture Wire 6.5 Steel Rail Bond Wire 6.6 Turnout Jumper Wire 7 Electrical (Optical) Cable Line 7.1 General Requirements 7.2 Cable Line Laying 7.3 Cable Protection 7.4 Cable Connection 7.5 Optic Cable Line 7.6 Installation of Boxes 8 Indoor Equipment 8.1 General Requirements 8.2 Control Equipment 8.3 Manual Release Button Panel 8.4 Equipment Cabinet (Rack) 8.5 Distributing Terminal Board (Cabinet) 8.6 Cable Room 8.7 Power Supply Equipment 9 Signal Equipment and Overspeed Protection Equipment of Locomotive 9.1 General Requirements 9.2 On-board Equipment 9.3 Ground Equipment 10 Special Equipment of Hump Signal 10.1 General Requirements 10.2 Power Equipment 10.3 Pipeline 10.4 Vehicle Retarder 10.5 Speed Measuring Device, Length Measuring Device, Weight Measuring Device and Wheel Sensor 10.6 Vehicle Gauge Checker 11 Other Signal Equipment 11.1 Lightning Protection and Earthing Device 11.2 Protection of Signal Equipment in Electrified Section 11.3 Installation of Axle Counter Outdoor Equipment 11.4 Crossing Signal 11.5 Locomotive Agreement Button Panel 11.6 Departure Indicator 11.7 Hardening of Outdoor Signal Equipment 12 Interlocking Test 12.1 General Requirements 12.2 Indoor Individual Test 12.3 Outdoor Individual Test 12.4 Integrated Test 13 Assessment on Quality of Appearance of the Unit Project 13.1 General Requirements 13.2 Foundation 13.3 Signal Machine and Mechanism 13.4 Various Boxes and Trackside Equipment 13.5 Equipment & Apparatus 13.6 Panel, Cabinet and Rack 13.7 Switch Device 13.8 Identification and Sign 13.9 Indoor and Outdoor Wiring Annex A Record Sheet of Station Signal Interlocking Test Annex B Record Sheet of Shift Frequency Automatic Blocking Interlocking Test Annex C Record Sheet of Hump Signal Interlocking Test Annex D Intersection and Parallel Protection Standard of Outdoor Signal Cables and Other Pipelines and Buildings Explanation of Wording in This Standard
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
TB 10419-2003, TB/T 10419-2003, TBT 10419-2003, TB10419-2003, TB 10419, TB10419, TB/T10419-2003, TB/T 10419, TB/T10419, TBT10419-2003, TBT 10419, TBT10419