2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB/T 51368-2019
GB/T 51368-2019   Technical standard for photovoltaic system on building (English Version)
Standard No.: GB/T 51368-2019 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 20000 words Translation Price(USD):400.0 remind me the price change

Email:

Implemented on:2019-12-1 Delivery: via email in 1 business day

→ → →

,,2019-12-1,5BDF514A2EB629091569380888268
Standard No.: GB/T 51368-2019
English Name: Technical standard for photovoltaic system on building
Chinese Name: 建筑光伏系统应用技术标准
Professional Classification: GB    National Standard
Source Content Issued by: MOHURD
Issued on: 2019-06-19
Implemented on: 2019-12-1
Status: valid
Superseding:JGJ 203-2010 Technical code for application of solar photovoltaic system of civil buildings
Target Language: English
File Format: PDF
Word Count: 20000 words
Translation Price(USD): 400.0
Delivery: via email in 1 business day
Codeofchina.com is in charge of this English translation. In case of any doubt about the English translation, the Chinese original shall be considered authoritative. According to the requirements of Notice on printing and distributing the development and revision plan on engineering construction standards and codes in 2013 (JIANBIAO [2013] No.6) issued by the Ministry of Housing and Urban-Rural Development of the People's Republic of China, the drafting group has formulated this standard through extensive investigation and study, careful summing up of experience from practices, and reference to relevant international and foreign advanced standards and on the basis of widely soliciting for opinions. The main technical contents of this standard are: 1. General requirements; 2 Terms; 3 Basic requirements; 4. General conditions; 5 Equipment and materials; 6 Design; 7 Structure design; 8 Power generation system design; 9 Construction; 10 Environmental protection; 11 Labor safety and occupational health; 12 Firefighting; 13. Acceptance; 14 Operation and maintenance. This standard is under the administration of MOHURD, with the interpretation of its specific technical contents in the charge of China Electricity Council. During the process of implementing this standard, the relevant comments and recommendations, whenever necessary, can be fed back to China Electricity Council (No.1, 2nd Lane, Baiguang Road, Beijing, 100761, China). Technical standard for photovoltaic system on building 1 General provisions 1.0.1 This standard is formulated to promote the energy saving and emission reduction of building, popularize the application of photovoltaic system in building, and standardize the design, construction, acceptance, operation and maintenance of building mounted PV system. 1.0.2 This standard is applicable to the design, construction, acceptance, operation and maintenance of the constructed, extended and renovated building mounted PV system. 1.0.3 In addition to this standard, the design, construction, acceptance, operation and maintenance of building mounted PV system shall also meet the requirements of the relevant current national standards. 2 Terms 2.0.1 building mounted photovoltaic (PV) system power generation system that is mounted on a building and directly converts solar radiation energy into electric energy by utilizing photovoltaic effect of solar cells 2.0.2 photovoltaic (PV) module minimum indivisible photovoltaic cell assembly which is equipped with package and internal connection and can independently provide DC output 2.0.3 photovoltaic module component PV module with building component function 2.0.4 combiner box device accessed for confluence after several PV modules are connected in series and parallel in a photovoltaic system 2.0.5 grid-connected inverter equipment that converts direct current from photovoltaic array or PV module into alternating current meeting the requirements of the power grid and feeds it into the power grid 2.0.6 building integrated photovoltaic (BIPV) photovoltaic equipment, which is applied on a building as building material or component 2.0.7 building attached photovoltaic (BAPV) photovoltaic equipment, which is mounted on an existing building in a form other than building material or component 2.0.8 stand-alone photovoltaic system photovoltaic system that is not connected to public power grid, also known as off-grid photovoltaic system 3 Basic requirements 3.0.1 The power generation scale and form of building mounted PV system shall be determined in combination with factors such as solar energy resources, building conditions, mounting and transportation conditions and load characteristics, and shall meet the requirements of safety, reliability, economic applicability, environmental protection and aesthetics as well as convenience for mounting and maintenance. 3.0.2 The construction of building mounted PV system shall be coordinated with the overall planning and power planning of the local region. 3.0.3 For the design of building mounted PV system, the local solar radiation resources and the influence of the surrounding environment on solar radiation and system operation shall be analyzed. 3.0.4 BIPV and BAPV may be adopted as the building mounted PV system. The construction conditions for building mounted PV system should be reserved during building design. 3.0.5 The PV system mounted on the constructed building shall be designed, constructed and accepted synchronously with the main building. 3.0.6 The building mounted PV system shall be considered in the load calculation of main structure and enclosure structure of the building. 3.0.7 The structural safety, durability and electrical safety of the existing building with building mounted PV system attached shall be rechecked. 4 General conditions 4.0.1 Before the design of the building mounted PV system, the following environmental information of the region where the construction project is located shall be obtained: 1 solar energy resource data and resource analysis report; 2 seismic fortification requirements of the region where the construction project is located; 3 basic wind pressure and basic snow pressure of the region where the construction project is located; 4 corrosion of salt spray and acid rain of the region where the construction project is located; 5 the average annual number of sandstorms, lightning strikes on buildings, air pollution and visibility in the past 10 years; 6 control requirements of surrounding building users for noise and light pollution. 4.0.2 Before the design of the access of building mounted PV system to the power grid, the following information should be obtained: 1 the installed capacity, generating capacity, annual utilization hours, operation time and operation cycle of building mounted PV system; 2 the voltage grade, main transformer capacity, main transformer reserved capacity, reserved outgoing line spacing and extension conditions for access to power grid; 3 the laying method, type, length and path of cable; 4 the type and access capacity of other power supplies at access point; 5 types of electrical loads such as industrial electricity consumption, commercial electricity consumption and residential electricity consumption; 6 electrical loads of the building and the region; 7 quality requirements for electric energy in electrical load area; 8 remote dispatching requirements; 9 measurement points and methods of on-grid/off-grid energy; 10 consumption methods. 4.0.3 Before the design of the building mounted PV system, the following building information should be obtained: 1 building scale and main functions; 2 building types such as industrial buildings and civil buildings; 3 the number of floors and height of the building, and the control requirements for building height; 4 building line requirements; 5 building modeling and appearance design requirements; 6 design service life of the building; 7 thermal performance requirements of climate zoning for the building enclosure; 8 building roof waterproofing grade and basic construction; 9 requirements for various building physical performance indexes, in-plane deformation performance and seismic requirements of the building enclosure; 10 the fire resistance rating of building and the combustion performance and fire endurance of corresponding components of buildings with different fire resistance ratings; 11 structure type and standard load value of building. 5 Equipment and materials 5.1 General requirements 5.1.1 The equipment and materials of building mounted PV system shall meet the building safety requirements, and shall meet the building functional requirements when used as building materials or components. 5.1.2 The selection of equipment and materials for building mounted PV system shall be coordinated with the building appearance and use function. 5.1.3 Corresponding module types, structural schemes and structural measures shall be adopted for the building design of building mounted PV system according to functional requirements. 5.1.4 The photovoltaic equipment and module components of the building shall meet the requirements for strength, rigidity and stability during transportation, mounting and use. 5.2 PV module 5.2.1 The following types of PV modules for buildings may be selected according to different classification modes: 1 general PV modules and photovoltaic module components may be selected according to the combination with buildings; 2 crystalline silicon PV modules, thin-film PV modules and other types may be selected according to the type of PV cell. 5.2.2 The crystalline silicon PV modules shall meet the relevant requirements of the current national standard GB/T 9535 Crystalline silicon terrestrial photovoltaic (PV) modules-design qualification and type approval, and the thin-film PV modules shall meet those of the current national standard GB/T 18911 Thin-film terrestrial photovoltaic (PV) modules - Design qualification and type approval. 5.2.3 The safety performance of PV modules shall meet the relevant requirements of the current national standard GB/T 20047.1 Photovoltaic (PV)module safety qualification - Part 1: Requirements for construction. 5.2.4 The application of laminated photovoltaic glass to the building mounted PV system shall meet the relevant requirements of the current national standard GB/T 29551 Laminated solar PV glazing materials in building, and the application of insulating photovoltaic glass shall meet those of the current national standard GB/T 29759 Sealed insulating solar PV glass unit in building. 5.2.5 The quality of photovoltaic module component when used as the glass curtain wall of building shall meet the relevant requirements of the current professional standard JGJ 102 Technical code for glass curtain wall engineering. 5.2.6 The color uniformity of the exterior photovoltaic module component of building shall meet the relevant requirements of the current professional standard JG/T 492 General specification of photovoltaic components for building. 5.2.7 The building mounted PV system shall meet the requirements of local special environmental conditions such as dry heat, humid heat, high altitude, coastal area, desert, strong wind and heavy snowfall. 5.2.8 The polysilicon, monocrystalline silicon and thin-film cell module shall have an attenuation rate of not higher than 2.5%, 3%, and 5% respectively within one year after the project is put into operation; thereafter, the annual attenuation rate shall not exceed 0.7%. 5.2.9 The service life of PV modules used for photovoltaic skylight, transparent photovoltaic curtain wall, non-transparent photovoltaic curtain wall, photovoltaic window, photovoltaic sunshade, etc. shall not be less than that of the building enclosure, and shall meet the relevant requirements of the current professional standard JG/T 492 General specification of photovoltaic components for building. 5.2.10 The fire protection rating of PV modules shall not be lower than the material fire protection rating required for the building. 5.3 Materials 5.3.1 The aluminum alloy and steel for the building mounted PV system shall meet the relevant requirements of the current national standards. 5.3.2 The silicone sealant and sealing materials for the building mounted PV system shall meet the relevant requirements of the current national standards. 5.3.3 Other materials for the building mounted PV system shall meet the following requirements: 1 Insulating spacers shall be arranged or other anti-corrosion measures be taken at the contact parts of different metal materials (other than stainless steel) used in the system. 2 Connecting pieces, fasteners and combined fittings for the building mounted PV system should be made of stainless steel or aluminum alloy.
Foreword i 1 General provisions 2 Terms 3 Basic requirements 4 General conditions 5 Equipment and materials 5.1 General requirements 5.2 PV module 5.3 Materials 5.4 Cable 5.5 Cable bridge and cable protection tube 5.6 Combiner box 5.7 AC/DC power distribution cabinet 5.8 Inverter 5.9 Energy storage system 5.10 Lightning protection and grounding 6 Design 6.1 General requirements 6.2 Building design 6.3 Design of PV module 6.4 Construction requirements 7 Structure design 7.1 General requirements 7.2 Parameter of design 7.3 Load and action 7.4 Structure design of photovoltaic module component 7.5 Supporting structure design 7.6 Connection structure design 8 Photovoltaic system design 8.1 General requirements 8.2 Classification of photovoltaic systems 8.3 Interconnected system 8.4 Primary photovoltaic system 8.5 Photovoltaic array 8.6 Transformer and power distribution device 8.7 Self power supply system 8.8 Reactive power compensation device 8.9 Secondary electrical system 8.10 Protection against effects of overvoltage and grounding faults 8.11 Cable laying 8.12 Energy storage system 8.13 Calculation of generating capacity 9 Construction 9.1 General requirements 9.2 Civil works 9.3 Electrical installation 9.4 System debugging 10 Environmental protection 10.1 General requirements 10.2 Protection against environment pollution 11 Labor safety and occupational health 11.1 General requirements 11.2 General layout of project 11.3 Labor safety and occupational health measures 12 Firefighting 12.1 General requirements 12.2 Fire prevention and evacuation 12.3 Fire control facility 13 Acceptance 14 Operation and maintenance 14.1 General requirements 14.2 Photovoltaic array 14.3 Wires and cables 14.4 Electrical equipment 14.5 Energy storage system 14.6 Lightning protection and grounding Annex A Test items for PV modules/array inspection Explanation of wording in this standard List of quoted standards
Referred in GB/T 51368-2019:
*GB/T 50002-2013 Standard for modular coordination of buildings
*GB 50009-2012 Load Code for the Design of Building Structures
*GB 50011-2010(2016) Code for Seismic Design of Buildings (2016)
*GB 50016-2014(2018)-Provisions Provisions of Code for Fire Protection Design of Buildings
*GB 50017-2017 Code for design of steel structures
*GB 50018-2002 Technical Code of Cold-formed Thin-wall Steel Structures
*GB 50026-2020 Standard for engineering surveying
*GB 50033-2013 Standard for daylighting design of buildings
*GB 50034-2013 Standard for lighting design of buildings
*GB 50054-2011 Code for design of low voltage eletrical installations
*GB 50057-2010 Design Code for Protection of Structures against Lightning
*GB 50058-2014 Code for Design of Electrical Installations in Explosive Atmospheres
*GB 50060-2008 Code for Design of High Voltage Electrical Installation (3~110kV)
*GB/T 50063-2017 Code for design of electrical measuring device of power system
*GB/T 50064-2014 Code for design of overvoltage protection and insulation coordination for AC electrcal installations
*GB/T 50065-2011 Code for Earthing Design of AC Electrical Installations
*GB/T 50087-2013 Code for design of noise control of industrial enterprises
*GB 50140-2005 Code for Design of Extinguisher Distribution in Buildings
*GB 50147-2010 High-Voltage Electric Equipment Installation Engineering
*GB 50148-2010 Code for Construction and Acceptance of Power Transformers, Oil Reactor and Mutual Inductor
*GB 50149-2010 Code for Construction and Acceptance of Busbar Installation of Electric Equipment
*GBT50150-
*GB 50168-2018 Standard for construction and acceptance of cable line electric equipment installation engineering
*GB 50169-2016 Code for construction and acceptance of grounding connection electric equipment installation engineering
*GB 50171-2012 Erection works of electrical installations Code for construction and acceptance of switchboard outfit,complete cubicle and secondary circuit
*GB 50172-2012 Erection works of electrical installations Code for construction and acceptance of battery
*GB 50194-2014 Safety code of power supply and consumption for installation construction engineering
*GB 50204-2015 Code for acceptance of constructional quallty of concrete structures
*GB 50205-2020 Standard for acceptance of construction quality of steel structures
*GB 50217-2018 Standard for design of cables of electric power engineering
*GB 50222-2017 Code for Fire Prevention in Design of Interior Decoration of Buildings
*GB 50227-2017 Code for design of installation of shunt capacitors
*GB 50254-2014 Code for construction and acceptance of low-voltage apparatus electric equipment installation engineering
*GB 50352-2019 Unified standard for design of civil building
*GB 50370-2005 Code for design of gas fire extinguishing systems
*GB 50429-2007 Code for design of aluminium structures
*GB 50576-2010 Code for acceptance of construction quality of aluminium structures
*GB 50794-2012 Code for construction of PV power station
*GB 50797-2012 Code for design of photovoltaic power station
*GB/T 50865-2013 Code for Design of Photovoltaic Generation Connecting to Distribution Network
*GB/T 50866-2013 Design code for photovoltaic power station connecting to power system
*GB 51048-2014 Design code for electrochemical energy storage station
*GB 2893-2008 Safety colours
*GB 2894-2008 Safety Signs and Guideline for the Use
*GB/T 2951.11-2008 Common test methods for insulating and sheathing materials of electric and optical cables - Part 11:Methods for general application - Measurement of thickness and overall dimensions
*GB/T 2951.12-2008 Common test methods for insulating and sheathing materials of electric and optical cables - Part 12: Methods for general application - Thermal ageing methods
*GB/T 2951.51-2008 Common test methods for insulating and sheathing materials of electric and optical cables - Part 51: Methods specific to filling compounds - Drop point - Separation of oil - Lower te
*GB 3096-2008 Environmental Quality Standard for Noise
*GB/T 3608-2008 Classification of work at heights
*GB/T 4208-2017 Degrees of protection provided by enclosure(IP code)
*GB 5083-1999 General rules for designing the production facilities in accordance with safety and health requirements
*GB/T 6451-2015 Specification and technical requirements for oil-immersd power transformers
*GB 7251.1-2013 Low-voltage switchgear and controlgear assemblies-Part 1:General rules
*GB/T 8196-2018 Safety of machinery—Guards—General requirements for the design and construction of fixed and movable guards
*GB/T 9535-1998 Crystalline silicon terrestrial photovoltaic(PV) modules-design qualification and type approval
*GB/T 10228-2015 Specification and technical requirements for dry-type power transformers
*GB/T 10233-2016 Basic testing method for low-voltage switchgear and controlgear assemblies
*GB/T 12325-2008 Power quality - Deviation of supply voltage
*GB/T 12326-2008 Power quality - Voltage fluctuation and flicker
*GB 12523-2011 Emisson standard of environment noise for boundary of construction site
*GB/T 12801-2008 General Principles for the Requirements of Safety and Health in Production Process
*GB/T 14285-2006 Technical Code for Relaying Protection and Security Automatic Equipment
*GB 14287-1993 Residual current operated alarm devices for fire prevention
*GB/T 14549-1993 Quality of Electric Energy Supply - Harmonics in Public Supply Network
*GB/T 15543-2008 Power quality—Three-phase voltage
*GB 16895.21-2011 Low-voltage electrical installations—Part 4-41:Protection for safety—Protection against electric shock
*GB/T 18857-2019 Technical guide for live working on distribution line
*GB/T 18911-2002 Thin-film terrestrial photovoltaic (PV) modules - Design qualification and type approval
*GB/T 19216.11-2003 Tests for electric cables under fire conditions - Circuit integrity - Part 11: Apparatus - Fire alone at a flame temperature of at least 750℃
*GB/T 19216.21-2003 Tests for electric cables under fire conditions - Circuit integrity - Part 21: Procedures and requirements - Cable of rated voltage up to and including 0.6/1.0 kV
*GB/T 19862-2016 General requirements for monitoring equipments of power quality
*GB/T 19964-2012 Technical requirements for connecting photovoltaic power station to power system
*GB/T 20047.1-2006 Photovoltaic (PV)module safety qualification - Part 1:Requirements for construction
*GB 20052-2020 Minimum allowable values of energy efficiency and the energy efficiency grades for power transformers
*GB/T 21086-2007 Curtain Wall for Building
*GB/T 22473-2008 Lead-acid storage batteries used for energy storage
*GB/T 23639-2017 Energy conservation and corrosion-resistant steel-made cable support system
*GB/T 24337-2009 Power quality—Interharmonics in public supply network
*GB/T 24612.1-2009 Requirements for electrical safety in the workplace—Part 1:General rules
*GB/T 24612.2-2009 Requirements for electrical safety in the workplace—Part 2:Safety measure of operation on power off
*GB 24790-2009 Minimum allowable values of energy efficiency and the energy efficiency grades for power transformers
*GB/T 29319-2012 Technical requirements for connecting photovoltaic power system to distribution network
*GB/T 29321-2012 Technical specification for reactive power compensation of PV power station
*GBT29551-
*GB/T 29759-2013 Sealed insulating solar PV glass unit in building
*GB/T 31366-2015 Technical requirements for monitoring and control system of photovoltaic power station
*GB/T 32512-2016 Technical requirements for protection of photovoltaic power station against lightning
*GB/T 34120-2017 Technical specification for power conversion system of electrochemical energy storage system
*GB/T 34131-2017 Technical standard for battery management system of electrochemical energy storage station
*GB/T 34133-2017 Testing code for power converter of electrochemical energy storage system
*GB/T 34931-2017 Testing code for reactive power compensation device of photovoltaic power station
*GB/T 34933-2017 Technical code for combiner box test of photovoltaic power station
*GB/T 34936-2017 Technical requirement of combiner box for photovoltaic power station
*GB/T 35694-2017 Safety code of photovoltaic power station
*GB/T 36558-2018 General technical requirements for electrochemical energy storage system in power system
*DL/T 596-2021 Preventive test code for electric power equipment
*DL/T 614-2007 Multifunction electricity meterring equipment (A.C.)
*DL/T 645-2007 Multi-function watt-hour meter communication protocol
*DL/T 724-2021 Specification of operation and maintenance of battery DC power supply equipment for electric power system
*DL/T 1364-2014 Specification of Lightning Protection Technology in Photovoltaic Power Station
*DL/T 5202-2022 Code for design of electric energy metering system
*DL/T 5222-2021 Code for design of the conductor and electrical equipment selection
*JGJ 80-2016 Technical Code for Working Safely at Height of Building Construction
*JGJ 102-2003 Technical code for glass curtain wall engineering
*JGJ 113-2015 Technical specification for application of architectural glass
*JGJ/T 139-2020 Standard for testing of quality of glass curtain wall engineering
*JGJ 255-2012 Technical specification for skylight and metal roof
*NB/T 32034-2016 On-site testing procedure for PV module of PV power station
*NB/T 42073-2016 Electric cables for photovoltaic systems
*JG/T 274-2018 General technical requirements for blinds and shutters
*JG/T 492-2016 General Technical Requirements for PV Member Used for Buildings
Code of China
Standard
GB/T 51368-2019  Technical standard for photovoltaic system on building (English Version)
Standard No.GB/T 51368-2019
Statusvalid
LanguageEnglish
File FormatPDF
Word Count20000 words
Price(USD)400.0
Implemented on2019-12-1
Deliveryvia email in 1 business day
Detail of GB/T 51368-2019
Standard No.
GB/T 51368-2019
English Name
Technical standard for photovoltaic system on building
Chinese Name
建筑光伏系统应用技术标准
Chinese Classification
Professional Classification
GB
ICS Classification
Issued by
MOHURD
Issued on
2019-06-19
Implemented on
2019-12-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
JGJ 203-2010 Technical code for application of solar photovoltaic system of civil buildings
Language
English
File Format
PDF
Word Count
20000 words
Price(USD)
400.0
Keywords
GB/T 51368-2019, GB 51368-2019, GBT 51368-2019, GB/T51368-2019, GB/T 51368, GB/T51368, GB51368-2019, GB 51368, GB51368, GBT51368-2019, GBT 51368, GBT51368
Introduction of GB/T 51368-2019
Codeofchina.com is in charge of this English translation. In case of any doubt about the English translation, the Chinese original shall be considered authoritative. According to the requirements of Notice on printing and distributing the development and revision plan on engineering construction standards and codes in 2013 (JIANBIAO [2013] No.6) issued by the Ministry of Housing and Urban-Rural Development of the People's Republic of China, the drafting group has formulated this standard through extensive investigation and study, careful summing up of experience from practices, and reference to relevant international and foreign advanced standards and on the basis of widely soliciting for opinions. The main technical contents of this standard are: 1. General requirements; 2 Terms; 3 Basic requirements; 4. General conditions; 5 Equipment and materials; 6 Design; 7 Structure design; 8 Power generation system design; 9 Construction; 10 Environmental protection; 11 Labor safety and occupational health; 12 Firefighting; 13. Acceptance; 14 Operation and maintenance. This standard is under the administration of MOHURD, with the interpretation of its specific technical contents in the charge of China Electricity Council. During the process of implementing this standard, the relevant comments and recommendations, whenever necessary, can be fed back to China Electricity Council (No.1, 2nd Lane, Baiguang Road, Beijing, 100761, China). Technical standard for photovoltaic system on building 1 General provisions 1.0.1 This standard is formulated to promote the energy saving and emission reduction of building, popularize the application of photovoltaic system in building, and standardize the design, construction, acceptance, operation and maintenance of building mounted PV system. 1.0.2 This standard is applicable to the design, construction, acceptance, operation and maintenance of the constructed, extended and renovated building mounted PV system. 1.0.3 In addition to this standard, the design, construction, acceptance, operation and maintenance of building mounted PV system shall also meet the requirements of the relevant current national standards. 2 Terms 2.0.1 building mounted photovoltaic (PV) system power generation system that is mounted on a building and directly converts solar radiation energy into electric energy by utilizing photovoltaic effect of solar cells 2.0.2 photovoltaic (PV) module minimum indivisible photovoltaic cell assembly which is equipped with package and internal connection and can independently provide DC output 2.0.3 photovoltaic module component PV module with building component function 2.0.4 combiner box device accessed for confluence after several PV modules are connected in series and parallel in a photovoltaic system 2.0.5 grid-connected inverter equipment that converts direct current from photovoltaic array or PV module into alternating current meeting the requirements of the power grid and feeds it into the power grid 2.0.6 building integrated photovoltaic (BIPV) photovoltaic equipment, which is applied on a building as building material or component 2.0.7 building attached photovoltaic (BAPV) photovoltaic equipment, which is mounted on an existing building in a form other than building material or component 2.0.8 stand-alone photovoltaic system photovoltaic system that is not connected to public power grid, also known as off-grid photovoltaic system 3 Basic requirements 3.0.1 The power generation scale and form of building mounted PV system shall be determined in combination with factors such as solar energy resources, building conditions, mounting and transportation conditions and load characteristics, and shall meet the requirements of safety, reliability, economic applicability, environmental protection and aesthetics as well as convenience for mounting and maintenance. 3.0.2 The construction of building mounted PV system shall be coordinated with the overall planning and power planning of the local region. 3.0.3 For the design of building mounted PV system, the local solar radiation resources and the influence of the surrounding environment on solar radiation and system operation shall be analyzed. 3.0.4 BIPV and BAPV may be adopted as the building mounted PV system. The construction conditions for building mounted PV system should be reserved during building design. 3.0.5 The PV system mounted on the constructed building shall be designed, constructed and accepted synchronously with the main building. 3.0.6 The building mounted PV system shall be considered in the load calculation of main structure and enclosure structure of the building. 3.0.7 The structural safety, durability and electrical safety of the existing building with building mounted PV system attached shall be rechecked. 4 General conditions 4.0.1 Before the design of the building mounted PV system, the following environmental information of the region where the construction project is located shall be obtained: 1 solar energy resource data and resource analysis report; 2 seismic fortification requirements of the region where the construction project is located; 3 basic wind pressure and basic snow pressure of the region where the construction project is located; 4 corrosion of salt spray and acid rain of the region where the construction project is located; 5 the average annual number of sandstorms, lightning strikes on buildings, air pollution and visibility in the past 10 years; 6 control requirements of surrounding building users for noise and light pollution. 4.0.2 Before the design of the access of building mounted PV system to the power grid, the following information should be obtained: 1 the installed capacity, generating capacity, annual utilization hours, operation time and operation cycle of building mounted PV system; 2 the voltage grade, main transformer capacity, main transformer reserved capacity, reserved outgoing line spacing and extension conditions for access to power grid; 3 the laying method, type, length and path of cable; 4 the type and access capacity of other power supplies at access point; 5 types of electrical loads such as industrial electricity consumption, commercial electricity consumption and residential electricity consumption; 6 electrical loads of the building and the region; 7 quality requirements for electric energy in electrical load area; 8 remote dispatching requirements; 9 measurement points and methods of on-grid/off-grid energy; 10 consumption methods. 4.0.3 Before the design of the building mounted PV system, the following building information should be obtained: 1 building scale and main functions; 2 building types such as industrial buildings and civil buildings; 3 the number of floors and height of the building, and the control requirements for building height; 4 building line requirements; 5 building modeling and appearance design requirements; 6 design service life of the building; 7 thermal performance requirements of climate zoning for the building enclosure; 8 building roof waterproofing grade and basic construction; 9 requirements for various building physical performance indexes, in-plane deformation performance and seismic requirements of the building enclosure; 10 the fire resistance rating of building and the combustion performance and fire endurance of corresponding components of buildings with different fire resistance ratings; 11 structure type and standard load value of building. 5 Equipment and materials 5.1 General requirements 5.1.1 The equipment and materials of building mounted PV system shall meet the building safety requirements, and shall meet the building functional requirements when used as building materials or components. 5.1.2 The selection of equipment and materials for building mounted PV system shall be coordinated with the building appearance and use function. 5.1.3 Corresponding module types, structural schemes and structural measures shall be adopted for the building design of building mounted PV system according to functional requirements. 5.1.4 The photovoltaic equipment and module components of the building shall meet the requirements for strength, rigidity and stability during transportation, mounting and use. 5.2 PV module 5.2.1 The following types of PV modules for buildings may be selected according to different classification modes: 1 general PV modules and photovoltaic module components may be selected according to the combination with buildings; 2 crystalline silicon PV modules, thin-film PV modules and other types may be selected according to the type of PV cell. 5.2.2 The crystalline silicon PV modules shall meet the relevant requirements of the current national standard GB/T 9535 Crystalline silicon terrestrial photovoltaic (PV) modules-design qualification and type approval, and the thin-film PV modules shall meet those of the current national standard GB/T 18911 Thin-film terrestrial photovoltaic (PV) modules - Design qualification and type approval. 5.2.3 The safety performance of PV modules shall meet the relevant requirements of the current national standard GB/T 20047.1 Photovoltaic (PV)module safety qualification - Part 1: Requirements for construction. 5.2.4 The application of laminated photovoltaic glass to the building mounted PV system shall meet the relevant requirements of the current national standard GB/T 29551 Laminated solar PV glazing materials in building, and the application of insulating photovoltaic glass shall meet those of the current national standard GB/T 29759 Sealed insulating solar PV glass unit in building. 5.2.5 The quality of photovoltaic module component when used as the glass curtain wall of building shall meet the relevant requirements of the current professional standard JGJ 102 Technical code for glass curtain wall engineering. 5.2.6 The color uniformity of the exterior photovoltaic module component of building shall meet the relevant requirements of the current professional standard JG/T 492 General specification of photovoltaic components for building. 5.2.7 The building mounted PV system shall meet the requirements of local special environmental conditions such as dry heat, humid heat, high altitude, coastal area, desert, strong wind and heavy snowfall. 5.2.8 The polysilicon, monocrystalline silicon and thin-film cell module shall have an attenuation rate of not higher than 2.5%, 3%, and 5% respectively within one year after the project is put into operation; thereafter, the annual attenuation rate shall not exceed 0.7%. 5.2.9 The service life of PV modules used for photovoltaic skylight, transparent photovoltaic curtain wall, non-transparent photovoltaic curtain wall, photovoltaic window, photovoltaic sunshade, etc. shall not be less than that of the building enclosure, and shall meet the relevant requirements of the current professional standard JG/T 492 General specification of photovoltaic components for building. 5.2.10 The fire protection rating of PV modules shall not be lower than the material fire protection rating required for the building. 5.3 Materials 5.3.1 The aluminum alloy and steel for the building mounted PV system shall meet the relevant requirements of the current national standards. 5.3.2 The silicone sealant and sealing materials for the building mounted PV system shall meet the relevant requirements of the current national standards. 5.3.3 Other materials for the building mounted PV system shall meet the following requirements: 1 Insulating spacers shall be arranged or other anti-corrosion measures be taken at the contact parts of different metal materials (other than stainless steel) used in the system. 2 Connecting pieces, fasteners and combined fittings for the building mounted PV system should be made of stainless steel or aluminum alloy.
Contents of GB/T 51368-2019
Foreword i 1 General provisions 2 Terms 3 Basic requirements 4 General conditions 5 Equipment and materials 5.1 General requirements 5.2 PV module 5.3 Materials 5.4 Cable 5.5 Cable bridge and cable protection tube 5.6 Combiner box 5.7 AC/DC power distribution cabinet 5.8 Inverter 5.9 Energy storage system 5.10 Lightning protection and grounding 6 Design 6.1 General requirements 6.2 Building design 6.3 Design of PV module 6.4 Construction requirements 7 Structure design 7.1 General requirements 7.2 Parameter of design 7.3 Load and action 7.4 Structure design of photovoltaic module component 7.5 Supporting structure design 7.6 Connection structure design 8 Photovoltaic system design 8.1 General requirements 8.2 Classification of photovoltaic systems 8.3 Interconnected system 8.4 Primary photovoltaic system 8.5 Photovoltaic array 8.6 Transformer and power distribution device 8.7 Self power supply system 8.8 Reactive power compensation device 8.9 Secondary electrical system 8.10 Protection against effects of overvoltage and grounding faults 8.11 Cable laying 8.12 Energy storage system 8.13 Calculation of generating capacity 9 Construction 9.1 General requirements 9.2 Civil works 9.3 Electrical installation 9.4 System debugging 10 Environmental protection 10.1 General requirements 10.2 Protection against environment pollution 11 Labor safety and occupational health 11.1 General requirements 11.2 General layout of project 11.3 Labor safety and occupational health measures 12 Firefighting 12.1 General requirements 12.2 Fire prevention and evacuation 12.3 Fire control facility 13 Acceptance 14 Operation and maintenance 14.1 General requirements 14.2 Photovoltaic array 14.3 Wires and cables 14.4 Electrical equipment 14.5 Energy storage system 14.6 Lightning protection and grounding Annex A Test items for PV modules/array inspection Explanation of wording in this standard List of quoted standards
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB/T 51368-2019, GB 51368-2019, GBT 51368-2019, GB/T51368-2019, GB/T 51368, GB/T51368, GB51368-2019, GB 51368, GB51368, GBT51368-2019, GBT 51368, GBT51368