2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/TB/T 2344-2012
TB/T 2344-2012   Technical specifications for the procurement of 43 kg/m ~ 75 kg/ m rails (English Version)
Standard No.: TB/T 2344-2012 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 15000 words Translation Price(USD):180.0 remind me the price change

Email:

Implemented on:2012-6-1 Delivery: via email in 1 business day

→ → →

,2017-10-12,2012-6-1,BC1862110727168B1412780291740
Standard No.: TB/T 2344-2012
English Name: Technical specifications for the procurement of 43 kg/m ~ 75 kg/ m rails
Chinese Name: 43kg/m~75kg/m钢轨订货技术条件
Professional Classification: TB    Professional Standard - Railway Transport
Source Content Issued by: Ministry of Railways
Issued on: 2012-6-1
Implemented on: 2012-6-1
Status: superseded
Superseded by:TB/T 2344-2012/XG1-2017 Technical specifications for the procurement of 43 kg/m ~ 75 kg/m rails , includes Amendment 1
TB/T 2344.1-2020 Requirements for domain name service business continuity rnanagernent
Superseded on:2017-10-12
Superseding:TB/T 2635-2004 Technical specification for the heat treated rails
TB/T 2344-2003 Technical specifications for the procurement of 43 kg/m~75kg/m as rolled rails
Target Language: English
File Format: PDF
Word Count: 15000 words
Translation Price(USD): 180.0
Delivery: via email in 1 business day
Codeofchina.com is in charge of this English translation. In case of any doubt about the English translation, the Chinese original shall be considered authoritative. This standard was drafted according to the rules specified in GB/T 1.1-2009. This standard supersedes “Technical Specifications for the Procurement of 43 kg/m~75kg/m As-rolled Rails” (TB/T 2344-2003) and partially supersedes “Technical Specifications for the Heat-treated Rails" (TB/T 2635-2004). Based on TB/T 2344-2003, this standard partially incorporated TB/T 2635-2004, and compared with TB/T 2344-2003, mainly has the following technical changes besides the editorial changes: - ordering information was added (see Chapter 4); - requirements of geometric dimensions were modified and supplemented (see 5.1; 4.1 in Edition 2003); - the straightness requirement was modified (see 5.2, 4.2 in Edition 2003); - specified length and undergauge rail length were added (see 5.5); - steel density was modified (see 5.5; 4.4 in Edition 2003); The requirements of steel designation, chemical composition range and gas content were modified and added (see 6.2; 5.2 in Edition 2003); - hardness requirements for hot rolled and online heat-treated rails were added (see 6.4); - the requirement of nonmetallic inclusion was modified (see 6.7; 5.9 in Edition 2003); - the requirement of surface quality was modified (see 6.10; 5.12 in Edition 2003); - the requirement of fatigue crack growth was added (see 6.14); - the requirement of numerical rounding was added (see 8.5). Attention is drawn to the possibility that some of the contents of this document may be the subject of patent rights. Issue organization of this standard isn't held responsible for identifying any or all such patent rights. This standard was proposed by and is under the jurisdiction of Standards and Metrology Research Institute of MOR. Drafting organizations of this standard: Metal and Chemistry Research Institute of China Academy of Railway Sciences, Standards and Metrology Research Institute of MOR, Ansteel Group Co., Ltd., Anshan Iron and Steel Group Corporation, Baotou Iron & Steel Group Co., Ltd., Wuhan Iron and Steel (Group) Corporation, Resident Rail Quality Supervision Centers of Ministry of Railways. Chief drafting staff of this standard: Zhang Yinhua, Zhou Qingyue, Wang Shuqing, Zhu Mei, Chen Zhaoyang, Liu Fengshou, Zhang Hong, Zuo Yan, Zhi Jianguo, Wu Jinhua, Lv Xuebin, Dong Huali. PROFESSIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA 中华人民共和国铁道行业标准 TB/T 2344-2012 Supersedes TB/T 2344-2003 Partially supersedes TB/T 2635-2004 Technical Specifications for the Procurement of 43 kg/m~75 kg/m Rails 43 kg/m~75 kg/m钢轨订货技术条件 1 Scope This standard specifies the terms and definitions, ordering information, model dimension and limit deviations, technical requirements, test methods, inspection rules, marking and quality certificate, quality assurance, etc. for 43 kg/m~75 kg/m rails. This standard is applicable to 43 kg/m~75 kg/m hot-rolled and online heat-treated rails for railway with a maximum running speed of 160 km/h. For heat-treated rails for high speed railway, it may apply. 2 Normative References The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB/T 223.14 Methods for Chemical Analysis of Iron, Steel and Alloy - The N-benzoy-N-phenylhydroxylamine Extraction Photometric Method for the Determination of Vanadium Content GB/T 223.49 Methods for Chemical Analysis of Iron, Steel and Alloy Extraction Separation - Chlorophosphonazo mA Spectrophotometric Method for the Determination of the Total Rare Earth Content GB/T 223.60 Methods for Chemical Analysis of Iron, Steel and Alloy - The Perchloric Acid Dehydration Gravimetric Method for the Determination of Silicon Content GB/T 223.62 Methods for Chemical Analysis of Iron, Steel and Alloy - The Butyl Acetate Extraction Photometric Method for the Determination of Phosphorus Content GB/T 223.63 Methods for Chemical Analysis of Iron, Steel and Alloy - The Sodium (Potassium) Periodate Photometric Method for the Determination of Manganese Content GB/T 223.68 Methods for Chemical Analysis of Iron, Steel and Alloy - The Potassium Iodate Titration Method after Combustion in the Pipe Furnace for the Determination of Sulfur Content GB/T 223.71 Methods for Chemical Analysis of Iron, Steel and Alloy - The Gravimetric Method after Combustion in the Pipe Furnace for the Determination of Carbon Content GB/T 223.82 Steel and Iron - Determination of Hydrogen Content - Inert Gas Impulse Fusion Heat Conductivity Method GB/T 226 Etch Test for Macrostructure and Defect of Steels GB/T 228.1 Metallic Materials - Tensile Testing - Part 1: Method of Test at Room Temperature" GB/T 230.1 Metallic Materials - Rockwell Hardness Test Part 1: Test Method GB/T 231.1 Metallic Materials - Brinell Hardness Test - Part 1: Test Method GB/T 3075 Metallic Materials - Fatigue Testing - Axial-force-controlled Method GB/T 4161 Plane strain Fracture Toughness KIC Test Method for Metal Material GB/T 4336 Standard Test Method for Spark Discharge Atomic Emission Spectrometric Analysis of Carbon and Low-alloy Steel (Routine Method) GB/T 4340.1 Metallic Materials-Vickers Hardness Test - Part 1: Test Method GB/T 6398. STANDARD Test Method for Fatigue Crack Growth Rates of Metallic Materials GB/T 10561-2005 Steel Determination of Content of Nonmetallic Inclusions Micrographic Method Using Standards Diagrams GB/T 11261 Steel and Iron - Determination of Oxygen Content - The Pulse Heating Inert Gas Fusion-Infra-red Absorption Method GB/T 13298 Metal-Inspection Method of Microstructure GB/T 19001 Quality Management Systems Requirements GB/T 20066 Steel and Iron - Sampling and Preparation of Samples for the Determination of Chemical Composition GB/T 20123 Steel and Iron - Determination of Total Carbon and Sulfur Content Infrared Absorption Method after Combustion in an Induction Furnace (Routine Method) GB/T 20124 Steel and Iron - Determination of Nitrogen Content - Thermal Conductimetric Method after Fusion in a Current of Inert Gas YB/T 081 Rule for Rounding off of Numerical Values and Judgment of Testing Values for Technical Standards of Metallurgy YB/T 951 Method of the Ultrasonic Inspection for Rails 3 Terms and Definitions For the purpose of this standard, the following terms and definitions apply. 3.1 Heat All the blanks casted with one heat, excluding the first blank casted with the next heat entering into the tundish 3.2 Sequence Continuous casting of different heats of the same designation in tundish 3.3 Transition area Parts casted by two heats 3.4 Online heat-treatment Heat treatment by which fine lamellar pearlite structures are obtained by direct accelerated cooling with the residual heat of rolling. 4 Ordering Information The user shall provide the following basic information for order: a) product name; b) product standard reference; c) rail model; d) steel designation and delivery condition; e) machined condition of rail end (bore number at one or both ends, and with rail end heat treated or not); f) length, quantity and undergauge rate; g) other requirements. 5 Model Dimension, Length, Weight and Limit Deviations 5.1 Model Dimension and Limit Deviations 5.1.1 The model dimensions of rail profile shall meet the requirements of Appendix A. 5.1.2 The dimensional limit deviations of rail profile, end face, length and bolthole shall be in accordance with those specified in Table 1. 5.2 Straightness and Distortion The rail straightness and distortion shall meet those specified in Table 2. Table 1 Dimensional Limit Deviations Unit: mm Item Limit deviation Template drawing a 43 kg/m 50 kg/m, 60 kg/m, 75 kg/m Rail height (H) ±0.6 ±0.6 Figure B.3 Railhead width (WH) ±0.5 ±0.5 Figure B.4 Crest plumpness b(C) +0.6 -0.5 Figure B.5 Profile asymmetry (AB) ±1.5 ±1.2 Figure B.6 Inclination of joint bar mounting face (with reference to the inclination of the 14 mm length parallel to the theoretical bevel of joint bar) (IF) ±0.50 ±0.50 Figure B.7 Height of joint bar mounting face (HF) +0.6 -0.5 +0.6 -0.5 Figure B.7 Web thickness (WT) +1.0 -0.5 +1.0 -0.5 Figure B.8 Foot width (WF) +1.0 -1.5 +1.0 -1.5 Figure B.9 Foot edge thickness (TF) +0.75 -0.5 Figure B.10 Fo recess ≤0.4 ≤0.4 End face inclination (vertical and horizontal) ≤0.8 ≤0.8 Bolthole diameter ±0.8 ±0.8 Figure B.11 Bolthole position ±0.8 ±0.8 Figure B.12 Integrated deviation of bolthole diameter and position(Td/c) 2.0 2.0 Length (20ºC) Welded rail ≤25 m rail ±10 >25 m rail ±30 Holed rail ≤25 m rail ±6 a See Appendix B for the template drawing for geometric dimension check of rail. b No requirement of crest plumpness for 50 kg/m rails. 5.3 Bolthole No bolthole is machined for welded rails. The boltholes, where required, shall be indicated in the contract. The bolthole edge of rail shall be chamfered to 0.8 mm~1.5 mm and 45°. 5.4 Rail End Chamfering The part of holed rail from the rail end/head to the lower rounding shall be chamfered as specified in Appendix A.
Foreword i 1 Scope 2 Normative References 3 Terms and Definitions 4 Ordering Information 5 Model Dimension, Length, Weight and Limit Deviations 5.1 Model Dimension and Limit Deviations 5.2 Straightness and Distortion 5.3 Bolthole 5.4 Rail End Chamfering 5.5 Length and Weight 6 Technical Requirements 6.1 Manufacturing Method 6.2 Designation and Chemical Composition 6.3 Tensile Property 6.4 Hardness 6.5 Microstructure 6.6 Decarburized Layer 6.7 Nonmetallic Inclusion 6.8 Macrostructure 6.9 Drop Weight 6.10 Surface Quality 6.11 Ultrasonic Testing 6.12 Residual Stress of Foot 6.13 Fracture Toughness 6.14 Fatigue Crack Growth 6.15 Fatigue 6.16 Heat Treatment of Rail End 7 Test Method 7.1 Inspection Item, Inspection Frequency, Sampling Position and Test Method 7.2 Hydrogen Content 7.3 Total Oxygen Content and Nitrogen Content 7.4 Hardness 7.5 Microstructure 7.6 Drop weight 7.7 Ultrasonic Testing 7.8 Residual Stress at Rail Root 7.9 Fracture Toughness 7.10 Fatigue Crack Growth 7.11 Fatigue 8 Inspection Rules 8.1 Supervision 8.2 Type Inspection 8.3 Delivery Inspection 8.4 Re-inspection and Judgment 8.5 Numerical Rounding 9 Mark and Quality Certificate 9.1 Mark 9.2 Quality Certification 10 Quality Assurance 10.1 Quality Assurance System 10.2 Quality Guarantee Period Appendix A (Normative) Type and Dimension of 43kg/m ~ 75kg/m Rails Appendix B (Normative) Schematic Diagram for the Geometric Dimension Inspection Template of Rail Appendix C (Normative) Unallowable Defects on the Transversal Acid Leached Test Plate of Rail Appendix D (Normative) Test Method for Rail Plane Strain Fracture Toughness KIC Appendix E (Normative) Heat-Treatment Technical Conditions for Rail End Appendix F (Normative) Measured Method for Longitudinal Residual Stress of Foot
Referred in TB/T 2344-2012:
*GB/T 223.14-2000 Methods for Chemical Analysis of Iron, Steel and Alloy - The N-Benzoy-N-Phenylhydroxylamine Extraction Photometric Method for the Determination of Vanadium Content
*GB/T 223.49-1994 Methods for chemical analysis of iron, steel and alloy Extraction separation-chlorophosphonazo mA spectrophotometric method for the determination of the total rare earth content
*GB/T 223.60-1997 Methods for chemical analysis of iron,steel and alloy The perchloric acid dehydration gravimetric method for the determination of silicon content
*GB/T 223.62-1988 Methods for chemical analysis of iron, steel and alloy; The butyl acetate extraction photometric method for the determination of phosphorus content
*GB/T 223.63-2022 Iron, steel and alloy—Determination of manganese content—Sodium (potassium) periodate spectrophotometric method
*GB/T 223.68-1997 Methods for Chemical Analysis of Iron, Steel and Alloy - The Potassium Iodate Titration Method after Combustion in the Pipe Furnace for the Determination of Sulfur Content
*GB/T 223.71-1997 Methods for Chemical Analysis of Iron, Steel and Alloy the Gravimetric Method after Combustion in the Pipe Furnace for the Determination of Carbon Content
*GB/T 223.82-2018 Steel and iron—Determination of hydrogen content—Thermal conductivity/infrared method after fusion under inert gas
*GB/T 226-2015 Test method for macrostructure and defect of steel by etching
*GB/T 228.1-2021 Metallic materials—Tensile testing—Part 1: Method of test at room temperature
*GB/T 230.1-2018 Metallic materials—Rockwell hardness test—Part 1:Test method
*GB/T 231.1-2018 Metallic materials-Brinell hardness test-Part 1:Test method
*GB/T 3075-2021 Metallic materials—Fatigue testing—Axial force-controlled method
*GB/T 4161-2007 Metallic materials—Determination of plane-strain fracture toughness
*GB/T 4336-2016/XG1-2017 Carbon and low-alloy steel―Determination of multi-element contents―Spark discharge atomic emission spectrometric method (routine method), includes Amendment 1
*GB/T 4340.1-2009 Metallic materials—Vickers hardness test—Part 1:Test method
*GBT6398.-
*GB/T 10561-2005 Steel - Determination of Content of Nonmetallic Inclusions - Micrographic Method Using Standards Diagrams
*GB/T 11261-2006 Steel and Iron-Determination of oxygen content - The pulse heating inert gas fusion-infra-red absorption method
*GB/T 13298-2015 Inspection methods of microstructure for metals
*GB/T 19001-2016 Quality management systems―Requirements
*GB/T 20066-2006 Steel and Iron-Sampling and Preparation of Samples for the Determination of Chemical Composition
*GB/T 20123-2006 Steel and iron—Determination of total carbon and sulfur content Infrared absorption method after combustion in an induction furnace (routine method)
*GB/T 20124-2006 Steel and iron - Determination of nitrogen content - Thermal conductimetric method after fusion in a current of inert gas
*YB/T 081-2013 Rule for Rounding Off of Numberical Values and Judgement of Testing Values for Technical Standards of Metallurgy
*YB/T 951-2014 Method of the ultrasonic testing for rails
TB/T 2344-2012 is referred in:
* YB/T 5055-2014 Crane rails
Code of China
Standard
TB/T 2344-2012  Technical specifications for the procurement of 43 kg/m ~ 75 kg/ m rails (English Version)
Standard No.TB/T 2344-2012
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count15000 words
Price(USD)180.0
Implemented on2012-6-1
Deliveryvia email in 1 business day
Detail of TB/T 2344-2012
Standard No.
TB/T 2344-2012
English Name
Technical specifications for the procurement of 43 kg/m ~ 75 kg/ m rails
Chinese Name
43kg/m~75kg/m钢轨订货技术条件
Chinese Classification
Professional Classification
TB
ICS Classification
Issued by
Ministry of Railways
Issued on
2012-6-1
Implemented on
2012-6-1
Status
superseded
Superseded by
TB/T 2344-2012/XG1-2017 Technical specifications for the procurement of 43 kg/m ~ 75 kg/m rails , includes Amendment 1
TB/T 2344.1-2020 Requirements for domain name service business continuity rnanagernent
Superseded on
2017-10-12
Abolished on
Superseding
TB/T 2635-2004 Technical specification for the heat treated rails
TB/T 2344-2003 Technical specifications for the procurement of 43 kg/m~75kg/m as rolled rails
Language
English
File Format
PDF
Word Count
15000 words
Price(USD)
180.0
Keywords
TB/T 2344-2012, TB 2344-2012, TBT 2344-2012, TB/T2344-2012, TB/T 2344, TB/T2344, TB2344-2012, TB 2344, TB2344, TBT2344-2012, TBT 2344, TBT2344
Introduction of TB/T 2344-2012
Codeofchina.com is in charge of this English translation. In case of any doubt about the English translation, the Chinese original shall be considered authoritative. This standard was drafted according to the rules specified in GB/T 1.1-2009. This standard supersedes “Technical Specifications for the Procurement of 43 kg/m~75kg/m As-rolled Rails” (TB/T 2344-2003) and partially supersedes “Technical Specifications for the Heat-treated Rails" (TB/T 2635-2004). Based on TB/T 2344-2003, this standard partially incorporated TB/T 2635-2004, and compared with TB/T 2344-2003, mainly has the following technical changes besides the editorial changes: - ordering information was added (see Chapter 4); - requirements of geometric dimensions were modified and supplemented (see 5.1; 4.1 in Edition 2003); - the straightness requirement was modified (see 5.2, 4.2 in Edition 2003); - specified length and undergauge rail length were added (see 5.5); - steel density was modified (see 5.5; 4.4 in Edition 2003); The requirements of steel designation, chemical composition range and gas content were modified and added (see 6.2; 5.2 in Edition 2003); - hardness requirements for hot rolled and online heat-treated rails were added (see 6.4); - the requirement of nonmetallic inclusion was modified (see 6.7; 5.9 in Edition 2003); - the requirement of surface quality was modified (see 6.10; 5.12 in Edition 2003); - the requirement of fatigue crack growth was added (see 6.14); - the requirement of numerical rounding was added (see 8.5). Attention is drawn to the possibility that some of the contents of this document may be the subject of patent rights. Issue organization of this standard isn't held responsible for identifying any or all such patent rights. This standard was proposed by and is under the jurisdiction of Standards and Metrology Research Institute of MOR. Drafting organizations of this standard: Metal and Chemistry Research Institute of China Academy of Railway Sciences, Standards and Metrology Research Institute of MOR, Ansteel Group Co., Ltd., Anshan Iron and Steel Group Corporation, Baotou Iron & Steel Group Co., Ltd., Wuhan Iron and Steel (Group) Corporation, Resident Rail Quality Supervision Centers of Ministry of Railways. Chief drafting staff of this standard: Zhang Yinhua, Zhou Qingyue, Wang Shuqing, Zhu Mei, Chen Zhaoyang, Liu Fengshou, Zhang Hong, Zuo Yan, Zhi Jianguo, Wu Jinhua, Lv Xuebin, Dong Huali. PROFESSIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA 中华人民共和国铁道行业标准 TB/T 2344-2012 Supersedes TB/T 2344-2003 Partially supersedes TB/T 2635-2004 Technical Specifications for the Procurement of 43 kg/m~75 kg/m Rails 43 kg/m~75 kg/m钢轨订货技术条件 1 Scope This standard specifies the terms and definitions, ordering information, model dimension and limit deviations, technical requirements, test methods, inspection rules, marking and quality certificate, quality assurance, etc. for 43 kg/m~75 kg/m rails. This standard is applicable to 43 kg/m~75 kg/m hot-rolled and online heat-treated rails for railway with a maximum running speed of 160 km/h. For heat-treated rails for high speed railway, it may apply. 2 Normative References The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB/T 223.14 Methods for Chemical Analysis of Iron, Steel and Alloy - The N-benzoy-N-phenylhydroxylamine Extraction Photometric Method for the Determination of Vanadium Content GB/T 223.49 Methods for Chemical Analysis of Iron, Steel and Alloy Extraction Separation - Chlorophosphonazo mA Spectrophotometric Method for the Determination of the Total Rare Earth Content GB/T 223.60 Methods for Chemical Analysis of Iron, Steel and Alloy - The Perchloric Acid Dehydration Gravimetric Method for the Determination of Silicon Content GB/T 223.62 Methods for Chemical Analysis of Iron, Steel and Alloy - The Butyl Acetate Extraction Photometric Method for the Determination of Phosphorus Content GB/T 223.63 Methods for Chemical Analysis of Iron, Steel and Alloy - The Sodium (Potassium) Periodate Photometric Method for the Determination of Manganese Content GB/T 223.68 Methods for Chemical Analysis of Iron, Steel and Alloy - The Potassium Iodate Titration Method after Combustion in the Pipe Furnace for the Determination of Sulfur Content GB/T 223.71 Methods for Chemical Analysis of Iron, Steel and Alloy - The Gravimetric Method after Combustion in the Pipe Furnace for the Determination of Carbon Content GB/T 223.82 Steel and Iron - Determination of Hydrogen Content - Inert Gas Impulse Fusion Heat Conductivity Method GB/T 226 Etch Test for Macrostructure and Defect of Steels GB/T 228.1 Metallic Materials - Tensile Testing - Part 1: Method of Test at Room Temperature" GB/T 230.1 Metallic Materials - Rockwell Hardness Test Part 1: Test Method GB/T 231.1 Metallic Materials - Brinell Hardness Test - Part 1: Test Method GB/T 3075 Metallic Materials - Fatigue Testing - Axial-force-controlled Method GB/T 4161 Plane strain Fracture Toughness KIC Test Method for Metal Material GB/T 4336 Standard Test Method for Spark Discharge Atomic Emission Spectrometric Analysis of Carbon and Low-alloy Steel (Routine Method) GB/T 4340.1 Metallic Materials-Vickers Hardness Test - Part 1: Test Method GB/T 6398. STANDARD Test Method for Fatigue Crack Growth Rates of Metallic Materials GB/T 10561-2005 Steel Determination of Content of Nonmetallic Inclusions Micrographic Method Using Standards Diagrams GB/T 11261 Steel and Iron - Determination of Oxygen Content - The Pulse Heating Inert Gas Fusion-Infra-red Absorption Method GB/T 13298 Metal-Inspection Method of Microstructure GB/T 19001 Quality Management Systems Requirements GB/T 20066 Steel and Iron - Sampling and Preparation of Samples for the Determination of Chemical Composition GB/T 20123 Steel and Iron - Determination of Total Carbon and Sulfur Content Infrared Absorption Method after Combustion in an Induction Furnace (Routine Method) GB/T 20124 Steel and Iron - Determination of Nitrogen Content - Thermal Conductimetric Method after Fusion in a Current of Inert Gas YB/T 081 Rule for Rounding off of Numerical Values and Judgment of Testing Values for Technical Standards of Metallurgy YB/T 951 Method of the Ultrasonic Inspection for Rails 3 Terms and Definitions For the purpose of this standard, the following terms and definitions apply. 3.1 Heat All the blanks casted with one heat, excluding the first blank casted with the next heat entering into the tundish 3.2 Sequence Continuous casting of different heats of the same designation in tundish 3.3 Transition area Parts casted by two heats 3.4 Online heat-treatment Heat treatment by which fine lamellar pearlite structures are obtained by direct accelerated cooling with the residual heat of rolling. 4 Ordering Information The user shall provide the following basic information for order: a) product name; b) product standard reference; c) rail model; d) steel designation and delivery condition; e) machined condition of rail end (bore number at one or both ends, and with rail end heat treated or not); f) length, quantity and undergauge rate; g) other requirements. 5 Model Dimension, Length, Weight and Limit Deviations 5.1 Model Dimension and Limit Deviations 5.1.1 The model dimensions of rail profile shall meet the requirements of Appendix A. 5.1.2 The dimensional limit deviations of rail profile, end face, length and bolthole shall be in accordance with those specified in Table 1. 5.2 Straightness and Distortion The rail straightness and distortion shall meet those specified in Table 2. Table 1 Dimensional Limit Deviations Unit: mm Item Limit deviation Template drawing a 43 kg/m 50 kg/m, 60 kg/m, 75 kg/m Rail height (H) ±0.6 ±0.6 Figure B.3 Railhead width (WH) ±0.5 ±0.5 Figure B.4 Crest plumpness b(C) +0.6 -0.5 Figure B.5 Profile asymmetry (AB) ±1.5 ±1.2 Figure B.6 Inclination of joint bar mounting face (with reference to the inclination of the 14 mm length parallel to the theoretical bevel of joint bar) (IF) ±0.50 ±0.50 Figure B.7 Height of joint bar mounting face (HF) +0.6 -0.5 +0.6 -0.5 Figure B.7 Web thickness (WT) +1.0 -0.5 +1.0 -0.5 Figure B.8 Foot width (WF) +1.0 -1.5 +1.0 -1.5 Figure B.9 Foot edge thickness (TF) +0.75 -0.5 Figure B.10 Fo recess ≤0.4 ≤0.4 End face inclination (vertical and horizontal) ≤0.8 ≤0.8 Bolthole diameter ±0.8 ±0.8 Figure B.11 Bolthole position ±0.8 ±0.8 Figure B.12 Integrated deviation of bolthole diameter and position(Td/c) 2.0 2.0 Length (20ºC) Welded rail ≤25 m rail ±10 >25 m rail ±30 Holed rail ≤25 m rail ±6 a See Appendix B for the template drawing for geometric dimension check of rail. b No requirement of crest plumpness for 50 kg/m rails. 5.3 Bolthole No bolthole is machined for welded rails. The boltholes, where required, shall be indicated in the contract. The bolthole edge of rail shall be chamfered to 0.8 mm~1.5 mm and 45°. 5.4 Rail End Chamfering The part of holed rail from the rail end/head to the lower rounding shall be chamfered as specified in Appendix A.
Contents of TB/T 2344-2012
Foreword i 1 Scope 2 Normative References 3 Terms and Definitions 4 Ordering Information 5 Model Dimension, Length, Weight and Limit Deviations 5.1 Model Dimension and Limit Deviations 5.2 Straightness and Distortion 5.3 Bolthole 5.4 Rail End Chamfering 5.5 Length and Weight 6 Technical Requirements 6.1 Manufacturing Method 6.2 Designation and Chemical Composition 6.3 Tensile Property 6.4 Hardness 6.5 Microstructure 6.6 Decarburized Layer 6.7 Nonmetallic Inclusion 6.8 Macrostructure 6.9 Drop Weight 6.10 Surface Quality 6.11 Ultrasonic Testing 6.12 Residual Stress of Foot 6.13 Fracture Toughness 6.14 Fatigue Crack Growth 6.15 Fatigue 6.16 Heat Treatment of Rail End 7 Test Method 7.1 Inspection Item, Inspection Frequency, Sampling Position and Test Method 7.2 Hydrogen Content 7.3 Total Oxygen Content and Nitrogen Content 7.4 Hardness 7.5 Microstructure 7.6 Drop weight 7.7 Ultrasonic Testing 7.8 Residual Stress at Rail Root 7.9 Fracture Toughness 7.10 Fatigue Crack Growth 7.11 Fatigue 8 Inspection Rules 8.1 Supervision 8.2 Type Inspection 8.3 Delivery Inspection 8.4 Re-inspection and Judgment 8.5 Numerical Rounding 9 Mark and Quality Certificate 9.1 Mark 9.2 Quality Certification 10 Quality Assurance 10.1 Quality Assurance System 10.2 Quality Guarantee Period Appendix A (Normative) Type and Dimension of 43kg/m ~ 75kg/m Rails Appendix B (Normative) Schematic Diagram for the Geometric Dimension Inspection Template of Rail Appendix C (Normative) Unallowable Defects on the Transversal Acid Leached Test Plate of Rail Appendix D (Normative) Test Method for Rail Plane Strain Fracture Toughness KIC Appendix E (Normative) Heat-Treatment Technical Conditions for Rail End Appendix F (Normative) Measured Method for Longitudinal Residual Stress of Foot
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
TB/T 2344-2012, TB 2344-2012, TBT 2344-2012, TB/T2344-2012, TB/T 2344, TB/T2344, TB2344-2012, TB 2344, TB2344, TBT2344-2012, TBT 2344, TBT2344